Tilak Nagar Kundari Rakabganj ward antargat Kapoor Motors se Indrani nagar jhagdeswar mandir nigam bhag shastri nagar tak Pavor road Side Patri par interlocking ka karya
2026_LDAUP_1156419_1
27/E-Tender/CE/2026-27
Open Tender
Civil Works
240 days
LDA Gomti Nagar Lucknow
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,950
Sec LDA
₹2.8 L
2 Jun 2026
2 Jun 2026
13 Jun 2026
2 Jun 2026
12 Jun 2026
2 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m., All kinds of soil. | 287.71 | Cum | 205.62 | ₹59,158.11 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level , 1:4:8 (1 Cement: 4 coarse sand (zone-III) derived from natural sources: 8 graded stone aggregate 40 mm nominal size derived from natural sources). | 21.76 | Cum | 5,381.16 | ₹1,17,094.04 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level, 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 41.75 | Cum | 7,145.72 | ₹2,98,333.81 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for, Centering and shuttering including strutting and propping and removal of items for: Foundations, footings, base of columns, etc DSR 2023/5.9.1 | 355 | Sqm | 309.78 | ₹1,09,971.9 |
| 5 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:, Cement mortar 1:4 (1 cement: 4 coarse sand) | 44.53 | Cum | 5,822.47 | ₹2,59,262.94 |
| 6 | 12 mm cement plaster of mix, 1:4 (1 cement: 4 coarse sand) | 231.6 | Sqm | 282.29 | ₹65,378.36 |
| 7 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per technical specification clause-401 (Sanction Rate) | 275.72 | Cum | 4,185 | ₹11,53,892.39 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level. Mild Steel and Medium Tensile steel bars. Sanction rate. | 3,277.38 | Kg | 71.5 | ₹2,34,332.31 |
| 9 | Providing and laying dense graded bituminous macadam with higher capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. | 15.93 | Sqm | 10,360 | ₹1,65,034.8 |
| 10 | Arrangement of Tractor Trolley. Sanctioned Rate | 30 | Trip | 580 | ₹17,400 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.51 MB
tender.pdf
Tender Documents • 2.16 MB
BOQ_2166859.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid