Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 LAccepted-AOC | ₹1.4 L | L1 | Accepted-AOC Accepted |
| Sl No | Description | Qty | Unit | JPS TRANSFORMER SERVICE L1 |
|---|---|---|---|---|
| 1.00 | Labour charges for Erection of 16MVA, 110/11 KV class PowerTransformer with turrets all HV/LV bushings, cable termination box,cooler bank A frame, fans,Pumps,oil pipelines,Marshalling box,Cooler control cubical,RTCC panel and all accessories which ever is necessary for commissioning of the Transformer. | 1 | unit | 24,240 ₹24,240 Lowest |
| 2.00 | Labour charges for Earthing of Power Transformer tank , Neutral at 2 points, Marshalling Box, DM box,RTCC Panel etc using 50 x 8 mm MS Flat including cost of supply. (approximately 150KG). | 1 | Unit | 23,972 ₹23,972 Lowest |
| 3.00 | Labour charges for filling of transformer oil into power transformer through filter machine. | 4,200 | Per | 0.81 ₹3,402 Lowest |
| 4.00 | Labour charges for transformer oil filtration in main tank and OLTC ( Hot Oil circulation) & filteration upto satisfactory value is achieved. | 13,400 | litr | 2.02 ₹27,068 Lowest |
| 5.00 | Labour charges for Gland work of control cables including the cost of glands. 19 mm | 4 | No. | 91 ₹364 Lowest |
| 6.00 | Labour charges for Gland work of control cables including the cost of glands. 25mm | 20 | No. | 111 ₹2,220 Lowest |
| 7.00 | Labour charges for Gland work of control cables including the cost of glands. 28mm | 10 | No. | 121 ₹1,210 Lowest |
| 8.00 | Labour charges for Gland work of control cables including the cost of glands. 32 mm | 12 | No. | 141 ₹1,692 Lowest |
| 9.00 | Supply and labour charges for termination of cable core end including the cost of cable socket, lugs, ferruls, strap etc., as per cable schedule in power transformer, Marshalling box, DM box, LV panel, RTCC panel, OLTC and where ever required. | 100 | No. | 22 ₹2,200 Lowest |
| 10.00 | Labour charges for providing skilled workmen during transformer busing CT Testing, Pre commissioning testing and commissioning of the Auto transformer. | 3 | Each unit | 656 ₹1,968 Lowest |
Tender Value
Refer Docs
EMD Value
₹1,400
Closing Date
2 Dec 2025, 2:00 pmClosed
SE/GCC-II/CNI
Superintending Engineer, GCC II, 230 KV CMRL GIS SS, Alandur, Chennai-16
As per NIT
2025_EB_624700_1
OT-61/2025-26 of SE/GCC-II
Open Tender
Electrical Works
Works
120 days
pallavaram
Please refer tender documents
2 documents required · 2 mandatory
₹0
₹1,400
Yes
18 Jun 2026
19 Nov 2025
3 Dec 2025
19 Nov 2025
2 Dec 2025
19 Nov 2025
Amount
Labour charges for Erection of 16MVA, 110/11 KV class PowerTransformer with turrets all HV/LV bushings, cable termination box,cooler bank A frame, fans,Pumps,oil pipelines,Marshalling box,Cooler control cubical,RTCC panel and all accessories which ever is necessary for commissioning of the Transformer.
Labour charges for Earthing of Power Transformer tank , Neutral at 2 points, Marshalling Box, DM box,RTCC Panel etc using 50 x 8 mm MS Flat including cost of supply. (approximately 150KG).
Labour charges for filling of transformer oil into power transformer through filter machine.
Labour charges for transformer oil filtration in main tank and OLTC ( Hot Oil circulation) & filteration upto satisfactory value is achieved.
Labour charges for Gland work of control cables including the cost of glands. 19 mm
Labour charges for Gland work of control cables including the cost of glands. 25mm
Labour charges for Gland work of control cables including the cost of glands. 28mm
Labour charges for Gland work of control cables including the cost of glands. 32 mm
Supply and labour charges for termination of cable core end including the cost of cable socket, lugs, ferruls, strap etc., as per cable schedule in power transformer, Marshalling box, DM box, LV panel, RTCC panel, OLTC and where ever required.
Labour charges for providing skilled workmen during transformer busing CT Testing, Pre commissioning testing and commissioning of the Auto transformer.
Labour charges for making panel cutout and mounting of Differential relay or any other auxiliary relays annunciator, facial type etc in RTCC panel or other panels using panel cutter.
Labour charges for internal wiring of Auto/power transformer including replacement of existing old cables, or laying new cables for connecting Marshalling box,WTI,OTI,MOG, oil and winding temperature.
Labour and material charges for civil works (A Frame and cooler fan and radiator frame structure foundation and cooler pipe line support foundation )
Erection of LV side structure for providing 11KV cable
Hire charges for transportation of 75mm bus bar and empty Oil drum (upto 100KMs) ( from Pallavaram 110KV SS).
GST for bidders outside TamilNadu (IGST)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Document
1.05 MB
BOQ
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].