| 1 | L1₹2.1 CrAccepted-AOC VPO KHANPUR TEHSIL DISTT UNA HP 174301 | UNA | UNA | HP | 174301 | ₹2.1 Cr Quoted ₹2.0 Cr | L1 | Accepted-AOC LOA |
| 2 | L2₹2.2 Cr+₹16.7 L (8.42%)Rejected-Finance | ₹2.2 Cr+₹16.7 L (8.42%) | L2 | Rejected-Finance L2 |
| 3 | L3₹2.2 Cr+₹19.5 L (9.80%)Rejected-Finance | ₹2.2 Cr+₹19.5 L (9.80%) | L3 | Rejected-Finance L3 |
| 4 | L-4₹2.4 Cr+₹40.5 L (20.3%)Rejected-Finance VILLAGE PO THANAKALAN TEHSIL BANGANA DISTT UNA HP 174321 | THANAKALAN | UNA | HP | 174321 | ₹2.4 Cr+₹40.5 L (20.3%) | L-4 | Rejected-Finance L4 |
| 5 | L-5₹2.4 Cr+₹41.2 L (20.7%)Rejected-Finance | ₹2.4 Cr+₹41.2 L (20.7%) | L-5 | Rejected-Finance L5 |
Tender Value
₹2.4 Cr
EMD Value
₹4.8 L
Closing Date
20 Mar 2026, 10:00 amClosed
Chief Engineer HZ HPPWD Hamirpur
Chief Engineer HZ HPPWD Hamirpur
C/O link road to village Nanawain Abadi Mohmdan from Km. 0.000 to 2.000 under PMGSY-IV (Package No. HP-12- 207 ).
2026_CEHP_146784_1
PW/CE (HZ)/CTR/PMGSY-IV (Batch-I) NIT 2025-26-12441-65 dated 09.02.2026 HP12207
Open Tender
Civil Works - Roads
Percentage
365 days
Bangana
as per SBD
14 documents required · 14 mandatory
₹7,000
Executive Engineer
₹4.8 L
10 Apr 2026
25 Feb 2026
20 Mar 2026
25 Feb 2026
20 Mar 2026
25 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in hilly area in all heights and depths and in all kind of soil by ordinary rock, hard rock, chieselling, wedging out of rock(where blasting is prohibited) and their intermediate classification of soil, setting out true to the required lines, grades, width cutting and trimming of side slopes and level as shown in the drawing and as directed by Engineer-in-charge at site according to the MORD technical specification clause 2014 302, 1603.1 and 1603.2 and sorting out useful materials and stacking the same in all leads and lifts on acquired width of road and transportation for filling in road ways, camber, embankments for grade improvements and disposal of all surplus material to required width of the road or to approved dumping sites through all modes of transportation including head load or animal transport or mechanical means along with its leveling, fine dressing and carriage of machineries, materials, tool and labour if required. Any loss to the public private property during the course to execution shall be the absolute responsibility of the contractor which shall have to be duly compensated by him in all the cases as per the direction of engineer-in-charge including carriage of material with in all leads and lifts. All useful material such as stone, shingle, sand and slates etecetra shall be sorted out. A recovery of 580.45.cum. stone to be obtained from excavation cutting at the rate of Rs. 300.00 (Rupees Three hundred) per cubic metre shall be effected on prorata bases in each running bill for this item. The rate includes sale tax octori, royality, malkhana, toll tax, labour cess or other taxes imposed by the Government, but exclusive GST which shall be paid separately. | 1 | Per Cubic Metre | 147.1 | ₹146.95 |
| 2 | Construction of embankment with approved materials obtained from borrow pits deposited at site from road way cutting excavation of other road structures or other sources laid in layers of suitable thickness not exceeding 200mm( two hundred millimeter) and compacted with 80-100 (eighty-hundred)KN.static/ vibratory road roller to meet the requirements of table 300.1 and 300.2 specifications to lines, grades, level and cross sections as per drawings or directions of the Engineer-in-charge including preparation of foundation for embankment in all kinds and classification of soils including saturated soil and dewatering/ bailing out of water wherever required including handling of materials for construction of embankment within all leads and lifts. The rate shall include carriage of machineries, equipment, tools and materials and safety measures, as per direction of the Engineer-in-charge including carriage of material within all leads and lifts and other incidentials. The rate includes sale tax octori, royality, malkhana, toll tax, labour cess or other taxes imposed by the Government but exclusive GST which shall be paid separately. | - | Per Cubic Metre | 99.5 | - |
| 3 | Construction of sub grade and earthen shoulder with approved material obtained from borrow pits and laid in layers of suitable thickness not exceeding 200mm ( two hundred millimetres) and compacted with 80-100 KN (Eighty to one hundred KiloNewton). static/ vibratory road roller to meet the requirements of table 300.1 and 300.2 of MORD specifications 2014 clause 303 to lines, grades, level and cross sections as per drawings or directions of the Engineer-in-charge including preparation of foundation for embankment in all kinds and classification of soils including saturated soil and dewatering/ bailing out of water wherever required including handling of materials for construction of embankment within all leads and lifts. The rate shall include carriage of machineries, equipment, tools and materials and safety measures, payment of all taxes and other incidentals necessary to complete the work in all respects as per direction of Engineer-in-charge including entire carriage of materials within all leads lifts and other incidentals and per direction of Engineer-in-Charge. The rate includes sale tax octori, royality, malkhana, toll tax, labour cess or other taxes imposed by the Government but exclusive GST which shall be paid separately. | - | Per Cubic Metre | 190.65 | - |
| 4 | Earth work all kind of soil in excavation for structures such as Retaining walls, breast walls, culverts, drains and parapets etcetera in all type of classification of soil as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto any lead, dressing of sides and bottam and back filling in trenches with excavated suitable material. Ordinary soil upto any depth. and as directed by the Engineer-in- Charge at site according to the M.O.R.D. technical specification 2014 in association with other clauses.The cost of all useful material such as stones , shingles and aggregates received from the excavation shall be recovered from the contractor All the surplus material shall be disposed off by the contractor at approved dumping locations , to be identified by him at his own level and as per EMP guidelines and approval/ instruction of the Engineer without any additional cost. Any loss to the public / private property during the course of execution shall be the absolute responsibility of the contractor which shall have to be duly compensated by him in all cases as per regulations and instructions of Engineer-in-charge including entire carriage of materials within all leads lifts and other incidentals and per direction of Engineer-in-Charge. The rate includes sale tax octori, royality, malkhana, toll tax, labour cess or other taxes imposed by the Government but exclusive GST which shall be paid separately. | 1,048.25 | Per Cubic Metre | 468.7 | ₹4,91,314.77 |
| 5 | Providing and laying mechanically mixed and vibrated concrete for plain/reinforced concrete in open foundation for all type of structure complete of plain cement concrete nominal mix 1:4:8, {(one cement: four sand : eight graded crushed stone aggregate 40 mm (Forty millimetre nominal size)} on ground or under water and curing complete including pumping or bailing out water, dewatering removal of slush as required at site which may arise at the time of laying under water complete for all heights/ depths including the cost of form work as per drawings and M.O.R.D. technical specification 2014 Clause 802, 803, 1202 and 1203 as per the direction of the Engineer-in-charge , including entire carriage of materials within all leads lifts and other incidentals and per direction of Engineer-in-Charge. The rate includes sale tax octori, royality, malkhana, toll tax, labour cess or other taxes imposed by the Government but exclusive GST which shall be paid separately. | 78.6 | Per Cubic Metre | 4,947.9 | ₹3,88,904.94 |
| 6 | Filter Media behind abutment, wing wall and return wall complete as per drawings & MORD technical specification 2014 Clause 1604.7 The rate shall include carriage of machineries, equipment, tools and materials and safety measures, payment of all taxes and other incidentals necessary to complete the work in all respects. including entire carriage of materials within all leads lifts and other incidentals and per direction of Engineer-in-Charge. The rate includes sale tax octori, royality, malkhana, toll tax, labour cess or other taxes imposed by the Government but exclusive GST which shall be paid separately. | 29.7 | Per Cubic Metre | 2,006.7 | ₹59,598.99 |
| 7 | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm (one hundred millimetres) dia PVC pipe extending through the full width of the structures with slope of 1(V):20(H) (one vertical):(twenty Horizontal) towards drawing face complete as per drawing and M.O.R.D. technical specification 2014 clauses 614,709 and 1204.3.7 as per the direction of Engineer-in-charge , including entire carriage of materials within all leads lifts and other incidentals and as per direction of Engineer-in-Charge. TThe rate includes sale tax octori, royality, malkhana, toll tax, labour cess or other taxes imposed by the Government but exclusive GST which shall be paid separately. | 76 | Each | 339.2 | ₹25,779.2 |
| 8 | Providing and laying of boulder apron laid in wire crates with 4mm ( four millimetrre ) dia G.I. wire ( Galvanized iron wire) confirming to IS:280 (IS : two hundred eighty ) and IS : 4826 (IS : four thousand eight hundred twenty Six) in 100mmx100mm ( hundred millimetres into hundred millimetres) mesh ( Woven diagonally ) including 10% ( ten percent ) extra for laps and joints laid with stone boulders weighing not less than 25kg ( twenty five kilogramme) each and stone spalls as per drawing and M.O.R.D.2014 technical specification 2014 Clause 1301 , 1604 and as per directions of Engineer-in-Charge including entire carriage of materials within all leads lifts and other incidentals and per direction of Engineer-in-Charge. | 609.7 | Per Cubic Metre | 2,947.8 | ₹17,97,273.66 |
| 9 | Providing and erecting a "W" metal beam crash barrier comprising of 3 mm (three milimetre) thick corrugated sheet metal beam rail, 70 cm (seventy centimetre) above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm (one hundred fifty into seventy five into five milimetre) spaced 2 m (two metre) centre to centre, 1.8 m high (one point eight metre), 1.1 m (one point one metre) below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 (IS: one thousand three hundred sixty seven) and IS:1364 (IS: one thousand three hundred sixty four), metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm (one hundred fifty into seventy five into five milimetre), 330 mm (three hundred milimetre) long complete as as per MORTH Technical specification Clause 811. The rate shall include carriage of machineries, equipment, tolls and materials and safety measures, payment of all taxes and other incidentals necessary to complete the work in all respects as per direction of Engineer-in-charge including entire carriage of materials within all leads lifts and other incidentals and per direction of Engineer-in-Charge. The rate includes sale tax octori, royality, malkhana, toll tax, labour cess or other taxes imposed by the Government but exclusive GST which shall be paid separately. | 100 | Per cubic Meter | 3,103 | ₹3,10,300 |
| 10 | Loosening of the ground upto a level of 300 mm (three hundred milimeter) below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2. The rate includes sale tax octori, royality, malkhana, toll tax, labour cess or other taxes imposed by the Government but exclusive GST which shall be paid separately. | 2,000 | Per Cubic Metre | 99.18 | ₹1,98,360 |
stage.html
html • 0.05 MB
technical_227265.pdf
techsummary_227265.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.63 MB
SBDHP12207.pdf
Tender Documents • 7.48 MB
BOQ_227265.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .