Loading…
Loading…
Tender Value
₹4.6 Cr
EMD Value
₹7.0 L
Closing Date
4 Jun 2026, 9:30 pmClosed
Hubli Electricity Supply Company Limited
Arranging power supply to an extent of 5000 KVA HT Installation under PM-e Bus Sewa Scheme in the name of Works Manager NWKRTC Regional Workshop Gokul Road Hubballi on 33KV Voltage Class for EV Charging Station at Hubli city in O&M Urban Division HESCOM Hubballi on Total turnkey basis.
301213
HESCOM/2025-26/EL/WORK_INDENT976/CALL-2
Open
Electrical
HESCOM Superintending Engineer (PMC)Corporate Office Hubli
19 documents required · 19 mandatory
The bidder should have carried out construction of 11KV and above class UG cable works for a minimum distance of 80% of tendered quantity on Total Turnkey or Partial turnkey or Labour Contract basis during any one of the in the last Five Financial Years(i.e. 2020-21,2021-22,2022-23 2023-24 and 2024-25) on Total Turnkey/Partial Turnkey Basis/ Labour contract basis/self-execution basis in any State/ Central Govt. Distribution Companies / PSUs.(QR changes for above said work).Such works shall be in successful operation for a period of at least 1(One) year as on date of submission of bid.As a proof of documentary evidence Award copies and work completion certificates duly mentioning date of work completion and Executed cost issued by the competent authority not below the rank of Executive Engineer (Ele) of any State/Central Govt. Distribution Companies / PSUs shall be uploaded. The Experience certificate shall be submitted as per Annexure-IV
The Bidder should have achieved in at least Two financial year, a minimum financial turnover of not less than Two Times the amount put to tender in the last five financial years (i.e., 2020-21 2021-22, 2022-23, 2023-24 & 2024-25).The bidder shall upload the downloaded Form GSTR-9/9C, 3CA/3CB & 3CD from the portal along with Copies of Annual turnover certificate and audited balance sheet of profit and loss account duly mentioning the UDIN No duly certified by Chartered Accountant as applicable.Documents without UDIN No, GSTR-9/9C, 3CA/3CB & 3CD downloaded from portal are liable for rejection.Note: Updated to the FY in which the tenders are invited. Financial turnover of previous years shall be given a weight of 10% (say) per year to bring them to the price level of the FY in which the tenders are invited
The cash at bank, term deposits and availability of fund based credit facilities shall not be less than 30% of the amount put to tender (Rs. 139.10 Lakhs)shall be supported by a certificate issued by Nationalized/ scheduled Bank as per the Annexure format attached shall be uploaded.If the Tenderer has banking with more than one Bank, then the available liquid assets mentioned above on a particular date i.e., as on date of bid submission or at a later date before the last date for bid submission of tender shall be the same date for all the banks.The said Credit Facility Certificate should possess the name of the Firm and tender Indent number and the credit facility to be issued in the name of Superintending Engineer (Ele),PMC, Corporate Office,HESCOM, Navanagar, Hubli. The credit facility certificate should be in the Format Annexed to this bid.ANNEXURE.The conditional credit certificates are liable for rejection.
The bidder should have Satisfactorily completed (at least 90% of the contract value), as prime a contractor, at least one contract involving 33KV and above class,substations/Construction of lines/ Reconductoring of lines of value not less than 50% of the Amount put to Tender(Rs.231.85 Lakhs) in any State/Central Govt./Distribution Companies/PSUs in the last Five Financial Years. (i.e. 2020-21,2021-22,2022-23 2023-24 and 2024-25).As a proof of documentary evidence Award copies and work completion certificates duly mentioning date of work completion and Executed cost issued by the competent authority not below the rank of Executive Engineer (Ele) of any State/Central Govt. Distribution Companies / PSUs shall be uploaded. The Experience certificate shall be submitted as per Annexure-IV.Note- Updated to the FY in which the tenders are invited. The value of the completed works shall be given a weight of 10% per year to bring them to the price level of the FY in which the tenders are invited.
The bidder shall be a sole proprietorship firm or a partnership firm or a company incorporated under companies Act 1956/2013. Copy of the Certificate of Incorporation in case of Registered Company/ Partnership deed in case of Partnership Firm/GST or PAN registration in case proprietor ship firm is to be uploaded.
The bidder should possess valid Super grade Electrical Contractor license issued by the Electrical Inspectorate, Govt. of Karnataka. The validity of the license should be in force at the time of submission of Bids.(Note: Firm name in the license as well as all the statutory documents should be same otherwise bid is liable for rejection).Scanned original copy of the Super grade Electrical Contractors License issued by Electrical Inspectorate, Government of Karnataka is to be uploaded by the bidder.
The bidder should upload original scanned copy of ESI issued by the respective competent authorities of the concerned department.
The bidder should upload original scanned copy of EPF Reg. No issued by the respective competent authorities of the concerned department
The bidder should upload original scanned copy of Pan No issued by the respective competent authorities of the concerned department.
The bidder should upload original scanned copy of GST No. issued by the respective competent authorities of the concerned department.
The bidder should possess valid original scanned copy of Registration Certificate of Establishment FORM C (Labour Reg.) issued by Department of Labour, Government of Karnataka. The bidder should upload original scanned copy of Registration Certificate of Establishment FORM C (Labour Reg.) issued by Department of Labour, Government of Karnataka
The bidder should not have been Black-Listed by ESCOMs/ KPTCL/ any other Government Distribution/ Transmission utilities including PSUs as on date of bid submission. Self-declaration for the same shall be uploaded (Annexure-I).
The bidder should not have been defaulted & Terminated due to non-performance in execution of works against the order placed by ESCOMs/KPTCL/any other Government Distribution/Transmission utilities including PSUs as on date of bid submission. Self-declaration for the same shall be uploaded (Annexure-II)
The bidder should provide detailed information on any litigation or arbitration arising out of contracts completed or under execution by it over the last five years with /KPTCL/ESCOMS. A history of awards involving litigations against the bidder or any part may result in rejection of bid. Self-declaration for the same shall be uploaded (Annexure-III)
Tender Capacity: The bidder should upload available tender capacity calculated in the prescribed format through e-procurement portal within due date of submission of bids. The available tender capacity shall be more than the total tender value.
Pre Survey: The bidder at his own responsibility must visit and examine the site of works & its surroundings and obtain all information that may be necessary for participating in the tender. The cost of the visiting/survey of the proposed works shall be at the bidders own expenses.The site inspection survey certificate of the proposed works issued by the concerned Executive Engineer (Ele).33KV S&L Division, HESCOM should be obtained by the bidder and shall be uploaded
The bidder from Nations sharing Border with India should upload the certificate issued by GOI.OR Self-declaration for not from Nations sharing Border with India.Registration certificate issued by the competent authority shall be uploaded. OR If not Self-declaration in the prescribed format as per Annexure-VII shall be uploaded.The self-declaration shall clearly indicate the tender enquiry number & date on which declaration is done.
₹5,000
₹7.0 L
27 May 2026
27 May 2026
5 Jun 2026
1 Jun 2026
1 Jun 2026
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Self-Declaration statement of Bidder/Contractor for works Done…as on date of Bid submission.
Note: Please fill all required data and upload the signed copy in e-procurrement portal.
Bid Indent No: HESCOM/2025-26/EL/WORK_INDENT976/CALL-2 Format-I
Work done certificate details as per QR.
Sl.No. Year of Completion Name of the Department Work Done Certificate No.& Date. Work Done Certificate issued by (Executive Engineer, Superintending Engineer .,.etc.,) Station voltage Class (220kV, 110kV, 66kV, 33kV) Station Capacity (MVA) 33 KV Line in R.Kms 33KV ROC in R.Kms UG cable in R.Kms Others Cost of the work/project Executed cost Rs.in Lakhs
Note:Works completed during the period from (i.e., 2020-21,2021-22,2022-23 2023-24 and 2024-25) shall only be furnished, others will not be accepted.
I/We hereby declare that I/We had carried out above works and completed in all respects and are in successful operation for the last 1 (One) year i.e.,as on date of Bid submission. Further notice for defects in executed works is not received from concerned Department/recieved and same have been attended within the time. Any information, if found to be incorrect, wrong, misleading or misrepresenting , I/We am/are aware that I/We may be held liable for it.
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Arranging power supply to an extent of 5000 KVA HT Installation under PM-e Bus Sewa Scheme in the name of Works Manager NWKRTC Regional Workshop Gokul Road Hubballi on 33KV Voltage Class for EV Charging Station at Hubli city in O&M Urban Division HESCOM Hubballi on Total turnkey basis
Sl. No Particulars Material Labour Civil Total
1 Materials cost (Exclusive of GST) 33018806.30 33018806.30
2 Labour charges+ Decommissioning (Exclusive of GST) 12097622.65 12097622.65
3 Civil Engineering Charges (Exclusive of GST) 617199.50 617199.50 2.806226956
5 Area Specific Loading @ 5% on labour charges 0 604881.13239 30859.975 635741.11
% age of tender compenents included 7180646.863
Executive Engineer (EL), Superintending Enginner (El),
Projects - 1 , HESCOM, Hubli PMC, HESCOM, Hubli
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Arranging power supply to an extent of 5000 KVA HT Installation under PM-e Bus Sewa Scheme in the name of Works Manager NWKRTC Regional Workshop Gokul Road Hubballi on 33KV Voltage Class for EV Charging Station at Hubli city in O&M Urban Division HESCOM Hubballi on Total turnkey basis
PART "A" (COST OF MATERIALS)
Sl.No Description Unit Qty Rate in Rs Amount Rs
1 RCC Poles 9.5 mtr length and 350 Kg Working load (ESCOM 2023-24 Page No.2 of 50 Sl No.8 ) Nos 6 12018.00 72108.00 4509.00
2 33 KV DP Structure hardware consisting of double power X-arms, Horizontal cross brace, back cleat, strain plate bolts & nuts as per drawing.(ESCOMs 2023-24 Page No 82 of 33KV system Sl No.13 ) Set 3 7242.00 21726.00 67.00
3 33KV Polymer pin insulator (ESCOM 2025-26 Page No 82 of 33KV system Sl No.12) Nos 9 854.40 7689.60 175.40
4 Isolator 33 kV, 800 A, 25 kA Upright without Earth Switch (Live Point Height 4750 mm ( KPTCL CSR 2023-24 Page No.37 Sl No.9-9.14.3 ) ) Set 3 95590.00 286770.00 0.00
5 33KV 3 Core 400 Sq.mm XLPE Power UG Insulated Aluminium cable (Double Run) (ESCOM 2023-24 Page No 82 of 33KV system Sl No.27) Km 6.864 3485532.00 23924691.65 -719909.00 28866147.024 15 5.4912
6 HDPE pipe Grade PE100-PN8.0,160mm dia ( BWSSB, RDW&SD, KUWS&DB CSR 2023-24 Page No. 103 Sl No. 9.11.7 ) mtr 6000 971.00 5826000.00 256.00 4941455.38
7 Heat Shrinkable Straight through jointing kits with Aluminum lugs& ferrules 33 kV 3 Core XLPE UG Cable-400Sq.mm (ESCOM 2023-24 Page No 84 of 33KV system Sl No.47) Nos 37 40519.20 1499210.40 4650.20 71500
8 33 KV Pothead kits heat Shrinkable out door type for 3X400 Sq.mm XLPE cable.33 KV Heat Shrinkable Out door type cable termination kits for 3 Core X400 Sq.mm XLPE cable. ( ESCOM CSR 2023-24 Page No 71-81 Sl No 42 (8.14 )) Nos 10 14212.00 142120.00 0.00 59090.90909
9 MS pipe 200mm dia with collar ((ESCOM 2023-24 Page No.31 of 50 Sl No.675 ) Mts 64 1010.40 64665.60 49.40
10 Providing, Laying and Fixing of GI pipes conforming to IS 1239:1990 with latest amendments complete with GI fittings (excluding the cost of fittings) with cuts and threads wherever necessary, including testing for water tightness, with all lead and commissioning. (contractor will make his own arrangements for procuring water for testing) For:Heavy Duty GI Pipe etc. complete.For Heavy Duty GI pipe: Heavy Duty GI pipe of 100mm dia ( WS&SW Vol-5 CSR 2023-24 Page No. 128 Sl No.11.3.9 ) m 40 1412.00 56480.00 0.00
11 Cable covering tiles 250x125x40mm (ESCOM 2023-24 Page No.31 of 50 Sl No.675 ) Nos 400 10.78 4310.40 0.52 65.54545455
12 Sand - M-Sand all round the cable to a depth of 75 mm and width of 500 mm (0.5mX0.075mX100m=3.75Cmt) (KPWD CSR 2023-24 page no. A 40 Sl No. 64) m³ 3.75 1771.00 6641.25 295.00
13 Route & Joint indicating slab with MS Anchor rod (ESCOM 2023-24 Page No.45 of 50 Sl No.258 ) Nos 100 140.40 14040.00 24.40
14 Caution/Danger Boards (ESCOM 2025-26 Page No.31 of 50 Sl No.686) Nos 6 157.20 943.20 7.20
15 Phase Plates (Set of 6 per tower)( KPTCL CSR 2023-24 Page No 43 Sl No 19-19.1 ) Set 4 528.00 2112.00 0.00
16 33kV Isolator Mounting Structure (KPTCL CSR 23-24 Page No. 2 Sl No. 15 Set 0.77 132000.00 101772.00 -16830.00
17 Grounding of towers including cost of 40 mm dia 2.5 mm thick, class 'C' G.I. Pipe of 3 metres length as per specification with 50 X 6 mm GI Flats 3 metre long, salt, charcoal, including excavation charges ( KPTCL CSR 2023-24 Page No. 115 Sl No.6 a) Set 3 5224.00 15672.00 0.00
18 Coyote ACSR Conductor (CSR 2025-26 Page No: 02 Sl No: 24 ) Km 0.150 155000.00 23250.00 16000.00
19 33 KV Isolators : 33KV, 800A, 25 KA Class Double Break manually operated isolators with Pad connectors suitable for Coyote ACSR Conductor, as per technical specification with Solid Core, cylindrical post insulators 0.00 0.00
20 a) Upright mounting type with earth switch. CSR 2023-24 Page No 37 Sl No 9.14.1 Set 1 84700.00 84700.00 0.00
21 b) Upright mounting type without earth switch. CSR 2023-24 Page No 37 Sl No 9.14.2 Set 1 70180.00 70180.00 0.00
22 Caution/Danger Boards (ESCOM 2025-26 Page No.31 of 50 Sl No.686) Nos 6 157.20 943.20 7.20
23 Mounting Structures:Mounting Structures for equipments made out of fabricated galvanised angle iron for GOS / CT's / PT's / LA's / NCT / HI PI etc as per approved drawing (CSR 2023-24 Page No: 02 Sl No: 16) 0.00 0.00
25 33KV Current Trasformers - 0.142 MT Nos 3 17608.00 52824.00 -1635.84
26 33 KV Potential Transformer - 0.142 MT Nos 3 17608.00 52824.00 -1635.84
27 33KV Lightning Arrestors - 0.07 MT Nos 3 8680.00 26040.00 -806.40
28 Fabrication, galvanization and supply of Station Structures for 4 Nos of cable support etc.(KPTCL CSR 23-24 Page No. 2 Sl No. 15 MT 1 132000.00 132000.00 -16830.00
30 33KV Potential transformer 33 KV/110 Volts (KPTCL CSR 23-24 Page No. 9 Sl No. 161 Nos 3 48000.00 144000.00 2020.00
31 Copper control cable 4 core 4 Sq mm along with lugs (CSR 2023-24 Page No 40 Sl No 13.7) Mtr 50 177.00 8850.00 0.00
32 CT PT Operated ETV Meter 0.2s Accuracy Class with ABT feature and DLMS protocal with ToD with RS 232 Port UNIDIRACTIONAL (Used for Boundary Metering) (CSR 2023-24 Page No:2 of 50, Sl No :395) Nos 2 19615.00 39230.00 0.00 196.969697
33 Meter Test Terminal Block (MTTB) Nos 2 500.00 1000.00 0.00 113.7238435
34 Meter box 2mtrs , 1 check meter, 1 main meter Nos 1 10000.00 10000.00 0.00
35 33KV Lightning arrestor 30 KV 10 KA (CSR 2023-24 page no 69 of 81Sl No 5) Nos 9 11918.40 107265.60 -2897.60
36 Pad Clamp Coyote As per KPTCL SR- 2023-24, No- 3, SL.No-45) Nos 15 848.00 12720.00 41.00
37 T Clamp Coyote As per KPTCL SR- 2023-24, No- 5, SL.No-90) Nos 3 987.00 2961.00 0.00
38 CT ClampAs per KPTCL SR- 2023-24, No- 16, SL.No-325) Nos 6 1424.40 8546.40 375.40
Total Materials Charges 33018806.30 36270738.794
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Arranging power supply to an extent of 5000 KVA HT Installation under PM-e Bus Sewa Scheme in the name of Works Manager NWKRTC Regional Workshop Gokul Road Hubballi on 33KV Voltage Class for EV Charging Station at Hubli city in O&M Urban Division HESCOM Hubballi on Total turnkey basis
PART "B" (COST OF LABOUR)
Sl.No Description Unit Qnty Rate Rs Amount Rs
1 Erection of RCC/I Beam poles 9.5/12 mtrs long ( ESCOM CSR 2025-26 Page No 35 of 50 Sl No 31 ) Nos 6 2372 14232.00 782.00 1699.20
2 Errection of DP structure including fixing of braces, insulators etc as per approved drawing for 33 KV ( ESCOM CSR 2025-26 Page No 35 of 50 Sl No 34 ) set 3 5347.00 16041.00 1213.00 4418.40 4455.833333
1 EARTH WORK : In all kinds of soils Depth upto 1.5 m 1x1.5x160 = 260 Cmt (KPWD CSR 2023-24 Vol-1 Page No : 5 Item No. 1.4.1) m³ 240 242.00 58080.00 0.00 201.6666667
2 EARTH WORK : Depth exceeding 1.5m, but not exceeding 3 m 1x0.5x160 = 80 Cmt (KPWD CSR 2023-24 Vol-1 Page No : 5 Item No. 1.4.1) m³ 80 259.00 20720.00 0.00
3 Refilling the cable trenches with selected available earth from trench excavation including watering, consolidation in layers of 15 cm. Thickness including depositing of the surplus earth with a lead of 200 Mtrs.( ESCOM CSR 2023-24 Page No 63-81 Sl No 95-29.07 ) CMT 320 58.00 18560.00 0.00
6 Normal Soil - 8” Bore (UG cable along with upto 5 Nos of 50/42 mm or 40/33 mm HDPE/PLB Pipe) Rmtr 6600 1770.00 11682000.00 115.00
7 Spreading and forming with sand all round the cable to a depth of 75 mm and width of 500 mm. (Does not include cost of sand) ( ESCOM CSR 2023-24 Page No 64 of 86 Sl No. 268 ) Km 0.100 15864.00 1586.40 1054.00
8 Laying of cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as directed by the departmental staff 3x300 to 3x500 Sqmm ( ESCOMs CSR 2023-24 Page No. 60 of 86 Sl No. 172 ) Km 0.26 70639.20 18648.75 4599.20
9 Heat shrinkable Straight Through Joint 3x300 to 3x400 Sqmm ( ESCOM CSR 2023-24 Page No. 52-81 Sl No. 181 ) Set 37 3045.60 112687.20 197.60 2538
10 Making and Fixing pot head for HT Cable only Heat shrinkable Type Terminations 3x300 to 3x400 Sqmm Set 10 3045.60 30456.00 387.60
11 Base concreting For 11/9.5/9/8 M Pole (500x650x150 mm) ( ESCOM CSR 2023-24 Page No. 8 of 86 Sl No. 26 A a ) Each 6 312.00 1872.00 0.00
12 Pole concreting (without coping) For 9.5 M Pole (650x500x1850 mm) ( ESCOM CSR 2023-24 Page No. 8 of 86 Sl No. 26 B a ) Nos 6 3746.00 22476.00 0.00
13 Coping for Poles 150 mm around pole for an height of 300 mm for RCC/PSCC Pole (400x400x300 mm)( ESCOM CSR 2023-24 Page No. 9 of 86 Sl No. 26 C a ) Nos 6 312.00 1872.00 0.00
14 Mounting Structure Erection, alignment & assembly of fabricated steel lattice structure, pedestal structures & mounting structures for GOS, CTs, PTs, LAs etc.,( 5723/ton X 0.257MT) ( KPTCL CSR 2023-24 Page No. 116 Sl No. 8 b ) Nos 3 1470.81 4412.43 0.00 1470811
15 Erection of 33KV Isolators: 33KV, 800A, 20KA Class Double Break manually operated isolators with Pad connectors suitable as per technical without earth switch. specification with Solid Core, cylindrical post insulators. ( KPTCL CSR 2023-24 Page No 119 Sl No 17-a ) set 3 1319.00 3957.00 2.48 5
16 Assisting in Testing and Commissioning Upright ( KPTCL CSR 2023-24 Page No. 119 Sl No. 17 E i ) Set 3 191.00 573.00 0.00 123.6
17 Fixing of Route Joint Indicating Slab( ESCOMs CSR 2023-24 Page No. 64 of 86 Sl No. 258 ) Nos 100 124.00 12400.00 8.00
18 Fixing of Danger Board ( ESCOM CSR 2023-24 Page No 45-81 Sl No 63.15. ) Nos 16 85.00 1360.00 5.00
19 Errection of Mounting Structures: 0.00 0.00
21 33KV Current Trasformers - 0.142 MT Nos 3 812.666 2438.00 0.00
22 33 KV Potential Transformer - 0.142 MT Nos 3 812.666 2438.00 0.00
23 33KV Lightning Arrestors - 0.07 MT Nos 3 400.61 1201.83 0.00
24 Errection of Isolators 33kV,650/ 800A, 25kA Upright without Earth Switch complete metallic portion with insulator (live point height 4750mm) (CSR 2023-24 Page No : 119 Sl No.17a ) Set 2 1319.00 2638.00 0.00
25 Assisting in testing Commissioning of Isolators (CSR 2023-24 Page No : 119 Sl No.17e) Set 2 191.00 382.00 0.00
27 Erection of CT`s , PT`s & LA's 0.00 0.00
28 Erection of CT`s , PT`s & LA's wiring including movement from the point of un loading to the point of erection. CSR 2023-24 Page No 118 Sl No 14 Set (3Nos) 2 2199.00 4398.00 0.00
29 Assisting in testing and commissioning CSR 2023-24 Page No 118 Sl No 14c Set (3Nos) 2 2837.00 5674.00 0.00
30 Testing and commissioning of CT & PT : Wiring : Inspection of wiring, ferruling crimping of lugs , connection up to marshalling box and control panel CSR 2023-24 Page No 118 Sl No 14c Set (3Nos) 2 11264.00 22528.00 0.00
31 Laying of control cables from equipment to control panels Rmtr 50 14.88 744.00 3.88
32 Meter box with Meter & TTB Nos 2 500.00 1000.00 0.00
33 Providing & fixing GI Pipe B Class 40 mm For CT PT Wiring Mtr 100 295.00 29500.00 0.00
Total Labour Charges 12097622.65 11310902
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Arranging power supply to an extent of 5000 KVA HT Installation under PM-e Bus Sewa Scheme in the name of Works Manager NWKRTC Regional Workshop Gokul Road Hubballi on 33KV Voltage Class for EV Charging Station at Hubli city in O&M Urban Division HESCOM Hubballi on Total turnkey basis
PART "C" (CIVIL)
Sl.No Description Unit Qty Rate Rs. Amount Rs
A Site Levelling and construction of Retaining wall.
1 a) Levelling the yard to required RL including cutting and transporting the excavted stuff to the palce shown in for all types of soil and strata excluding hard rock and filling the same wherever required including all lead, lift and labour etc., complete. (Site block levels not furnished hence approximate quantity is arrived.) CMT 75 145.00 10875.00 150
2 b) Levelling the yard to required R.L by filling with approved new earth including cost of all material spreading charges, labour etc., complete CMT 75 200.00 15000.00
3 c) Construction of size stone masonry retaining wall in cement mortar (1:6) including cost of excation and providing bed concrete (1:4:8) and pointing to the exposed faces with cement mortar (1:3) as per enclosed typical drawing and technical specification including cost of all material and labour etc., complete. CMT 50 3741.53 187076.50
4 Supplying & Spreading of Jelly 100mm thick with 20/25mm jelly with all lead and lift including cost of all materials and labour charges. The jelly used shall be free from dust or organic materials. Cmt 30 925.00 27750.00
5 SECURITY FENCING FOR SWITCH YARD WITH ENTRANCE GATE: Providing and constructing security fencing for the switch yard using RCC fencing poles and chain link mesh as per the enclosed drawing and technical specification including cost of all materials, labour etc., complete. R. Mtrs 50 2434.88 121744.00
B Foundations: Engineering, supply of all labour, material and construction of RCC footing including the cost of excavation, cement concreting, reinforcement, backfilling, waterproof cement painting, for all works, grounding underpining etc., for the following works. 0.00
6 33KV CT support structure Nos 3 3565.00 10695.00
7 33 KV PT support structure Nos 3 3565.00 10695.00
8 33KV Isolators support structure Set 2 1748.00 3496.00
9 33KV Lightning arrestor support structure Set 1 672.00 672.00
10 Fabrication work of MS channels & GI angles for 4 pole structure MT 1 20000.00 20000.00
C Earth mat formation : 0.00
11 Suppy & Laying of MS flats 50X6 welding and applying ACB paint to welded portion and covering with sodium bentonite clay, as per the drawing for standard specifications and consolidation (MWSR 2019 Page No 90 SlNo 29bi) Rmtr 120 273.00 32760.00
12 Grounding of equipment with 50X6mm GI flat and connecting equipment to the earth mat /ground pit [All materials to be supplied by the contractor(MWSR 2019 Page No 90 SlNo 29bi) Rmtr 60 226.00 13560.00
13 M S Rods 4mm dia [ MW SR-2019, Pg No-91, Sl No-29d) Each 24 305.00 7320.00
14 Supplying and providing 450 mm dia 450 mm hight 1.5 to 2 inch thick hume pipe collar. (MW SR 2019 91 Slno 29e) Each 12 1012.00 12144.00
15 Grounding of equipments by providing cast iron pipe of 100mm ID 13mm thickness 2.75 Mtrs long with 2 part clamp out of GI Flat 50X6mm continuously welded alround the pipe using cast iron welding electrodes as per drawing including the cast of excavation (all materials to be supplied by the contractor) [ MW SR-2019, Pg No-83, Sl No-11(c)] Set 12 10988.00 131856.00
16 supplying common salt in 50Kgs bags (2 bags per electrode) 100kgX14no=1400kg (CSR 2021-22 Page No 17 of 27 Sl No 441) Bag 12 303.00 3636.00
17 Supplying charcoal in 30Kgs bags.(6 bags per electrode) 120kgX14no=1680kg (CSR 2021-22 Page No 17 of 27 Sl No 440) Bag 12 660.00 7920.00
Total 617199.50
Sl.NO Particulars Unit Material Portion Labour Portion
Unit rate as per CSR 2023-24 including GST in Rs Unit rate as per CSR 2023-24 including GST in Rs
1 Fabrication, galvanising and supply of High tensile steel tower materials M+9 including GI Bolts & Nuts (CSR 2023-24 Page No 115 Sl No 18.1, MSN code 7308, per MT 1,48,830/-)(considered 2.687 MT per tower(2.687*148830=399906.2) Nos 71983 12427
2 33KV Special cross arm (CSR 2023-24 Page No 69 of 81 Sl No 15) & Labour (CSR 2023-24 Page No 45 of 81 Sl No 65) (Consider one & half for converting into one special cross arms)(As per SR horizontal cross arm rate is 2431/- per horizontal cross arm, hence for one special cross arm the rate is 3646.5/- ) Nos 656 69
3 33KV side braces (CSR 2023-24 Page No 69 of 81 Sl No 15) & Labour (CSR 2023-24 Page No 45 of 81 Sl No 65)(As per SR horizontal cross arm rate is 2431/- per peace, hence for side brace is 4862/-) (Two Horizontal Cross arms used to one side Braces) Nos 875 93
Tender Capacity Format
Details of work Executed during last 05 years ( To asses the value of A)
Sl No Year Work Executed Other related Electrical Works if any Cost of executed work in Rs Lakhs
New substations / Augmentation in Nos HT line in Rkms(11KV & above) DTC in Nos
Details of existing commitments and on-going works to be completed during next '6 months ( To asses the value of B) Attached in the next sheet
SL No Details of On Going works Award amount Rs in Lakhs Amount of work to be completed during next "6 months" Rs in Lakhs Completion period as per award Completion period remaining
Tender Capacity Formula= A*N*1.5-B
Where 'N'= 01=06 months of completion period for above subject work
Seal and signature of the Bidder
A= Maximum value of Distribution network work executed in any one year during the last 5 years i.e 2020-21,2021-22 ,2022-23 2023-24 & 2024-25 ( UP dated to __________________ price level) taking into account the completed as well as works in progress
N= Number of years/months prescribed for completion of the works for which Tenders are invited
B= Value,at________price level, of existing commitments and on-going works to be completed during the 'N'
Note: 1) The available tender capacity shall be more than the total tender value 2) Documentary Proof in support of value ‘A’, the Total value of works executed and payments received annually in the last 5 years shall be uploaded in the form of certificates issued by Chartered Accountant. In case if the same is not uploaded, then the maximum value of annual payments received towards the works executed which is indicated in the audited balance sheet in any one year during the last five years will be considered.
Tender Capacity Format
Details of existing commitments and on-going works to be completed during next "6 months ( To asses the value of B)
SL No Details of On Going works Award amount Rs in Lakhs Amount of work to be completed during next "06 months" Rs in Lakhs Completion period as per award Completion period remaining
Where 'N'= 1=06 months of completion period for above subject work
Note: The statement showing the value of existing commitments and ongoing works as well as the stipulated period of completion remaining for each of the works listed shall be countersigned by the Employer in charge, not below the rank of Executive Engineer or equivalent.( Note: L-1 in any of the recently called tender amount is also be considered as value of B along with the above)
Seal and signature of the Executive Engineer(Ele)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
5_section iv ECC INDENT 976 Call-2.doc
Others - ECC INDENT 976 Call-2 • 0.09 MB
10-format-i- work done.xls
Others - 10-format-i- work done • 0.04 MB
15 KPTCL Cicrcular insurance surety bond.pdf
Others - 15 KPTCL Cicrcular insurance surety bond • 1.59 MB
4_section iii GCC INDENT 976 Call-2.doc
Others - GCC INDENT 976 Call-2 • 0.13 MB
7 Annexures.doc
Others - 7 Annexures • 0.16 MB
1_NIT INDENT 976 Call-2.doc
Others - NIT INDENT 976 Call-2 • 0.14 MB
11 Revised Estimate Final.xlsx
Others - 11 Revised Estimate Final • 0.34 MB
14 Stamp Duty Circular.pdf
Others - 14 Stamp Duty Circular • 0.09 MB
12 Advisory NOte.pdf
Others - 12 Advisory NOte • 0.67 MB
3_section ii ITB INDENT 976 Call-2.doc
Others - ITB INDENT 976 Call-2 • 0.11 MB
8 technical specification.doc
Others - 8 technical specification • 0.58 MB
2_section i IFB INDENT 976 Call-2.doc
Others - IFB INDENT 976 Call-2 • 1.41 MB
13 FD417EXP.pdf
Others - 13 FD417EXP • 0.12 MB
9 tender capacity 976 Call-2.xlsx
Others - 9 tender capacity 976 Call-2 • 0.02 MB
6_section v SCC INDENT 976 Call-2.doc
Others - SCC INDENT 976 Call-2 • 0.12 MB
Download all tender documents and submit your bid