Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.2 LAdmitted-Finance | -38.10% | ₹6.2 L | L1 | Admitted-Finance |
| 2 | L2₹7.3 LAdmitted-Finance | -27.00% | ₹7.3 L | L2 | Admitted-Finance |
| 3 | L3₹8.3 LAdmitted-Finance | -17.02% | ₹8.3 L | L3 | Admitted-Finance |
| 4 | L4₹9.9 LAdmitted-Finance | -1.69% | ₹9.9 L | L4 | Admitted-Finance |
| 5 | L5₹10.0 LAdmitted-Finance | -0.69% | ₹10.0 L | L5 | Admitted-Finance |
Updated dates
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
20 Jan 2026, 1:00 pmClosed
Executive Engineer PWD(RandB)nagrota Jammu
Executive Engineer PWD(RandB)nagrota Jammu
Permanent Restoration of Road from Main Road Jherry Kherry
2026_PWDJK_300349_3
Enit 68 of 2025-26 dated 09-01-2026
Open Tender
Civil Works - Roads
15 days
Executive Engineer PWD(RandB)nagrota Jammu
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer PWD(RandB)nagrota Jammu
₹20,000
Yes
31 Jan 2026
10 Jan 2026
21 Jan 2026
10 Jan 2026
20 Jan 2026
10 Jan 2026
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil :
Hand Pack Stone Filling in Wire Crate including Cost of wire Crate and Stone (all complete) as per Directions of engineer in charge. (Crate Size 6.0 x 1.2 x 1.2 Mt). Complete Job.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
Excavating, supplying and filling of local earth (including royalty)by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.
Carriage of material by M.T including loading unloading and stacking at site complete
Stone for an av. Lead 10.00 Km.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
BOQ_974433.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid