| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.4 CrAccepted-AOC | ₹2.4 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹2.4 CrRejected-AOC | ₹2.4 Cr | 2 | Rejected-AOC L2 |
| 3 | 3₹2.6 CrRejected-AOC | ₹2.6 Cr | 3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | HI-TECH ENGINEERING WORKS L2 | MAK ENTERPRISES L3 | MEDISHINE L1 |
|---|---|---|---|---|---|---|
| 1.00 | SUPPLY, INSTALLATION,TESTING & COMMISSIONING OF CRYOGENIC OXYGEN BUSTER PUMP CAPACITY 15 HP AS PER PESO CONDITION | 4 | Nos | 19,90,900 ₹79.6 L | 19,95,700 ₹79.8 L | 19,75,500 ₹79.0 L |
| 2.00 | SUPPLY, INSTALLATION,TESTING & COMMISSIONING OF 15 HP ELECTRICAL PANEL | 4 | Nos | 3,50,000 ₹14 L | 3,51,500 ₹14.1 L | 3,42,200 ₹13.7 L |
| 3.00 | SUPPLY, INSTALLATION,TESTING & COMMISSIONING OF CRYOGENIC OXYGEN VAPORISER CAPACITY 600Nm3/hr AS PER PESO CONDITION | 2 | Nos | 15,83,000 ₹31.7 L | 15,95,500 ₹31.9 L | 15,69,700 ₹31.4 L |
| 4.00 | RE-INSTALLATION OF 20KL OXYGEN TANK AS PER PESO CONDITION | 2 | Nos | 5,00,000 ₹10 L | 4,95,700 ₹9.9 L | 4,83,300 ₹9.7 L |
| 5.00 | RE-INSTALLATION OF PRESSURE REDUCING SYSTEM AS PER PESO CONDITION | 2 | Nos | 90,000 ₹1.8 L | 91,100 ₹1.8 L | 85,500 ₹1.7 L |
| 6.00 | RE-INSTALLATION OF LMO VAPOURISER AS PER PESO CONDITION | 1 | Nos | 2,87,700 ₹2.9 L | 2,90,900 ₹2.9 L | 2,83,300 ₹2.8 L |
| 7.00 | TESTING OF SAFETY VALVES OF 20KL OXYGEN TANK AS PER PESCO CONDITION | 2 | Nos | 50,000 ₹1 L | 52,200 ₹1.0 L | 48,800 ₹97,600 |
| 8.00 | TESTING OF 20KL OXYGEN TANK VACCUM LEAKAGE AS PER PESCO CONDITION | 2 | Nos | 2,56,600 ₹5.1 L | 2,60,600 ₹5.2 L | 2,51,100 ₹5.0 L |
| 9.00 | TRANSPORTATION, LOADING AND UNLOADING OF CRYOGENIC TANK, VAPOURISER , PR SYSTEM | 1 | Nos | 1,90,000 ₹1.9 L | 1,92,200 ₹1.9 L | 1,85,500 ₹1.9 L |
| 10.00 | SUPPLY, INSTALLATION,TESTING & COMMISSIONING OF TELEMETRY UNIT FOR 20KL OXYGEN TANK ALONG WITH TELEMETRY DATA ONLINE FOR THE PERIOD OF 5 YRS AS PER PESCO CONDITION | 2 | Nos | 3,65,500 ₹7.3 L | 3,66,600 ₹7.3 L | 3,53,700 ₹7.1 L |
Tender Value
Refer Docs
EMD Value
₹2.9 L
Closing Date
30 Jan 2024, 4:00 pmClosed
E.E.Mech.(South)
Municipal Power Laundry, Bhoiwada, parel, Mumbai-400012.
Work of re installation, testing and commissioning of 20KL capacity LMO tanks with allied major works at BMC Oxygen Bottling Plant, Mahul under Ch. Engineer MnE
2024_MCGM_980771_1
dy.ch.eng.MnE city 2897 dt 4.1.2023
Open Tender
Electrical and Maintenance Works
180 days
BMC Oxygen bottling plant, Mahul
As per tender documents
3 documents required · 3 mandatory
₹17,700
₹2.9 L
Worli Hub
6 Jun 2026
10 Jan 2024
31 Jan 2024
10 Jan 2024
30 Jan 2024
10 Jan 2024
17 Jan 2024
Amount
SUPPLY, INSTALLATION,TESTING & COMMISSIONING OF CRYOGENIC OXYGEN BUSTER PUMP CAPACITY 15 HP AS PER PESO CONDITION
SUPPLY, INSTALLATION,TESTING & COMMISSIONING OF 15 HP ELECTRICAL PANEL
SUPPLY, INSTALLATION,TESTING & COMMISSIONING OF CRYOGENIC OXYGEN VAPORISER CAPACITY 600Nm3/hr AS PER PESO CONDITION
RE-INSTALLATION OF 20KL OXYGEN TANK AS PER PESO CONDITION
RE-INSTALLATION OF PRESSURE REDUCING SYSTEM AS PER PESO CONDITION
RE-INSTALLATION OF LMO VAPOURISER AS PER PESO CONDITION
TESTING OF SAFETY VALVES OF 20KL OXYGEN TANK AS PER PESCO CONDITION
TESTING OF 20KL OXYGEN TANK VACCUM LEAKAGE AS PER PESCO CONDITION
TRANSPORTATION, LOADING AND UNLOADING OF CRYOGENIC TANK, VAPOURISER , PR SYSTEM
SUPPLY, INSTALLATION,TESTING & COMMISSIONING OF TELEMETRY UNIT FOR 20KL OXYGEN TANK ALONG WITH TELEMETRY DATA ONLINE FOR THE PERIOD OF 5 YRS AS PER PESCO CONDITION
SUPPLY, INSTALLATION,TESTING & COMMISSIONING OF 100 MM OXYGEN SS PIPELINE ALONG WITH ITS ACCESSORIES AS PER PESO CONDITION
SUPPLY, INSTALLATION,TESTING & COMMISSIONING OF 100 MM SIZE SS OXYGEN ISOLATION VALVE AS PER PESO CONDITION
SUPPLY, INSTALLATION,TESTING & COMMISSIONING OF 100MM SIZE NON-RETURN VALVE AS PER PESO CONDITION
LICENSING CHARGES FOR PESO LICENSE FOR 20 KL OXYGEN TANK
RE-INSTALLATION,TESTING& COMMISSOINING OF ANTI- CRASH BARRIER WITH NECESSARY RCC FOUNDATION.
FABRICATION & ERRECTION OF STORAGE AREA FOR FULL CYLINDER AS PER PESO NORMS
LICENSING CHARGES FOR PESO LICENSE FOR STORAGE AREA
SUPPLY, INSTALLATION,TESTING & COMMISSIONING OF INTERNAL CRYOGENIC SS PIPELINE 1 1/2 " INCH AS PER PESO CONDITION
SUPPLY, INSTALLATION,TESTING & COMMISSIONING OF CRYOGENIC OXYGEN VALVE 1/1.5 INCH
SUPPLY, INSTALLATION,TESTING & COMMISSIONING OF CRYOGENIC OXYGEN NON-RETURN VALVE 1/1.5 INCH
FABRICATION & ERRECTION OF MS PLATFORM FOR BUSTER PUMP AS PER PESO CODITION
PROVIDING & LAYING POWER SUPPLY CABLES ALONG WITH ALLIED WORKS
SUPPLY, INSTALLATION,TESTING & COMMISSIONING OF MAIN ELECTRIC PANEL FOR LMO PLANT
OPERATION OF CRYOGENIC BOOSTER PUMP & LMO PLANT AS PER PESO/ FDA NORMS
HI-TECH ENGINEERING WORKS
MAK ENTERPRISES
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid