Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.5 LAccepted-AOC | ₹27.5 L Quoted ₹27.7 L | L1 | Accepted-AOC Lowest Bidder |
| 2 | L2₹28.8 LRejected-Finance 1849 JUGRAJPUR SACHENDI KANPUR KANPUR NAGAR UTTAR PRADESH 208023 UDYAM UP 43 0012110 | KANPUR NAGAR | UTTAR PRADESH | 208023 | ₹28.8 L | L2 | Rejected-Finance Being L2 |
| 3 | L3₹38.4 LRejected-Finance H NO 12 ADRASH SAINIK ENCLAVE HISAR CANTT HARYANA | HISAR | HISAR | HARYANA | 125006 | ₹38.4 L | L3 | Rejected-Finance Being L3 |
| Sl No | Description | Qty | Unit | virendra constructions L3 | Balaji Construction Co. L2 | M/s Rao Constructions, 1173 Urban Estate-II, Hisar L1 |
|---|---|---|---|---|---|---|
| 1.00 | Taking down cement plaster or cement lime plaster on PCC/stone surface/brick surfaces including raking out joints hacking for key scrubbing down with water etc all as directed. | 4,700 | Sqm | 10 ₹47,000 | 5 ₹23,500 | 5 ₹23,500 |
| 2.00 | M & L for rendering 10mm thick in cement mortar 1:6 on faces of brick work or concrete surfaces of walls, finished even and smooth without using extra cement including liquid water proofing compound @200 ML per 50 KG by weight of cement complete all as specified and directed. | 2,200 | Sqm | 100 ₹2,20,000 | 80 ₹1,76,000 | 140 ₹3,08,000 |
| 3.00 | M&L including preparation of newly plastered surface of wall and applying two coats of oil bound distemper using airless spray technology with max working pressure of 3300 PSI and capable of operating single spray gun with a max material hose length or 30 mtr the spray machine should be of reputed manufacturer with pro guard techonology and capability of tracking pressure and paint usage an certified by paint manufacturer and as mentioned in PS and accessories for applying distemper should be able to spray in hard to reach areas and penetration of distemper on the surface over and including one coat of acrylic waterbased interior grade primer @ 0.8 ltr (undiluted)/ 10 sqm diluted with water in 1:1 ratio to be applied with fully automatic airless spray machine of paint application with a flow speed of min 1 ltr per minute having a pressure of 3300 PSI.
Contd/-........................ | 2,200 | Sqm | 30 ₹66,000 | 35 ₹77,000 | 15 ₹33,000 |
| 3.10Allow 6-8 hrs to dry the surface for painting of subbsequent coats over and including water proofing cement based putty @ 1 kg(undiluted) per sqm of average thickness 1mm over the plastered wall after prepare the surface wven and smooth complete and sanding of the putty surfaces with mechanical wall sander (having mechanical vacuum mechanism) having RPM not less than 1500, sanding pad of 240 grit or above to make the surface free from dust etc, by skilled labour as per following steps :- (1) Mix the putty powder by adding water as per manufacturer instructions and mix it with putty mixer with the mixing capacity of min 2.5 kg putty per minute. (2) Apply the first coat the prepared mixer with the help of fully automatic airless spray machine of putty application having flow speed of max 6 ltrs per minutes with a maximum pressure 3300 PSI. (3) Allow 6 to 8 hrs time to dry the putty surfaces. (4) Application of putty and paint to be done by Greko Mark Machine or equivalent. (5) Shade/tint of paint should be of company depot as approved by GE (6) Contractor shall not claim for any price variation in company depot. (7) Manual mixing of colouring admixtured or tint for dark and light shade shall be prohibited. Only machine mixing will be permitted. (8) Cost of scaffolding upto 15mtr height of building shall be included in quoted rate. | ||||||
| 4.00 | M&L rendering 5mm thick in cement mortar 1:3 on concrete surfaces in ceiling, finished even & smooth without using extra cement complete all as specified. | 1,000 | Sqm | 90 ₹90,000 | 65 ₹65,000 | 90 ₹90,000 |
| 5.00 | M&L for preparation of newly plastered/asbestos cement surfaces of ceilings & applying three coats of white wash including 2mm thick wall care putty complete all as specified. | 1,000 | Sqm | 15 ₹15,000 | 5 ₹5,000 | 8 ₹8,000 |
| 6.00 | M&L for rendering 15mm thick in cement mortar 1:4 on faces of brick work or concrete surfaces of walls, finished even and smooth without using extra cement including mixed with and including liquid water proofing compound @200 ML per 50 KG by weight of cement complete all as specified and directed.
Note : Cost of scaffolding upto 15mtr height of building shall be included in quoted rate. | 1,500 | Sqm | 140 ₹2,10,000 | 170 ₹2,55,000 | 90 ₹1,35,000 |
| 7.00 | M&L including preparation of newly plastered surface of wall and applying two coats of external emulsion paint using airless spray technology with max working pressure of 3300 PSI and capable of operating single spray gun with a max material hose length or 30 mtr the spray machine should be of reputed manufacturer with pro guard techonology and capability of tracking pressure and paint usage an certified by paint manufacturer and as mentioned in PS and accessories for applying external emulsion paint should be able to spray in hard to reach areas and penetration of external emulsion paint on the surface over and including one coat of acrylic waterbased exterior grade primer @ 0.8 ltr (undiluted)/ 10 sqm diluted with water in 1:1 ratio to be applied with fully automatic airless spray machine of paint application with a flow speed of min 1 ltr per minute having a pressure of 3300 PSI. Allow 6-8 hrs to dry the surface for painting of subbsequent coats over and including water proofing cement based putty @ 1 kg(undiluted) per sqm of average thickness 1mm over the plastered wall after prepare the surface even and smooth complete and sanding of the putty surfaces with mechanical wall sander
Contd/-.............. | 1,500 | Sqm | 120 ₹1,80,000 | 70 ₹1,05,000 | 40 ₹60,000 |
| 7.10(having mechanical vacuum mechanism) having RPM not less than 1500, sanding pad of 240 grit or above to make the surface free from dust etc, by skilled labour as per following steps :- (1) Mix the putty powder by adding water as per manufacturer instructions and mix it with putty mixer with the mixing capacity of min 2.5 kg putty per minute. (2) Apply the first coat the prepared mixer with the help of fully automatic airless spray machine of putty application having flow speed of max 6 ltrs per minutes with a maximum pressure 3300 PSI. (3) Allow 6 to 8 hrs time to dry the putty surfaces. (4) Application of putty and paint to be done by Greko Mark Machine or equivalent. (5) Shade/tint of paint should be of company depot as approved by GE (6) Contractor shall not claim for any price variation in company depot. (7) Manual mixing of colouring admixtured or tint for dark and light shade shall be prohibited. Only machine mixing will be permitted. (8) Cost of scaffolding upto 15mtr height of building shall be included in quoted rate. | ||||||
| 8.00 | M&L for preparation of old decorated, plastered or pointed surfaces of wall by complete removal of existing treatment of wall and applying two coats of external emulsion paint using airless spray technology with max working pressure of 3300 PSI and capable of operating single spray gun with a max material hose length or 30 mtr the spray machine should be of reputed manufacturer with pro guard techonology and capability of tracking pressure and paint usage an certified by paint manufacturer and as mentioned in PS and accessories for applying external emulsion paint should be able to spray in hard to reach areas and penetration of external emulsion paint on the surface over and including one coat of acrylic waterbased exterior grade primer @ 0.8 ltr (undiluted)/ 10 sqm diluted with water in 1:1 ratio to be applied with fully automatic airless spray machine of paint application with a flow speed of min 1 ltr per minute having a pressure of 3300 PSI.
Contd/-.......... | 9,000 | Sqm | 120 ₹10,80,000 | 70 ₹6,30,000 | 40 ₹3,60,000 |
Tender Value
₹35 L
EMD Value
₹70,000
Closing Date
18 Oct 2025, 6:00 pmClosed
GE HISAR
GE HISAR
PERIODICAL SERVICES TO MD ACCN IN THE AOR AGE B/R-II OF GE HISAR AT HISAR MIL STN
2025_MES_731355_1
GE(H)-46/2025-26
Open Tender
Civil Works
300 days
GE HISAR
AS PER NIT
6 documents required · 6 mandatory
₹500
GE HISAR
₹70,000
Yes
8 Jan 2026
18 Sept 2025
28 Oct 2025
18 Sept 2025
18 Oct 2025
3 Oct 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
TenderDocumentsGE46.pdf
Tender Documents • 2.58 MB
BOQ_818809.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid