Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹13,800
Closing Date
22 Sept 2025, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SEEDC2MZN
edc-ii, mzn
BP 2025-26 Verious Type Electricity Work Under EDD Budhana
2025_PVVNL_1074093_1
0 9 R/2025 -26/ED C_2MN
Open Tender
Electrical Works
Lump-sum
BUD
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
SE EDC2 MZN
₹13,800
24 Sept 2025
15 Sept 2025
22 Sept 2025
15 Sept 2025
22 Sept 2025
15 Sept 2025
Amount
Safly Cartage of PCC Pole of 8.5 Mtr. With related centralised Material from central store to JE Store/ Work Site (Including Loading, Unloading in all Respect)
Safe cartage of 250 KVA Transformer With related Instalation centralised Material from central store to JE Store/ Work Site (Including Loading, Unloading in all Respect)
Safly Carage of ABC(3x95+1x70+1x16)/ (3x50+1x35+1x16) Conducter from central store to JE Store/ Work Site (Including Loading, Unloading in all Respect)
Construction of Plinth in all respect According RESPO Norms of size 2x2x1.5 m (All required Decentralized material will be Provided by contractor for Construction of Plinth)
Installation of 250 KVA T/F on Plinth in all respect and energize after complete all work as RESPO Norms.(All required Decentralized material will be Provided by contractor)
According RESPO Norms laying LT AB Cable, mounting on Pole and Tying work Properly.(All required Decentralized material will be Provided by contractor)
Digging and Erection pole to make Dp with grauting, earthing and Complete work as per RESPO Norms Including all of accessories(Decentralized Item As Clamp,Nut bolt etc will be provide by Contractor)
Digging and Erection pole with grauting, earthing and Complete work as per RESPO Norms Including all of accessories (Decentralized Item AsClamp,Nut bolt etc will be provide by Contractor)
Installation of 3 Phase Distribution Box (Decentralized Item will be provide by Contractor)
Chemical Earthing work as per requirment of Site & RESPO Norms Including all of accessories (All required Decentralized material will be Provided by contractor for Earthing)
According RESPO Norms Instalation Stay Set
According RESPO Norms Installation of danger board and barbed wire on pole(All required Decentralized material will be Provided by contractor)
According RESPO Norms Instalation 11 KV Fuse Set with carage from store (All required Decentralized material will be Provided by contractor for Fuse Set)
According RESPO Norms Wire Mesh Fencing of Distributan T/F (All required Decentralized material will be Provided by contractor for Fancing)
According RESPO Norms for Safty of 250KVA T/F Instalation of 01 No. Tell Less Unit with Structure In LT Side of T/F.(All required Decentralized material will be Provided by contractor for Tell Less Unit)
Received Back old and used 100 KVA T/F from Site to Store (Including Loading, Unloading, Cartage and Dismantle in all respect)
According RESPO Norms Earthing of Pole by MS earthing
Material Provided By Contrector
ston Pad
Clamp With nut and Bolt
Suspance Clamp with I Hook
Dead End Clamp with I Hook
LT Piercing Connecter 95 Sq.MM
E bracket for 11 KV
Barbard Wire
Nut Bolt with washer of all size
M/S UJJAWAL ENTERPRISES (BID ID -5551231)
M/s Vikas Contractor Shamli (BID ID -5544091)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .