| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹32.0 LAccepted-AOC | ₹32.0 L | 1 | Accepted-AOC Accepted |
| 2 | 2₹32.4 LRejected-Finance | ₹32.4 L | 2 | Rejected-Finance High Bid Quantity Amount |
| Sl No | Description | Qty | Unit | S.KARTHICK L1 | SRI KUBERA CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00Name of Work: Improvement to the road in Kumaran nagar all street at Sulthanpet H/O Varapatti | |||||
| 2.00 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | 1,200 | Sqm | 6.3 ₹7,560 Lowest | 6.3 ₹7,560 Lowest |
| 3.00 | Picking the existing BT surface and sectioning including all labour charges etc, complete. | 1,082.92 | Sqm | 23.3 ₹25,232.04 Lowest | 25 ₹27,073 |
| 4.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 180 | Cum | 140.3 ₹25,254 Lowest | 150 ₹27,000 |
| 5.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in Subbase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 324.88 | Cum | 2,429.5 ₹7,89,295.96 Lowest | 2,500 ₹8,12,200 |
| 6.00 | Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | 3,248.75 | Sqm | 87.3 ₹2,83,615.88 Lowest | 90 ₹2,92,387.5 |
| 7.00 | Applying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. complete | 3,248.75 | Sqm | 20.5 ₹66,599.38 | 20 ₹64,975 Lowest |
| 8.00 | Providing and laying Bituminious concrete which shall consists of construction of a single course binder /wearing corse on a previosly prepared Bituminous base to the requirements of the specification using 60/70 grade bitumen as per MorRTH specificaton CI.508. | 81.23 | Sqm | 11,472.4 ₹9,31,903.05 Lowest | 11,500 ₹9,34,145 |
| 9.00 | Collection and supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site anf labour charges etc. comp for side berms | 120 | Cum | 147.1 ₹17,652 | 147 ₹17,640 Lowest |
| 10.00 | Road Marking by providing and laying of hot applied Thermoplastic Compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5mm exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes. | 171 | Sqm | 890 ₹1,52,190 Lowest | 890 ₹1,52,190 Lowest |
Tender Value
₹32.3 L
EMD Value
₹32,300
Closing Date
9 Mar 2026, 3:30 pmClosed
Block Development Officer Block Panchayat
Block Development Officer Block Panchayat Sulthanpet Block - 641669
Improvement to the road in Kumaran Nagar All Street at Sulthanpet H/o Varapatti
2026_RDTN_669120_1
1077/2025/A2
Open Tender
Civil Works
Works
90 days
Work
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹32,300
11 Mar 2026
2 Mar 2026
9 Mar 2026
2 Mar 2026
9 Mar 2026
2 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Name of Work: Improvement to the road in Kumaran nagar all street at Sulthanpet H/O Varapatti | - | - | - | - |
| 2 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | 1,200 | Sqm | - | - |
| 3 | Picking the existing BT surface and sectioning including all labour charges etc, complete. | 1,082.92 | Sqm | - | - |
| 4 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 180 | Cum | - | - |
| 5 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in Subbase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 324.88 | Cum | - | - |
| 6 | Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | 3,248.75 | Sqm | - | - |
| 7 | Applying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. complete | 3,248.75 | Sqm | - | - |
| 8 | Providing and laying Bituminious concrete which shall consists of construction of a single course binder /wearing corse on a previosly prepared Bituminous base to the requirements of the specification using 60/70 grade bitumen as per MorRTH specificaton CI.508. | 81.23 | Sqm | - | - |
| 9 | Collection and supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site anf labour charges etc. comp for side berms | 120 | Cum | - | - |
| 10 | Road Marking by providing and laying of hot applied Thermoplastic Compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5mm exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes. | 171 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.21 MB
32300PB.pdf
Tender Documents • 0.26 MB
BOQ_804010.xls
BOQ • 0.24 MB
Affitavit.pdf
Tender Documents • 0.12 MB
32300TP.pdf
Tender Documents • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].