Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAccepted-Finance | ₹2.1 Cr | L1 | Accepted-Finance LOW RATE |
| 2 | L2₹2.1 CrRejected-Finance NIGAHI BEG SATTIMASZID GHAZIPUR | GHAZIPUR | UTTAR PRADESH | 232325 | ₹2.1 Cr | L2 | Rejected-Finance HIGH RATE |
Tender Value
₹2.9 Cr
EMD Value
₹16.5 L
Closing Date
25 Mar 2026, 12:00 pmClosed
Superintending Engineer
SE BALLIA CIRCLE PWD BALLIA
Construction work for 16 units of Officers/Transit Hostels (G 3) in District Mau.
2026_CEUAZ_1127819_1
1195/nivida(CD-Mau)/Ballia Circle/2025 Dated 09.03.2026
Open Tender
Civil Works - Buildings
365 days
MAU
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,590
₹16.5 L
SE BALLIA CIRCLE PWD BALLIA
16 Apr 2026
19 Mar 2026
25 Mar 2026
19 Mar 2026
25 Mar 2026
19 Mar 2026
20 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m for all lift, as directed by E-I-C. All kind of soil. (2023 DSR 2.6.1) (Rates are including all taxes, Royalty, Labour cess etc but excluding GST.) | |||||
| 2Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift. (2023 DSR 2.25 a) (Rates are including all taxes, Royalty, Labour cess etc but excluding GST.) | |||||
| 3Supplying and filing in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. (2023 DSR 2.27) (Rates are including all taxes, Royalty, Labour cess etc but excluding GST.) | |||||
| 41:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) (2023 DSR 4.1.8) (Rates are including all taxes, Royalty, Labour cess etc but excluding GST.) | |||||
| 5Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete. (2023 DSR 5.33.1.1) Concrete of M25 grade with minimum cement content of 330 kg /cum All works up to plinth level (Raft foundation and footing etc.) (Rates are including all taxes, Royalty, Labour cess etc but excluding GST.) | |||||
| 6Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete. (2023 DSR 5.33.2.1) Concrete of M25 grade with minimum cement content of 330 kg /cum All works above floor level up to floor V level (Column, Slab beam , Beams , lintel and slab) (Rates are including all taxes, Royalty, Labour cess etc but excluding GST.) | |||||
| 7Centering and shuttering including strutting, propping etc. and removal of form for ( 2023 DSR 5.9.3) Suspended floors, roofs, landings, balconies and access platform (Rates are including all taxes, Royalty, Labour cess etc but excluding GST.) | |||||
| 8Centering and shuttering including strutting, propping etc. and removal of form for ( 2023 DSR 5.9.5) Lintels, beams, plinth beams, girders, bressumers and cantilevers (Rates are including all taxes, Royalty, Labour cess etc but excluding GST.) | |||||
| 9Centering and shuttering including strutting, propping etc. and removal of form for ( 2023 DSR 5.9.6). Columns, Pillars, Piers, Abutments, Posts and Struts (Rates are including all taxes, Royalty, Labour cess etc but excluding GST.) | |||||
| 10Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: (2023 DSR 6.1.2) Cement mortar 1:6 (1 cement : 6 coarse sand) (In foundation , plinth, G.F. , F.F., S.F. , T.F. and Mumty) (Rates are including all taxes, Royalty, Labour cess etc but excluding GST.) | |||||
stage.html
html • 0.04 MB
technical_2103500.pdf
techsummary_2103500.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.74 MB
T2.pdf
Tender Documents • 1.27 MB
BOQ_2103500.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid