Loading…
Loading…
Tender Value
₹9.4 Cr
EMD Value
₹18.7 L
Closing Date
14 Oct 2026, 6:00 pm
Chief Engineer Water Resources Zone, KOTA (Raj.)
Chief Engineer Water Resources Zone, KOTA (Raj.)
Chandrabhaga River Rejuvenation Project Phase-II and Repair and Renovation of Kishansagar Talab Tehsil Jhalrapatan District Jhalawar
2026_WRDAS_600114_1
NIT NO 14 2026-27 CE WR ZONE KOTA
Open Tender
Civil Works
Percentage
730 days
JHALAWAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
AS PER NIT
₹18.7 L
Yes
Chief Engineer Water Resources Zone, KOTA (Raj.)
24 Sept 2026
24 Sept 2026
15 Oct 2026
24 Sept 2026
14 Oct 2026
24 Sept 2026
30 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Julicflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. thick | 39,797.86 | SQM | 2.5 | ₹99,494.65 |
| 2 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect soft/Disintegrated rock. | 9,870.4 | Cum | 134 | ₹13,22,633.6 |
| 3 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect Hard rock not requiring blasting. | 6,048 | /Cum | 201 | ₹12,15,648 |
| 4 | Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto;(d)20 mm | 1,787.91 | /Cum | 4,654 | ₹83,20,933.14 |
| 5 | Providing and Laying in position of Cement concrete Design mix M-20 including leads of all construction materials, plasticizers (if required), curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto;
(For mix design Cement content considered 400 kg/ cum of concrete) | 4,705.96 | /Cum | 5,744 | ₹2,70,31,034.24 |
| 6 | Side shuttering including propping etc. complete (to achieve finish F 2 for :Retaining wall, counterfort, abutment, wing walls up stream or down- stream slope facings of dams and open faces of construction joints etc. | 20,490.93 | SQM | 220 | ₹45,08,004.6 |
| 7 | Supplying of M.S. reinforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using (II) Tor or ribed bars (IS: 1786-1985) | 1,18,584.82 | kg | 78 | ₹92,49,615.96 |
| 8 | Providing, laying and fixing in position RCC spun or hume pipe with collars (isi 458-2003) in required size packed in gasket for hume or spun yarn & neatly finished with rich grout of cement mortar 1:3 perfectly air tight including testing of joints. (1200 mm) with labour rates | 200 | rmt | 8,605 | ₹17,21,000 |
| 9 | Demolishing of reinforced concrete including stacking of usable material and disposal of unuseable material within 50 m lead inclusive of de-watering wherever required. | 200 | Cum | 873 | ₹1,74,600 |
| 10 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect (b) Hard/dense soil | 4.5 | Cum | 79 | ₹355.5 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.52 MB
BOQ_1063698.xls
BOQ • 0.36 MB
FINALDOCCHANDI.pdf
Tender Documents • 6.00 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .