| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 LAccepted-AOC | L1 | Accepted-AOC Award of contractor |
| Sl No | Description | Qty | Unit | DK ENTERPRISES L1 |
|---|---|---|---|---|
| 1.00Improvement works with allied Civil works | ||||
| 1.01 | Dismantling the IWC and surki around the closet and clearing the site and disposing the debris 1 Km away including the cost of all labour, lead, lift, T&P etc complete. | 2 | Nos | 950 ₹1,900 Lowest |
| 1.02 | Dismantling of existing Damaged Brick in cement mortar walls under 3m high including cost of all materials, hire charges for tools and plants, clearing the debris away, needed safety arrangements, all leads, lifts etc complete. | 0.2 | cum | 335 ₹67 Lowest |
| 1.03 | Dismantling of existing damaged floor & wall tiles without any damage to the existing structure including cost of labour, T & P safety arrangements, cleaning the site,lead,lift etc complete. | 74 | sqm | 375 ₹27,750 Lowest |
| 1.04 | Dismantling of existing PCC without any damage to the existing structure including cost of labour, T & P safety arrangements, cleaning the site,lead,lift etc complete. | 0.7 | Cum | 575 ₹402.5 Lowest |
| 1.05 | Chipping of the roof concrete and roughening the surface the cost including clearing the debris up to a distance of 1KM away from the site, all labourers, Hire charges for tools needed safety arrangements all leads, lifts etc. Complete. | 3 | sqm | 50 ₹150 Lowest |
| 1.06 | Clean removal of cement plaster from existing inner wall sides and removing of cement plaster wastages from premises as directed by the site engineer including cost of all labours, materials, lead, lift, etc., complete. | 19 | sqm | 12 ₹228 Lowest |
| 1.07 | Dismantling Stone Masonry in cement mortar walls under 3m high including cost of all materials, hire charges for tools and plants, clearing the debris away, needed safety arrangements, all leads, lifts etc complete. | 0.1 | cum | 335 ₹33.5 Lowest |
| 1.08 | Providing Plain Cement Concrete 1:3:6 using 40mm HBG metal for foundation and basement including cost of all materials, lead, lift, labour for laying concrete etc., complete. | 3 | Cum | 6,260 ₹18,780 Lowest |
| 1.09 | Providing Brick work in Cement Mortar 1:5 using II-Class Table mounted Chamber burnt Bricks of size 9” x 4 3/8” x 2 3/4” including cost of all materials, leads, lifts, labour etc., complete. | 0.2 | Cum | 6,840 ₹1,368 Lowest |
Tender Value
Refer Docs
EMD Value
₹1,822
Closing Date
23 Mar 2026, 2:00 pmClosed
SE/MEDC/METRO/MADURAI
TNEB Complex, Race Course Road, K.Pudur, Madurai - 7
Works by upgrading the old dilapidated existing IWC (Indian Water Closet), Floor tiles, Dadooing tiles by providing new and other allied Civil works in the existing Gents Toilet, East wing, Second floor at TNPDCL Regional office campus, K.Pudur, Mdu.
2026_EB_671297_1
SE/MEDC/METRO/MDU - 021/2025 - 26
Open Tender
Civil Works
Works
Madurai
as in specification
2 documents required · 2 mandatory
₹0
₹1,822
Yes
3 Oct 2026
6 Mar 2026
24 Mar 2026
6 Mar 2026
23 Mar 2026
6 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Improvement works with allied Civil works | |||||
| 1.01 | Dismantling the IWC and surki around the closet and clearing the site and disposing the debris 1 Km away including the cost of all labour, lead, lift, T&P etc complete. | 2 | Nos | - | - |
| 1.02 | Dismantling of existing Damaged Brick in cement mortar walls under 3m high including cost of all materials, hire charges for tools and plants, clearing the debris away, needed safety arrangements, all leads, lifts etc complete. | 0.2 | cum | - | - |
| 1.03 | Dismantling of existing damaged floor & wall tiles without any damage to the existing structure including cost of labour, T & P safety arrangements, cleaning the site,lead,lift etc complete. | 74 | sqm | - | - |
| 1.04 | Dismantling of existing PCC without any damage to the existing structure including cost of labour, T & P safety arrangements, cleaning the site,lead,lift etc complete. | 0.7 | Cum | - | - |
| 1.05 | Chipping of the roof concrete and roughening the surface the cost including clearing the debris up to a distance of 1KM away from the site, all labourers, Hire charges for tools needed safety arrangements all leads, lifts etc. Complete. | 3 | sqm | - | - |
| 1.06 | Clean removal of cement plaster from existing inner wall sides and removing of cement plaster wastages from premises as directed by the site engineer including cost of all labours, materials, lead, lift, etc., complete. | 19 | sqm | - | - |
| 1.07 | Dismantling Stone Masonry in cement mortar walls under 3m high including cost of all materials, hire charges for tools and plants, clearing the debris away, needed safety arrangements, all leads, lifts etc complete. | 0.1 | cum | - | - |
| 1.08 | Providing Plain Cement Concrete 1:3:6 using 40mm HBG metal for foundation and basement including cost of all materials, lead, lift, labour for laying concrete etc., complete. | 3 | Cum | - | - |
| 1.09 | Providing Brick work in Cement Mortar 1:5 using II-Class Table mounted Chamber burnt Bricks of size 9” x 4 3/8” x 2 3/4” including cost of all materials, leads, lifts, labour etc., complete. | 0.2 | Cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_806756.xls
BOQ • 0.30 MB
Datecorrigendumletter21.pdf
PDF • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .