| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.8 CrAccepted-AOC | ₹7.8 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹7.8 CrSame as L1Rejected-Finance | ₹7.8 CrSame as L1 | L2 | Rejected-Finance L2 |
| 3 | L2₹7.8 CrSame as L1Rejected-Finance | ₹7.8 CrSame as L1 | L2 | Rejected-Finance L2 |
| 4 | L2₹7.8 CrSame as L1Rejected-Finance | ₹7.8 CrSame as L1 | L2 | Rejected-Finance L2 |
| 5 | Rejected-Technical | - | - | Rejected-Technical all requried not complete |
Tender Value
₹9.2 Cr
EMD Value
₹27.7 L
Closing Date
28 Feb 2026, 3:00 pmClosed
CE
Ghaziabad Nagar Nigam
Construction of road by DANCE from NH-09 to Menrath Tiraha via Ganga Jal Project under Vijaynagar Zone.
2026_DOLBU_1113580_17
107/Nirman/2025-26 Date 16.01.2026
Open Tender
Civil Works
Percentage
Ghaziabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹54,456
₹27.7 L
21 May 2026
9 Feb 2026
28 Feb 2026
9 Feb 2026
28 Feb 2026
9 Feb 2026
Dismantling of flexible pavement (bituminous courses) by mechanical means and disposal of dismantled material up to a lead of 1 kilometre, as per direction of Engineer-in-charge. DSR 2023 15.59
Providing applying tack coat with bitumen VG 10 Grade using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared graunlar surface treated with primer and cleaned with hydraulic broom as per technical specifications causes 503 RMR
Providing and laying dence grade bituminous macdam with HMP.producing and average output of 75 tonnes per hour using crushed aggregate from approved quarry of specified grading premixed with bituminous binder(VG-30)@4.5 per cent by weight of total mix and filler,transporting the hot mix to work site,laying with a hydrestatic paver finisher to the required grade,level alignment,rolling with smooth wheeled vibratory and tandern rollers to achieve the desired compaction. RMR
Providing applying tack coat with bitumen VG 10 Grade using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared graunlar surface treated with primer and cleaned with hydraulic broom as per technical specifications causes 503 RMR
Recycling pavement by cold milling of existing bituminous layers, Using by Bituminous Concrete (Grading-II) using bitumen VG-30 content is 5.4% bitumen weight of mix. For reclaimed material, fresh bitumen will be required to the extent of 60% of normal requirement., planning the surface after cold milling, reclaiming excavated material to the extent of 30% of the required quantity, hauling and stock piling the reclaimed material near the central recycling plant after carrying out necessary checks and evaluation, adding fresh material including rejuvenators as required, mixing in a hot mix plant, transporting and laying at site and compacting to the required grade, level and thickness, all as MoRT&H specified in clause 519.
Providing and laying bitumen mastic wearing course (as per specifications) with industrial bitumen of grade 85/25 conforming to IS : 702, prepared by using mastic cooker and laid to required level and slope, including providing antiskid surface with bitumen precoated fine grained hard stone chipping of approved size at the rate of 0.005 cum per 10 sqm and at approximate spacing of 10 cm centre to centre in both directions, pressed into surface protruding 1 mm to 4 mm over mastic surface, including cleaning the surface, removal of debris etc. all complete. (Considering bitumen using 10.2% as per MORTH specification). DSR 16.37.2
P/L of hot applied thermoplastic compund 2.5 mm thick including reflectorising glass leads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied Glass beads as per IRC:35-2015 The finished surface to be level,uniform and free streaks and holes.S.I N0- 22.2 SOR 2022
Reflective Raised Pavement Markers ( Cat Eye / Road Stud) Supply and fixing of raised pavement marker with Made of Plastic body of RPM Road Stud shall be moulded from ASA ( Acrylic Styrene Acrylonitrite or HIPS ( High - Imoact Polystyrene ) or Acrylonitrite Butadien Styrene ( ABS ) Suggestivor Any other suitable material approved by the Engineer . The Marker shall 8 support a load of 13,635 kg tested in accordance with ASTM D4280 . The Reflective panels shall consist of number of lenses contatning single or dual prismatic cubes capable of providing total internal reflection of the light entring the lens face . Lenses shall be mouled of methyl methecrylate conforming to ASTM D788 of equivalent . The slop or retro - reflecting surface shall preferably be 35 +/- 5 degree to base and the area of each retro -reflecting surface shall not be less than 13.00 sq.cm. the marker height shall not be less than 10 mm and shall not exceed 20 mm & amp ; Width shall not exceed 130 mm . The base of the marker shall be flat within 1.3 mm all road studs shall be legibly marked with the name , trade or other means of identification of the manufacture , epoxy installations , excess adhesive around the edge of the marker , excess adhesive on the pavement and adhesive on the exposed surfaces of the markers shall be moved . The contractor shall submit a two year warranty for field performance including stipulated retro - reflectance of the ang panel to the Engineer . In addition , a two year warranty for satisfactory infield performance of the finished road marker shall also be given by the contractor who carries out the work of fixing of reflective road markers . In case the markers are displaced , damaged , get worn out or lose their reflectivity compared to stipulated standards , the contractor would be required to replace all such markers within 15 days of the intimation from the Engineer , at his own cost . The rate shall include all materials , labour , T & amp ; P , transportation , installation and incidentals all complete as per direction of the Engineer - in - Charge S.I N0- 22.5 SOR 2022
Solar Power road marker (Solar Studs) The solar studs shall be made of Aluminium alloy and poly (8.35) _ carbonate material which shall be absolutely weather resistant and Suggestiv strong enough to support a load of 13,635 kg tested in accordance e with ASTM D4280. Its colour may be white , red , yellow, green or blue or combination as directed by the Engineer Its water resistance shall meet the requirements of IP 65 in accordance with IS:12063:1987 category 2 for protection against water ingress.The dimensions of solar studs shall not be less than 100 mm X 100 mm X 10 mm . It shall have super bright LEDs so as to provide long visibility from a distance of more than 800 m. Its flashing rate shall not be less than 1 Hz . Its should be able to give the prescribed performance in the temperrature range of - 400C to +550C. Its life shall be not less than 3 Years. The rate shall include all materials, labour, equipments, fabrication, transportation, erection, installation and incidentals all complete as per direction of the Engineer-inCharge SOR 2022
RCC work with cement, approved coarse sand and 2 cm gauge stone grit in proportions of 1:1.5:3 in slab wall etc excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 BWG G.I.binding wire and including necessary centering and shuttering etc and supply of all materials, labour and tool & plants etc. required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra.S.I.No. 283A
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Mild steel and Medium Tensile steel bars DSR 2023 ITEM N. 5.22.1
S/L of 22.4 to 53 mm gauge stone ballast with stacking for measurement etc all complete as per direction of engineer in charge ( As per PWD SOR 2020 RMR)
Construction of un-reinforced dowl jointed at expansion and construction join only plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M 40(Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 jmm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and construction joints, applying debonding strips, primer, sealant, approaches near to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using Curing compound (where specified) and water finishing to lines and grade as per drawing and finished with Power Trowel Cum Floter-Trimix Flooring Machine.Technical Specification Clause1501
Scraping old white or colour wash including disposal of refuse as directed by the Engineer-in-charge within a distance of 60 metre (200 feet).
Painting or varnishing work in small areas or new surface painted old work with two coat (upto one square metre of ready mixed priming paint and one coat of approved superior quality ready mixed paint or varnish including supply of materials, labour, Tools & plants etc. required for proper completion of the work. SOR 2022 S.I no 641+642
S/F Of Sign Borad
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_2062334.xls
BOQ • 0.34 MB
T1-T2-T3.pdf
Additional Documents • 2.77 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .