| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAccepted-AOC | L1 | Accepted-AOC allotted being lowest | |
| 2 | L2₹4.7 L+₹33,463.47 (7.64%)Rejected-Finance | L2 | Rejected-Finance rejected |
Tender Value
₹5.0 L
EMD Value
₹9,900
Closing Date
19 Jul 2022, 5:00 pmClosed
Executive Engineer
1st Floor, Nirman Sadan Civil Lines Gurugram
Annual Repair of Various Quarters in LIG and MIG Sector-4 Urban Estate and ITI Staff Quarters Gurugram for the year 2022-23.
2022_HRY_228819_1
PWD/PD1GGN/04.07.2022-14
Open Tender
Civil Works
Item Wise
270 days
Gurugram
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
₹9,900
Yes
27 Sept 2022
5 Jul 2022
20 Jul 2022
5 Jul 2022
19 Jul 2022
5 Jul 2022
Amount
10 mm thick cement plaster 1 :3 (1 cement: 3 fine sand)[New HSR 11.4.2]
12 mm cement plaster of mix. (4). 1 : 6 (1 cement: 6 fine sand) [New HSR 11.5.4]
Cement pointing 1 :2 on lining On side slopes(HSR 14.23.2)
Providing and applying two coats white cement based putty of approved brand and manufacturer, over plastered surface and grinding the surface smooth with sand paper to get en even and smooth finish including cost and carriage of all material , labour charges, scaffolding, sundries etc. complete. [New HSR 11.58]
Distempering with 1st quality acrylic distemper (ready made) having VOC content less than 50 gm per litre. of approved manufacturer and of required shade and colour complete. as per manufacture r's specification. (1). One or more coats on old work. [New HSR 30.34.1]
Distempering with 1st quality acrylic distemper (Ready mix) having VOC content less than 50 grams/ litre of approved brand and manufacture to give an even shade. (1). Old work (one or more coats). [New HSR 30.25.1]
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade. (1). One or more coats on old work [New HSR 30.28.1]
Finishing walls with Acrylic Smooth exterior paint of required shade. (2). Old work (One or more coat applied @ 0.90 litre/10 sqm). [ HSR 30.37.2]
Finishing walls with Acrylic Smooth exterior paint of required shade. (2). Old work (One or more coat applied @ 1.67 litre/10 sqm). [ HSR 30.37.1]
Providing and laying rectified Glazed Ceramic floor tiles of size 300x300 mm sqm 196 651 847 or more (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick Cement Mortar 1 :4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ sqm including pointing the joints with white cement and matching pigments etc., complete (HSR-10.61)
Providing and laying of conglomerate floor 40mm thick cement concrete topping 1 :2:4 (HSR 10.8)
Providing and fixing glass panes with putty and glazing clips in steel doors, windows, clerestory windows, all complete with : (1) 4.0 mm thick glass panes. [New HSR 13.10.1]
Regarding terracing of mud phaska covered with tiles or brick, in cement mortar by dismantling tiles or bricks, removing mudplaster, preparing the surface of mud phaska to proper slope, relaying mud plaster gobri leaping and tiles or bricks, grouted in cement mortar 1 :3 (1 cement : 3 fine sand), including replacing unserviceable tiles or bricks with new ones and disposal ofunserviceable material to the dumping ground (the cost of the new tiles or brick excluded), all complete as per direction of Engineer-in-Charge.(HSR 30.9)
Providing and laying of precast terrazzo tiles 20 to 22 mm thick with gradedmarble chips of sizes up to 12 mm, in skirting and risers of steps notexceeding 30 cm in height, on 12 mm thick cement plaster 1 :3 (1 cement : 3coarse sand), jointed with neat cement slurry mixed with pigment to matchthe shade of the tiles, including rubbing and polishing complete with tiles of: Light shade pigment using white cement(HSR 10.28.1)
Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete.(HSR 30.22) Note 1 :-In case of any difference in the unit & nomenclature of any of the HSR items of civil,PH work depicted in this DNIT and that given in HSR,the unit and nomenclature given in HSR shall be applicable. 2. Only reputed make material will be used (Make/brand exhibited in HSR and exhibited in approved standard documents) as approved by the Engineer-in-charge,while executing various items/work at site. 3. HSR items beyond DNIT shall be paid as per HSR+Ceiling premium. No extra rate shall be payable.
MAHENDER SINGH
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .