| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.1 LAccepted-Finance | ₹6.1 L | L1 | Accepted-Finance Lottery allot |
| 2 | L2₹6.1 LSame as L1Rejected-Finance | ₹6.1 LSame as L1 | L2 | Rejected-Finance Lottery not allot |
Tender Value
₹7.2 L
EMD Value
₹72,324
Closing Date
19 Jun 2026, 3:00 pmClosed
Chief Engineer
Motijheel Nagar Nigam Kanpur.
Construction of rcc nala work from barra south sachan chauraha near house no.z1-69 Under Ward-51 Zone-5
2026_NNKAN_1160510_1
31/AA-5/26-27
Open Tender
Civil Works
Fixed-rate
45 days
Ward-51
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹72,324
28 Jul 2026
15 Jun 2026
19 Jun 2026
15 Jun 2026
19 Jun 2026
15 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in trenches or foundation pipes cable etc in ordinary soil including lift upto 1.5m lead upto 50m and dressing of sides and ramming of bottom and disposal of surplus excavated earth as per directed by Engg. i/c within a lead of 50m. | - | CUM | 215 | - |
| 2 | Providing and laying in cement concrete 1:6:12 (1cement : 6 fine sand : 12 graded brick aggregate 40mm nominal size) and curing complete, including cost of formwork in foundation and floors. | - | CUM | 4,380 | - |
| 3 | Retening woall return wall any thickness etc. comp work | - | Sqm | 390 | - |
| 4 | RCC work sith cement aproved coarse sand and 2 cm (3/4) gauge approved stone ballast in the proportion 1:1.5:3 (1cement :6 aggregate) in columns etc. all comp work | - | Cum | 7,590 | - |
| 5 | Mild steel or iron in plain work such as reinforced concrete of reinforced brick work 12mm to 32 mm for the etc. all comp work | - | Qtl | 7,200 | - |
| 6 | Making of pedstal in sign board etc. all comp work | - | Nos | 3,840 | - |
| 7 | Cartage of earth up to 5.00km etc. all comp work | - | Cum | 116.96 | - |
| 8 | Earth work in cutting or in embankment in ordinary soil excavation to be done form of regular pits not excding 1/2M. in depth and work embankment to be in 20cm layers including ramming and dressing the surface to required levels and slopes and also including 1.5m lift and 30m lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks within 30m. distance as directed by Engg. | - | Cum | 170 | - |
| 9 | Construction of granular sub base (GSB) by providing coarse graded mater as per clause 401. | - | Cum | 3,671 | - |
| 10 | Providing & laying of Rubber moulded Interlocking 80mm etc. all comp work | - | Sqm | 925 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.65 MB
BOQ_2175023.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .