Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC | ₹1.3 Cr | L1 | Accepted-AOC Being L1 |
| 2 | L2₹1.4 Cr+₹7.9 L (5.91%)Rejected-Finance | ₹1.4 Cr+₹7.9 L (5.91%) | L2 | Rejected-Finance Being L2 |
| 3 | L3₹1.7 Cr+₹33.7 L (25.1%)Rejected-Finance | ₹1.7 Cr+₹33.7 L (25.1%) | L3 | Rejected-Finance Being L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not meeting NIT Criteria |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not meeting NIT Criteria |
Tender Value
₹1.7 Cr
Closing Date
30 Dec 2021, 3:00 pmClosed
Chief Engineer
CED BARC Trombay
Excavation work for Foundation of ERF Project near RAPS,Rawatbhata, at P.O. Anushakti via Kota, Rajasthan
2021_BARC_654491_2
BARC/CED/ET/36/2021-2022 Dated 21.10.2021
Open Tender
Civil Works
Item Rate
244 days
RAPS, Rawatbhata P.O.Anushakti via Kota
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
Exempted
ERF Project site office
13 May 2022
8 Dec 2021
31 Dec 2021
8 Dec 2021
30 Dec 2021
24 Dec 2021
8 Dec 2021 - 15 Dec 2021
17 Dec 2021
Amount
From 0.00 to 1.50 m depth from Average Ground Level
From 0.00 to 1.50 m depth from Average Ground Level
From 0.00 to 1.50 m depth from Average Ground Level
From 1.50 to 3.00 m depth from Average Ground Level
From 3.00 to 4.50 m depth from Average Ground Level
Earth work excavation in foundation in Hard Rock by controlled Blasting (including explosive,drilling, muffling, pre shear line drilling ) and by mechanical means (Hydraulic excavator) / Manual means including dewatering if necessary, dressing the sides of foundation, ramming the bottom of foundation, stacking and / or disposing within a distance of 200 m and filling the sides of foundation with available excavated earth in layers not exceeding 250 mm in depth, each layer well rammed and consolidated etc. complete all as per specifications and as directed by the Engineer-in-Charge. Blasting works to be executed as per safety norms and as per specifications and as directed by the Engineer-in-charge.
From 0.00 to 1.50 m depth from Average Ground Level
From 1.50 to 3.00 m depth from Average Ground Level
From 3.00 to 4.50 m depth from Average Ground Level
From 4.50 to 6.00 m depth from Average Ground Level
From 6.00 to 7.50 m depth from Average Ground Level
From 7.50 to 9.00 m depth from Average Ground Level
From 9.00 to 10.50 m depth from Average Ground Level
From 10.50 to 12.00 m depth from Average Ground Level
Lead charges for 1st 1 KM or part thereof, by mechanical transport including loading, unloading, stacking / levelling etc.
Debris
Lead charges for lead exceeding 1 KM but not exceeding 2 Km, by mechanical transport including loading, unloading, stacking / levelling etc.
Debris Note: The rates in respect of Item Nos 5 to 6 are applicable for NET Quantities arrived at after making deduction for voids (a) @ 20% in respect of Soil and @ 50% in respect of Rock from corresponding STACK / TRUCK Measurement (b) @ 30% % in respect of Debris from corresponding TRUCK Measurement
Technical Supervision, Monitoring blast vibration levels on regular basis for every Control blast at 5 (five) designated locations (fixed) by deploying standalone seismographs with 1 (one) technical person from an expert agency (NIRM- National Institute of Rock Mechanics, Banglore ). The scope of work includes: (i) Monitoring the data at each location. (ii)Forwarding the monitored vibration event report as pdf on daily basis along with air overpressure values. (iii)Ensuring adherence to latest safety norms during the operation of Control blasting. (iv)Providing Site specific technical guidance as required during the excavation by control blasting at critical locations for ERF Project ( within radial distance of 30 m from the nearest corner of existing RAPPCOF building upto the required depth as per drawing) such as excavation near Pool, Sump, Foundation of existing RAPPCOF Facility etc., through an expert agency (NIRM- National Institute of Rock Mechanics, Banglore ). Note: The payment will be made to the contractor after completion of excavation of the area within radial distance of 30 m from the nearest corner of existing RAPPCOF building upto the required depth as per drawing.
Banco Construction Pvt Ltd.
kardam constructions priavte limitd
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .