Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11,450Admitted-Finance 1 GANESH DARSHAN ADV SURVE MARG SANDHURST ROAD W MUMBAI 9 | MUMBAI | MAHARASHTRA | ₹11,450 | L1 | Admitted-Finance |
| 2 | L2₹11,500+₹50 (0.44%)Admitted-Finance B 204 KAVITA KUNJ CHS MITHBUNDER ROAD KOPRI THANE E 400603 | THANE | THANE | MAHARASHTRA | 400603 | ₹11,500+₹50 (0.44%) | L2 | Admitted-Finance |
| 3 | L3₹14,200+₹2,750 (24.0%)Admitted-Finance | ₹14,200+₹2,750 (24.0%) | L3 | Admitted-Finance |
| 4 | L4₹14,500+₹3,050 (26.6%)Admitted-Finance | ₹14,500+₹3,050 (26.6%) | L4 | Admitted-Finance |
| 5 | L5₹14,800+₹3,350 (29.3%)Admitted-Finance | ₹14,800+₹3,350 (29.3%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ELECTROPLUS INFRA PRIVATE LIMITED L5 | Speedfrost Services Pvt. Ltd. L1 | Gil Airconditioning And Refrigeration Services L2 | Nandan Air Conditioning And Electrical Services L3 | SWA ENTERPRISES L4 |
|---|---|---|---|---|---|---|---|---|
| 1.10 | Providing Comprehensive annual maintenance of Air conditioning system containing any type like VRF/Chiller Plant/Ductable/VRV/AHU Unit of any Make .
Scope of work include 1) Maintenance work should include Quarterly servicing, of all indoor and outdoor units and AHU.
2) Maintain the whole Air conditioning system 24x7 operation, routine inspection, preventive maintenance, breakdown maintenance and major and minor repairs/replacement of any parts of indoor unit ,outdoor unit, AHU, Main electrical panel of all AHU/Indoor Unit/Outdoor Unit of any Type of control panel with free of cost .3) The contractor should appoint required skilled employee along with unskilled employee for 24x7 days for safe operation and minor repaire of Air conditioning system. All responsibilties of minimum wages act, Labour insurance & welfare and Govt Authorities if any lies with agency for period of contract.
4)The contractor shall attend all faults of Air conditioning system immediately, carry out preventive maintenance and replacement of all Necessary part of AC system.5) The contractor shall ensure proper housekeeping and cleanliness of the premises, maintain accurate and updated logbooks and records of operations and maintenance major and minor repairs activities, and ensure uninterrupted service 24x7 days as instructed by engineer-in-charge.
After completion of period the Air Conditioning System must be handed over to department in good working condition. | 1 | per HP per year | 14,800 ₹14,800 | 11,450 ₹11,450 Lowest | 11,500 ₹11,500 | 14,200 ₹14,200 | 14,500 ₹14,500 |
Tender Value
Refer Docs
Closing Date
19 Aug 2026, 2:00 pmClosed
Joint City Engineer
PCMC Pimpri
Rate Analysis for Annual Comprehensive Maintanance of VRF/VRV Air Conditioning Unit.
2026_PCMCP_1327584_1
Cward/8/26
Open Tender
Electrical Works
Item Rate
180 days
PCMC
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
27 Aug 2026
12 Aug 2026
20 Aug 2026
12 Aug 2026
19 Aug 2026
12 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.1 | Providing Comprehensive annual maintenance of Air conditioning system containing any type like VRF/Chiller Plant/Ductable/VRV/AHU Unit of any Make .
Scope of work include 1) Maintenance work should include Quarterly servicing, of all indoor and outdoor units and AHU.
2) Maintain the whole Air conditioning system 24x7 operation, routine inspection, preventive maintenance, breakdown maintenance and major and minor repairs/replacement of any parts of indoor unit ,outdoor unit, AHU, Main electrical panel of all AHU/Indoor Unit/Outdoor Unit of any Type of control panel with free of cost .3) The contractor should appoint required skilled employee along with unskilled employee for 24x7 days for safe operation and minor repaire of Air conditioning system. All responsibilties of minimum wages act, Labour insurance & welfare and Govt Authorities if any lies with agency for period of contract.
4)The contractor shall attend all faults of Air conditioning system immediately, carry out preventive maintenance and replacement of all Necessary part of AC system.5) The contractor shall ensure proper housekeeping and cleanliness of the premises, maintain accurate and updated logbooks and records of operations and maintenance major and minor repairs activities, and ensure uninterrupted service 24x7 days as instructed by engineer-in-charge.
After completion of period the Air Conditioning System must be handed over to department in good working condition. | - | per HP per year | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
BOQ_2273361.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .