Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
2 Jun 2020, 3:00 pmClosed
Superintending Engineer PDD
Superintending Engineer Distribution Circle PDD Ladakh
Annual Job Contract for maintenance of 66 KV 22 Kv Substations and lines loading unloading at store of STD Leh
2020_PDNRE_16_1
e NIT No 03 of 2020
Open Tender
Electrical Works
Item Rate
365 days
STD Leh
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Executive Engineer STD Leh
₹50,000
8 Jun 2020
27 May 2020
5 Jun 2020
27 May 2020
2 Jun 2020
27 May 2020
Amount
Jumpers
Fixing of Jumper for 66KV
Fixing of every subsequent Jumper on the same Tower
Replacement of burnt/damaged jumpers and tightening of remaining jumpers on the same tower
Disc/Pin Insulators
Replacement of damaged 66 KV disc insulators Tension String
Replacement of damaged 66 KV disc insulators Suspension String
Replacement of damaged Disc Insulator with hardware fitting in each Tension string
Replacement of damaged Disc Insulator with hardware fitting in each Suspension String
Replacement of 33 KV Pin Insulators/22KV
Power Conductor
Restoration of snapped power conductor.Complete job including mid-span compression joint, laying of conductor, rough sagging, tensioning of conductor, dead-end assembly etc upto span of 500 metre tension to tension point.
Repairing of power conductor when lowering of conductor is necessary
Complete job including laying of conductor, making of compression joint, if any, rough sagging, tensioning of conductor, fixing dead-end assembly atc upto span of 500 metre tension to tension point
Making of Compression Joints
Repairing of damaged conductor by using helical sleeve or bolted sleeve or by shorting method, without lowering the conductor
I) When Defective portion of conductor is to replaced II) Repair sleave/sleaves are to be fixed in a span( long span, spans on towers with consideable level difference) at a point which is not safely accessible even to a highly skilled worker III) Fitting of Repair sleeve Compression type on ACSR Zebra/Panther conductor
Laying, stringing,tensioning and binding of conductor including pre-tensioning for removal of kinks, fixing of hardware fittings and jointing ( Where required for ACSR conductor of sizes) a) Above 50 sqmm but not exceeding 100 sqm ACSR (Single conductor length)
Laying, stringing,tensioning and binding of conductor including pre-tensioning for removal of kinks, fixing of hardware fittings and jointing ( Where required for ACSR conductor of sizes) a) Above 150 sqmm but not exceeding 200 sqm ACSR (Single conductor length)
Stringing and sagging of ACSR Panther conductor in semi-hilly/ water logged areas including rough sagging/tensioning fitting of dead end compression assembly, insulator strings, performed armour rods etc and final tensioning.
Dismantling & re-stringing of Dog conductor of 22 KV line ( Single conductor length)
Urgent/Breakdown maintenance of 66KV Transmission Line including Foundation Back Filling /Soil Removal
Patrolling of 66 KV Sub-transmission line
Patrolling of 22 KV Sub-transmission line
Survey, Route alignment mapping including spotting of Pole locations for 11/33 KV lines
Tower Super Structure
Tightening of Nuts and Bolts of tower superstructure a) Tower weight upto 2 tonnes
Tightening of Nuts and Bolts of tower superstructure b) Tower weight more than 2 tonnes upto 4 Tonnes
Tightening of Nuts and Bolts of tower superstructure c) Tower weight more than 4 tonnes upto 7.5 Tonnes
Tightening of Nuts and Bolts of tower superstructure d) Tower weight more than 7.5 Tonnes ( But excluding special category Towers)
Replacement of missing tower members/damaged tower member/Tightening of Nuts and bolts
Checking/Tightening of Tower Footing Earth bolts and measuring tower footing resistance
Fixing of phase plates, number plates and danger plate on Single circuit Tower
Fixing of phase plates, number plates and danger plate on Double circuit Tower
Fixing of Bird Guards and vibration dampers for Single circuit Tower
Fixing of Bird Guards and vibration dampers for Double circuit Tower
Fixing of Anti-climbing device
Temporary measures for land sliding/sinking of foundation
Repair/Providing of revetment wall
Repair & maintenance of 66 KV Tower Foundation
Branch cutting & Route Clearance
In a corridor width of 8 metre for 33 KV & 66 kv lines
Erection of poles complete with pit excavation in soft soil with 30-60% boulders, refilling the pit with soil and boulders, ramming including fixing of 1 No Cross-Arm, Top pin clamp, Insulators and braces.
Erection of 8 metre ST Pole
Erection of 9 metre ST Pole
Erection of 11 metre ST Pole
Erection of 13 metre ST Pole
Dismantling of Stay-sets
Tightening of loose Guys
Earth Wire
Restoration of snapped earthwire.Complete job including mid-span compression joint, laying of conductor, rough sagging, tensioning of earthwire, dead-end assembly etc upto span of 500 metre tension to tension point.
Repairing of earth wire with lowering of earthwire in necessary complete job including compression joint of required. Laying of earthwire, tensioning, fixing dead-end assembly atc upto span of 500 metre tension to tension
Providing of Earthing of Tower ( Spiral/Pipe/Rod type) including earthwork excavation, backfiling, fixing to the pole and cross-arm etc along with measurement of earth resistance
For Earth wire Stringing ( 60% of Stringing rates for ACSR conductor Panther)
In soft/Ordinary soil
I) Spiral Type With a spiral made of 115 turns of 8 SWG wire placed 1.5 m below ground level including excavation of pit, refilling the same with soft soil
II) Rod type where a 20mm thick 2.3 m long G.I rod is driven from 200 mm below the ground level
In Hard soil
a) 40 mm dia GI pipe/30 mm thick GI Rod 2.3 metre long to be placed 200mm below ground level including excavation of pit 2.5m deep refilling the same with soft soil
b) Earthing in soft/hard soil using the pole pit with spiral/pipe plates
Counterpoise type
Pre-Commisioning tests CTs and PTs
General inspection test, Insulation resistance test, Ratio test by primary injection, Polarity test,Dielectric test,wiring check etc( Per Piece)
Lightening Arrestor ( L.A)
Measurement of IR values, leakage current and tightening of droppers for 66 KV LA
Erection including levelling alignment, fixing including O/H and earth connection (per piece)
Potential transformers(PT), Capacitive Voltage Transformer ( CVT) and Coupling Capacitor (C.C)
Checking of Oil level, measurement of I.R value, filling of nitrogen gas, topping of oil etc and tightening of droppers for 66 KV
Erection including levelling, assembling, fixing including O/H and earth connection( per Piece)
Current Transformer
Checking of Oil level, measurement of I.R value, filling of nitrogen gas, topping of oil etc and tightening of jumpers for 66 KV
Erection including levelling, assembling, fixing including O/H and earth connection( per Piece)
Isolators( Manually operated)
Checking of fixed/moving contacts, cleaning/greasing of contacts, cleaning of post insulators and auxilliary switches, contacts,tightening of nut-bolts etc for 66 KV Motorised/penumatically controlled isolators.
Erection, Testing, Commissioning including levelling, assembling, aligning, contact adjustment and making of all connections along with pre-commissioning tests including contact resistance measurement etc.
Breakers
Inspection and testing of SF6/ VCB breakers including inspection of operating mechanism, Inspection of contacts and adjustment of various clearances
Erection including levelling, assembling, fixing, alignment and termination of control wiring and O/H and earth connection
Dismantling charges = 60% of the corresponding Erection charges
Filling of SF6 gas in Breaker
Power Transformer with OLTC
Inspection and testing of transformer including drying/replacement of silicagel, checking of buccholz relay, surge relay,PRV, conservator oil level indicator,temperature sensors,topping of oil,cooling system, measurement of IR value, dielectric strength of oil, cleaning of transformer/etc Upto and including 5MVA
Inspection and testing of transformer including drying/replacement of silicagel, checking of buccholz relay, surge relay,PRV, conservator oil level indicator,temperature sensors,topping of oil,cooling system, measurement of IR value, dielectric strength of oil, cleaning of transformer/etc Above 5MVA upto and including 10MVA
Complete erection of power transformer including assembly viz fixing of bushes radiators, fans( if any) thermometer, wiring of instrument complete job Above 2.5MVA upto and including 6.3MVA
Complete erection of power transformer including assembly viz fixing of bushes radiators, fans( if any) thermometer, wiring of instrument complete job Above 6.3 MVA upto and including 10MVA
Power Transformer (Detail of work) General inspection by throrugh inspection of each individual part, ratio test by applying voltage on HV side and measuring LV cvoltage on various tap positions I) Polarity and vector group checking, Insulation Resistance test II) HV to LV III) HV to earth IV) LV to earth V) calibration of WTI and OTI VI) Indicators and operation of alarm and trip circuits VII) Testing of Buccholz relay ( alarm and trip circuits) VIII) Sequence test of overall protection/operation IX) DC circuits checking X) Checking Breaker operation XI) Commissioning of Power Transformer XII) Running of Transformer on short circuit by applying low voltage approximately equal to impedance volatge on HV side and short circuiting the LV terminals XIII)Energizing the transformers by applying required primary volatge to it and keeping the transformer on no load to observe the behaviour of transformer. Putting on 25% of the load on the transformer for a period of atleast six hours and observation of oil winding temeprature, increase in the load in steps of 25% till the transformer is fully loaded.
a) 2.5 MVA to 5 MVA
b) Above 5 MVA and upto 10 MVA
Dehydration of Transformer Oil
With Labour cost of Rs 6963 per day subject to filteration for maximum of - 10 days for transformer from 1 MVA to 2.5 MVA
With Labour cost of Rs 6963 per day subject to filteration for maximum of - 15 days for transformer from2.5 MVA to 6.3 MVA
With Labour cost of Rs 6963 per day subject to filteration for maximum of - 20 days for transformer from 6.3 MVA to 10 MVA
Filteration of Power Transformer Oil of 1x6.3 MVA transformer
Replacement of damaged bushing rated for voltage upto and including 66 KV, bushing gaskets etc of power transformer including draining of oil, opening of connectors, dismatling of old damaged components and replacement by a new one, providing connections etc filling of filtered oil( Complete job)
Bus-Bars & Gantry Structure
Replacement of bus-bars of single conductor with size upto 0.4 sq.inch copper equivalent including replacemement of disc insulators if required, tightening of clamps/jumpers/ droppers etc
Replacement of damaged/burnt droppers or jumpers (emergency work)
Replacement of damaged disc insulators
Tightening of all Nut bolts and providing missing bolts and damaged members of 66 KV Bay
Post insulators
Replacement of damaged Post Insulators or providing additional Post Insulators33KV or 66KV Stack/22KV
Installation of post insulator
Earthing
Measuring of earth resistivity,checking of electrical continuity of equipment earthing,tightening of earthing connectors,removal of rust from bolted earth connections and re-tightening of 66 KV composite Switch yard
Erection/Installation of Chemical earthing / conventional
Metering
Installation of meter board/meter box including MCB/ Main switch
Installation of meter 3 phase without CTs
Installation of meter 3 phase with CTs
Sealing of Meters( Body /TCP seal) using lead seals and tusked wire as well as paper seals
11 KV equipments
Installation of 11 KV Lightening Arrestor set ( 3 pieces) including connection to Overhead line and earth
Installation of 11 KV G.O Set with fuse unit/drop ou Fuse set including fixing of cross-arms for mounting the set
Replacement/Repair of 11 KV GO Sets
Installation of Link-set with fuse-set
Fixing of Pre-fabricated brackets and cross-arm bed for placement of transformer( upto 250 KVA)
Mounting of transformer on bed including HV and earth connection Upto and including 25 KVA
Mounting of transformer on bed including HV and earth connection Above 25KVA Upto and including 100 KVA
Replacement of 11 KV Pin insulator
Replacement of 11 KV Damaged Disc insulator in normal areas
Replacement of 11 KV Damaged Disc insulator in Hilly/tough areas
Maintenance/Testing/Replacement of 11 KV Switchgear as per SOW 1) Dismantling,cleaning,greasing and assembling of hand pull out system,racking mechanism of chassis and positioning indicators.Alignment of breaker in panel for smooth racking-in/racking out operation shall be done and adjustments shall be done if required. 2) Cleaning of 11 KV Panels by way of vaccum cleaner/air blower. 3) Cleaning and tightness checkings of CTs,PTs and control wiring connections in terminal blocks. 4) Cleaning of contacts,checking of vaccum interrupter, tripping coils, closing coils and replacement if required 5) Checking of Mechanical tripping mechanism and adjustment if required.
Replacement of faulty relay, CTs, PTs, burn out fuses, MCBs and other defective components of 11 KV Board after carrying out control circuit checking.
HT/LT Power/Control cable
U/G laying of cables 3/3.5 core in excavated trench including covering the same with 50 mm thick layer of sand on all sides ( Each of 50 mm thick depth) and provisioning of one layer of bricks on the upper layer and refilling with excavated earth a)25 mm2 upto and including 95 mm2 cable
b) Above 95 mm2 upto and including 300 mm2 cable
c) Above 300 mm2 upto and including 630 mm2 cable
Laying/Fixing of Control cable upto 2.5 sqmm and any no of cores on surface/in the existing masonry duct if required.
Laying of control cables ( all types) on trays and racks in cable ducts including binding with PVC belts/binding wires, peeling of insulation and fixing of proper size thimbles, connecting the cable after identification of each core to both ends i.e to Panel, CT,PT operation of 66 KV Outdoor breakers, alarm and annunciation Complete job for one transformer Bank upto 10 MVA capacity
Removal of false flooring/Tray Cover/Conduits etc
Laying of 6.6/11/33 KV cables in duct, mounting on the supports including all the electrical accessories 70sqmm to 300sqmm
Laying of 6.6/11/33 KV cables in duct, mounting on the supports including all the electrical accessories Above 300sqmmupto and including 630sqmm cable
Cable end termination using Epoxy including peeling of cable and fixing of proper size thimbles ( Set of 3/3 1/2 core)
LT cables a) 25sqmm to 95sqmm
b) Above 95 mm2 upto and including 300 mm2 cable
c) Above 300 mm2 upto and including 630 mm2 cable
HT cables( 6.6/11/33 KV) 70sqmm to 300sqmm
Above 300 mm2 upto and including 630 mm2 cable
Crimping of thimbles to the cable ends for replacement/repair works
a) 25 mm2 up to including 70 mm2
b) Above 70 mm2 upto including 185 mm2
c) Above 185 mm2
Fixing of Power Cable kits Indoor and Outdoor type upto 300 sqmm
Installation of MCCB with incoming and outgoing connection for replacement works including dismantling
Checking of Switch Yard lightening and replacement of any defective parts complete job
Repair/Replacement of Damaged Trench cover
Repair and maintenance of ACDB/DCDB
Installation of battery bank including wiring to panels and Battery Charger 30 V D.C
Routine Maintenance of 24 V Battery Bank & Battery Chargers
Cleaning of switchyard and control room
Panels
General inspection test, wiring test, Insulation resistance test ( On AC-DC circuits and between wires and earth) operation ,Indicator test
66/33/11/6.6 KV/22 KV Panels
Transformer Panel including Breaker
Placement of 66/11/6.6/22 KV Panel on cable duct including levelling, alignment and fixing,complete job per panel (Incoming/Outgoing)
Installation of Control and Relay panels including mounting and connecting different equipments viz Ammeter,Voltmeter, PP Meter, KVAR, relays, Indication lamps, Alarm fuses etc complete job for incoming/Oiutgoing panels/transformer panels/OLTC panels
Relays
Complete testing of relays including physical inspection of relays, setting of testing kit, interconnection between various parts and injection points on panels. Secondary injection on various current taps and recording the observation thereof. All modifications necessary to achieve desired results to be in compliance with recommended/calculated settings per one sub-station
Loading,Unloading & Carriage of Sundry Material
Loading ChargesSorting in Stores,collection, carriage up to 25 m and loading of sundry material e.g Steel,CGI sheets,nuts, bolts, hardware, fittings, cross-arm etc
Unloading of Sundry material and carriage to the Sub-station up to a distance of 25 mtrs
M/S ZARDEEP ENTERPRISES
himalayan renewable energy and construction firm
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .