Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹42.4 LAdmitted-Finance | -44.80% | ₹42.4 L | L1 | Admitted-Finance |
| 2 | L2₹45.6 L+₹3.2 L (7.48%)Admitted-Finance | -40.67% | ₹45.6 L+₹3.2 L (7.48%) | L2 | Admitted-Finance |
| 3 | L3₹48.7 L+₹6.3 L (14.8%)Admitted-Finance | -36.65% | ₹48.7 L+₹6.3 L (14.8%) | L3 | Admitted-Finance |
| 4 | L4₹49.1 L+₹6.7 L (15.7%)Admitted-Finance | -36.11% | ₹49.1 L+₹6.7 L (15.7%) | L4 | Admitted-Finance |
| 5 | L5₹49.6 L+₹7.2 L (16.9%)Admitted-Finance | -35.47% | ₹49.6 L+₹7.2 L (16.9%) | L5 | Admitted-Finance |
Tender Value
₹76.8 L
EMD Value
₹1.5 L
Closing Date
27 Feb 2026, 4:00 pmClosed
Executive Engineer PWD RnB Division Banihal
Executive Engineer PWD RnB Division Banihal
Refer to BOQ
2026_PWDJK_304162_1
101 of 2025-26
Open Tender
Civil Works
Percentage
Executive Engineer PWD RnB Division Banihal
Refer to NIT
3 documents required · 3 mandatory
₹1,600
Executive Engineer PWD RnB Division Banihal
₹1.5 L
Executive Engineer PWD RnB Division Banihal
10 Mar 2026
21 Feb 2026
28 Feb 2026
21 Feb 2026
27 Feb 2026
21 Feb 2026
24 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of Soil | 29.79 | cum | 479.3 | ₹14,278.35 |
| 0.0 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 750 | cum | 187.3 | ₹1,40,475 |
| 0.0 | Disposal of Excavated earth avg lead of 01 Km by MT | 637.5 | cum | 160.93 | ₹1,02,592.88 |
| 0.0 | Supplying and stacking at site Good Earth including royalty (earth measured in stacks will be reduced by 20% for payment) | 281.25 | cum | 281.3 | ₹79,115.63 |
| 0.0 | Spreading of sludge, dump manure or/and good earth in required thickness as per directions of officer in-charge (cost of sludge, dump manure or/and good earth to be paid separately) | 281.25 | cum | 53.55 | ₹15,060.94 |
| 0.0 | Grassing with selection no. 1 grass including watering & maintenance of the lawn for 30 days or more till the grass forms a thick lawn free from weeds & fit for mowing including supplying of good earth if needed (the good earth shall be paid separately.) with grass turf | 6.25 | sqm | 1,354.4 | ₹8,465 |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 75.23 | cum | 5,733.6 | ₹4,31,338.73 |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 7.37 | cum | 5,202.9 | ₹38,345.37 |
| 0.0 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 24.21 | cum | 7,788.4 | ₹1,88,557.16 |
| 0.0 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 10.88 | cum | 9,395.7 | ₹1,02,225.22 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
BOQ_988044.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .