| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 CrAccepted-AOC | ₹3.8 Cr Quoted ₹377.03 | L1 | Accepted-AOC Low Rate |
| 2 | L2₹384.94+₹7.91 (2.10%)Rejected-Finance UTTARPARA | ₹384.94+₹7.91 (2.10%) | L2 | Rejected-Finance high rate |
| 3 | L3₹382.67+₹5.64 (1.50%)Rejected-Finance 7G CORNFIELD ROAD KOLKATA 700019 | KOLKATA | KOLKATA | WEST BENGAL | 700019 | ₹382.67+₹5.64 (1.50%) | L3 | Rejected-Finance high rate |
| 4 | Rejected-Technical | - | - | Rejected-Technical Electrical license not found Electrical supervisor License expired |
Tender Value
₹3.8 Cr
EMD Value
₹3 L
Closing Date
25 Jul 2019, 4:00 pmClosed
Chairman,Kharagpur Municipality
Kharagpur Municipality
Civil and Mechanical
2019_MAD_230864_1
WBMAD/ULB/KHARAGPUR/NIT/74e
Open Tender
CIVIL AND ELECTRICAL WORKS
Item Wise
120 days
Khargpur Municipality
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
Yes
Chairman,Kharagpur Municipality
₹3 L
Yes
Kharagpur Municipality
25 Aug 2020
3 Jul 2019
29 Jul 2019
3 Jul 2019
25 Jul 2019
9 Jul 2019
22 Jul 2019
Electrical Items :
Opening & closing of all the different dia sluice valves (80 mm dia to 350 mm dia) on different places along with the alignment of the rising main and distribution main at different places over the command area daily as and when required for regulating the supply of water and distributing water all overthe command area smoothly including cleaning and restoration of gland packing of sluice valve, air valve if required including opening the cap/ plug of wash out point or opening the sluice valves including de-jointing flenge joints (80 mm to 350 mm dia) including repairing works and cleaning the pipeline or changing of gate, spindle or liner etc. of sluice valves all complete, restoration works to be done including earth work in the excavation bailing outof water, re-filling the excavated earth, taking out of RCC slab or slab cover and refixing true to position etc. all complete as perNB:- Please see the special clause against this item in Tender Document. (25 nos of operator)
Picking up and removing old bituminous layer or sand sealing coat from old black topped surface and cleaning the exposed surface by scraping and stacking the material as directed. By manual means From 25mm to 50mm thick .A. 150mm dia to 200mm dia.
B.250mm dia to 300mm dia. of DI
C. 350mm dia to 400mm dia. of DI
D. 450mm dia. to 500 mm dia. of DI
E.700 MM DIA
F.80 mm dia to 110 mm dia
Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.A. 150mm dia to 200mm dia. of DI
B.250mm dia to 300mm dia. of DI
C. 350mm dia to 400mm dia. of DI
D. 450mm dia. to 500 mm dia. of DI
E.700 MM DIA
F.80 mm dia to 110 mm dia
Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75m.A. 150mm dia to 200mm dia. of DI
B.250mm dia to 300mm dia. of DI
C. 350mm dia to 400mm dia. of DI
D. 450mm dia. to 500 mm dia. of DI
E.700 MM DIA
F.80 mm dia to 110 mm dia
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing,spreading or stacking the spoils within a lead of 75 mts as directed.A. 150mm dia to 200mm dia. of DI
B.250mm dia to 300mm dia. of DI
C. 350mm dia to 400mm dia. of DI
D. 450mm dia. to 500 mm dia. of DI
E.700 MM DIA
F.80 mm dia to 110 mm dia
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete.A. 150mm dia to 200mm dia. of DI
B.250mm dia to 300mm dia. of DI
C. 350mm dia to 400mm dia. of DI
D. 450mm dia. to 500 mm dia. of DI
E.700 MM DIA
F.80 mm dia to 110 mm dia
(A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation withwater, ramming complete including the cost of supply of sand. B) - do- by fine sand.A. 150mm dia to 200mm dia. of DI
B.250mm dia to 300mm dia. of DI
C. 350mm dia to 400mm dia. of DI
D. 450mm dia. to 500 mm dia. of DI
E.700 MM DIA
F.80 mm dia to 110 mm dia
Hire and labour charges for shoring work (including necessary close plank walling, framing,Eucalyptus/Jhou bulla piling, strutting etc) completeas per direction of the Engineer-in-charge for foundation excavation.A. 150mm dia to 200mm dia. of DI
B.250mm dia to 300mm dia. of DI
C. 350mm dia to 400mm dia. of DI
D. 450mm dia. to 500 mm dia. of DI
E. 110 mm dia. to 160 mm dia. of HDPE
F.700 MM DIA
G.80-110 MM DIA AC
Flange joint to C.l./D.l/MS. pipes and specials including supply of rubber gasket. nuts. bolts. washers etc. of best quality to make the joint watertight at required hydraulic pressure all complete as per specification & direction of the Engineer-in-Charge.A. 150 mm dia. DI Pipe
B. 200 mm dia. DI Pipe
C. 250 mm dia. DI Pipe
D. 300 mm dia. DI Pipe
E. 350 mm dia. DI Pipe
F. 400 mm dia. DI Pipe
G. 450 mm dia. DI Pipe
H. 500 mm dia. DI Pipe
I.700 MM DIA
Disinfection of water main by filling with water containing bleaching powder of sufficient quantity capable of maintaining a residual chlorine concentration of 10mg/l within the main after a detention period of two hours and flushing the same with fresh water all complete as per specification and direction of the Engineer-in- Charge. [After successful completion of the process, disposal of water and bacteriological testing of sample of flushed out water from the mains should be made at no extra cost] .A. 150/160 mm dia. DI Pipe
B. 200 mm dia. DI Pipe
C. 250 mm dia. DI Pipe
D. 300 mm dia. DI Pipe
E. 350 mm dia. DI Pipe
F. 400 mm dia. DI Pipe
G. 450 mm dia. DI Pipe
H. 500 mm dia. DI Pipe
I.700 MM DIA
J.110/100 MM DIA
K.80 MM DIA
Uprooting and removing plants from the surface of walls parapet etc and making good damages. Repairing of damages to be paid seperately (a) Small plant of girth of exposed stem upto 75 mm. lift upto 6 mtr
Hire and labour charges for 100 mm dia bamboo railing on Jhau / Eucalyptus post 1.40 m above G.L and 0.60 m below G.L tied strongly with bamboo railing with coir rope, digging holes for posts in any sort of soil or concrete surface packing the sides etc including cost of carriage of all materials and labour complete including cost of restoration to the damages of the ground to its original condition as per direction of Engineer- incharge after removing the barricade. (Cost of restoration to be paid separately.)(a) 100 mm. dia bamboo railing and 150 mm. dia. Jhaubullah / Eucalyptus posts @1.80 m. apart (ii) Railing with 3 rows.
Repairing charge for changing of gland packing of sluice valve/ air valve with supplying of gland packing grease etc. bailing out of water including removing the top cover slab of valve chamber and refixing the same after completion of work as per direction of EIC.A. 100mm dia to 150mm dia. of DI
B.200mm dia to 250mm dia. of DI
C. 300mm dia to 350mm dia. of DI
D. 400mm dia. to 500 mm dia. of DI
E. 110 dia to 160 mm dia. of HDPE
Repairing of flange joint after dismatling the joints, removing the unserviceable rubber insertion and supply new rubber insertion and supply upto 50% of new nuts and bolts all complete including necessary supply of washer etc. all complete as per direction of EIC.a) 80 mm to 100 mm dia.
b) 125 mm to 200 mm dia.
c) 250 mm to 350 mm dia.
c) 400 mm to 500 mm dia.
c) 600 mm to 700 mm dia.
Hire & labour charges for diesel generating set for lighting including fuel, 300M wire, 11 points with 200 Watt bulb with post for hanging & maintaining the same for day & night for the period.
Repair of Air valve by supplying ebonite and- rubber ball, gasket, nuts and bolts with washers and labour all complete.a)80 mm dia
b)100 mm dia
c. 150 mm dia.
d. 200 mm dia.
Cleaning silt (once in a year) from the over head reservoir, cleaning washing and disinfecting the same with bleaching powder, including machinery, tools and plants as per direction of EIC complete.a) Upto 1.5 lak gallon capasity OHR N.B -Bleaching powder is to be supplied by agency at his own cost and the above rates are inclusive of the same
Dismantling existing ferule with fitting and refixing the same after cleaning and washing of house connection pipe line
Shifting house connection or stand post connection from existing main to new main after excavation through any kind of soil and road materials up to required depth. dismantling existing ferrule with all fittings. plugging hole of old main with G.I. plug. drilling and tapping the new main. refixing the ferrule on the new main with serviceable old G.I pipes and other specials (New G.l. pipes and other specials. if required to be installed shall be paid extra) and back filling the trench with excavated materials all complete as per specification and direction of the Engineer- in-Charge.
Opening the cap / plug of washout point and opening sluice valve to clean tee pipe cleaning the cap/ plug and sluice valve after completion of the work including earthwork in excavation and refilling the same, daining out washed water etc. as per direction of EIC and replacing RCC top slab cover where necessary including refixing the opened cop/ plug in position complete.a. Cap opening
Bailing or pumping out water from foundation trenches.
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.
Brick work with 1st class bricks in cement mortar (1:6).(a) In foundation and plinth
Supply of double socket MJ COLLER complete set.A. 150 mm dia
B. 200 mm dia
C. 250 mm dia
D. 300 mm dia
E. 350 mm dia
F. 400 mm dia
H. 500 mm dia.
Supply of DI tail piece 150 mm dia.A. 150 mm dia to 300 mm dia
E. 350 mm dia to 450 mm dia
H. 500 mm dia. To 600 mm dia.
Supplying, alligning , lowering & laying of HDPE pipes, all type of specials ( Class III, Presure rating PN-6 Kg/m2), all types of Valves as per IS specification at proper position over a sand / local powdered earth cushion of 100 mm thick including cutting trenches up to the depth ( AV ) so as to maintain 1.00 Mtr earth cushion from top of pipe up to G.L. **in any kind of soil, road, flank,excluding hard rock and jointing by butt welding joint with suitable method with supply of jointing materials for HDPE pipes including cutting of pipes to required size and smoothening the cut end and sand papering to make it suitable for butt joint, refilling the trenches including dewatering the trenches etc. with Hydraulic testing as per IS: 3114, 1965 ( Article-6) & washing ,cleaning the water line system with chlorine of 50 mg per litre all complete up to the full satisfaction of E.I.C. ( This Rate include matirial, labour, all taxes , carriage, inspection charges, storage etc all copmplete) [ Note : HDPE pipes with specials , val;ves etc. will have to be tested by approved ( as per vendor list) third party inspection agency. Cost of such inspection is to be brone by the agency & test certrificate should be produced before execution of work)] N.B.: Under any circumstances average cushioning over pipe will not be less than 1.00 Mtr.** If under any unavoidable circumstances such cushioning is not possible to maintain then written permission from E.I.C. is to be obtained faliure to which such work will be treated as illegal.110 mm dia to 160mm dia. HDPE pipe
Supplying including cost of installation of D.I. Leak Repair Clamps suitable for permanent repair of leakages in Socket / Spigot joints in C.I. Spun Pipes (as per IS: 1536) and D.I. Pipes (as per IS: 8329). The Clamp consists of two Cast Iron Rings supplied in overlapping semi circular halves which compress Cast Iron Rings supplied in overlapping semi circular halves which compress a specially shaped / contoured rubber gasket made of EPDM quality (IS:5382 Type-4) on the socket face making the Socket / Spigot Joint water right at the operating pressure. The Clamp to be supplied complete with Rubber Gaskets made of EPDM quality and coated Nut Bolts. Fitting and fixing should be in proper position with proper care of main pipe line for leak proof condition.i) 150 mm dia.
ii) 200 mm dia.
iii) 250 mm dia.
iv) 300 mm dia.
v) 350 mm dia.
vi) 400 mm dia.
viii) 500 mm dia.
Inserting C.I./D.I. pipes and or specials in the gap formed by cutting existing C.I./D.I. main. bailing out water from the trench due to normal seepage. if any. including fitting. fixing of ancillary C.I/D.I. specials with supply of Spun Yam all complete to make the joints water tight at required hydraulic pressure as per specification and direction of the Engineer-in-charge. [Cost of C.I/D.I. Specials. cutting of pipes. lead ioints. earth work in excavation road metal. earth work ill filling. shoring. where necessary. shall be paid extra as per relevant items of schedule of rates.] a) 150 mm dia.
b) 200 /250 mm dia.
c) 300 /350 mm dia.
d) 400 / 450 mm dia.
e) 500 mm dia.
Labour for cleaning & Washing CI / DI / AC Pipe line upto 150mm dia. Including scraping internal deposits if necessary as per direction of Engineer-in-Charge.
Detachable joints to AC pipes including supply of rubber gasket, nuts, bolts etc. of best quality to make the joint water tight at required hydraulic pressure all complete as per specification and direction o the Engineer-in- Charge.i) 80 mm dia.
ii)100 mm dia
iii) 150 mm dia.
Labour charges for repairing the bursting/ damage/ leakage of 80 mm. dia to 200 mm dia A.C pipeline with detachable joints including earth work in excavation tracing out the actual position of burst/ leak, cutting pipe of required length, refitting the same with new pipes and old/ new detachable joints after chieseling and shaping the pipe, bailing out water from the trenches and refilling the trenches to its original condition all complete as per direction of EIC.( Extra A.C. pipes and detachble joints with rubber ring, nuts and bolts etc. will be supplied from the scheme store. Surplus and unserviceble pipes and specials will have to be returned to the same store. The rates are inclusive of carriage to site of work and back carriage of materials to and from scheme store as mentioned above.)i) 80 mm to 125 mm dia.
ii) 150 mm to 200 mm dia.
Supplying of UPVC Coupler 6Kg., class – III conforming to IS : 4985 – 2000 with latest revision and amendments ( This item is applicable for maintenance/ repairing work of pipe line only).a)90 mm dia
b)110 mm dia
b)160 mm dia
Labour charges for repairing of UPVC pipe by using UPVC socket and solvent cement including earth work in excavation with dewatering and necessary tracing out the actual position of brusting/ leakage, cutting the pipe to required length in the trenches and replacing the same with newpipe (as per required length) including fitting fixing after roughing the UPVC surface & supplying and applying solvent cement, back filling the trenches with excavated earth upto the same as per direction of E.I.C. all complete (UPVC pipes and specials, solvent cement to be supplied by the Agency). Unserviceable broken withdrawn surplus materials are to be deposited to the Deptt. Store.a)90 mm dia
b)110 mm dia
b)160 mm dia
Cleaning the chokage of AC/DI/CI / UPVC Pipes in the existing line by split bamboo passing through the new pit on the line and cleaning silt, bats or any obstructed materials in the line and cleaning by washed water. (Work to be executed as per prior approval and direction of EIC).
Taking out sluice valve by unscrewing nuts and bolts carefully and stacking the same within a lead of 30M including bailing out water from the Sluice valve chamber due to normal seepage. if any. all complete as per direction of the Engineer-in-Charge. (Dismantling of Sluice Value Chcmber, where necessary. shall be paid extra as per relevant items of Schedule of Rates).I)80-150mm dia
ii)200 mm dia.
iii)250 mm dia.
iv) 300 mm dia.
v) 350 mm dia.
vii) 450 mm dia.
viii) 500 mm dia.
ix)700 mm dia
Repairing damaged lead caulked joint by cutting trench through any type of surface including taking out lead from the joint, recasting and hammering the same with additional lead and lead wool, dewatering of trench refilling the trench and mending good damages of the surface complete in all respect including cost of lead and lead wool. [PWD Schedule of Rates Page 96 Item No. 29 (i) & (ii) for Sl. (a) & Sl. (b) for all District.] ( under ground Work ).a) 100 mm dia b) 150 mm dia
c) 200 mm dia to 350 mm dia.
d) 400 mm dia.
e) 450 mm dia.
f) 700 mm dia.
Renewing lead joint to CI pipes and specials and spun yarn including reusing 50% of old and using 50% new lead of approved quality new span yarn and caulking the same properly including labour charges for dismantling the existing damaged portion complete as per direction of E.I.C. Approved quality lead, spun yarn, fuel and other materials will be supplied by the agency. (Lead if supplied by the department will be recovered @ 145/- per Kg.)a)80 mm dia to 150 mm dia
b)200 mm dia to 250 mm dia
c)300 mm dia to 350 mm dia
d) 400 mm dia with supply of 19.80 kg lead & 750 gram yarn to each
e) 700 mm dia with supply of 22.00 kg lead & 1350 gram yarn to each
Hire charges of moveable type mounted earth excavator having minimum cutter size (1.0 cubic meter) & loader size (2.0 meter length x 0.75m width) for cutting & removal of any kind of soil, spoli etc. including cost of fuel, lubricants & manpower etc. in Water Supply Works. [ This item will be operated on prior permission from the concerned SE/Dy. Chief Engineer]For minimum engagement of 8 hrs. In a day
For beyond 8hrs. of working
Hire charges of moveable crane with fuel & manpower having load handling capacity upto 14MT with the 45 deg. moveable arrangement & the boom length of 40 feets for loading & unloading of various materials / accessories of water supply works.For minimum engagement of 8 hrs. In a day
For beyond 8hrs. of working
Supply of Pig Lead 99.999% purity
Dewatering from the excavated trenches for repairing any type of pipe line including Hire charges of pump/ carriage / Fuel & lubricant/ Operator etc. for big data pipes more than 200 mm dia all complete as per direction of E.I.C.. (This item will be executed as per specification direction of E.I.C.)
Supplying bolts with nuts matching with different dia. C.I. detachable joint as per IS : 8794 -1988 with latest amendment. a) 10 to 25 mm dia.
Supplying including cost of installation of C.I. Mechanical joint Reducer/Enlarger as dimensionally described in IS:13382/2004. Each Reducer consists of One C.I. Body, Two C.I. Follower Glands of different diameter, Two sealing Rubber Gaskets (Conforming to IS:5382/1985 Type- 4) and Zinc coated M.S. Fasteners of adequate numbers. The whole assembly is mechanically and hydraulically tested to provisions as laid down in IS: 13382/2004.Diameter in mm A.500 x 450 MM DIA
B.500 x 400 MM DIA
C.400 x 300 MM DIA
D.300 X 250 MM DIA
E..250 X 200 MM DIA
F.200 X 150 MM DIA
Supplying including cost of installation of C.I. Mechanical joint Tee as dimensionally described in IS:13382/2004. Each Tee consists of One C.I. Body, Two C.I. Follower Glands, Two sealing Rubber Gaskets of EPDM quality (Conforming to IS:5382/1985 Type-4) and Zinc coated M.S. Fasteners. The Branch Flange is drilled as per IS: 1538. The whole assembly is mechanically and hydraulically tested to provisions as laid down in IS: 13382/2004. Diameter in mm a.500 x 500 x 400
Supplying including cost of installation of cast iron mechanical joint Double socket 90° Bend as dimentionally described in IS :13382/2004 for connecting two plain ends of Cl/DI pipes with C.I body and follower gland, zinc coated MS. fasteners and sealing rubber gasket of EPDM quality as per IS: . 13382:2004 complete.a.350 mm dia
b. 300 mm dia
c.250 mm dia
d.200 mm dia
e.150 mm dia
Supplying including cost of installation of cast iron mechanical joint Double socket 45° Bend as dimentionally described in IS :13382/2004 for connecting two plain ends of Cl/DI pipes with C.I body and follower gland, zinc coated MS. fasteners and sealing rubber gasket of EPDM quality as per IS: . 13382:2004 complete.a.350 mm dia
b. 300 mm dia
c.250 mm dia
d.200 mm dia
e.150 mm dia
Supplying including cost of installation of cast iron mechanical joint Double socket 22½° Bend as dimentionally described in IS : 13382/2004 for connecting two plain ends of Cl/DI pipes with C.I body and follower gland, zinc coated MS. fasteners and sealing rubber gasket of EPDM quality as per IS: . 13382:2004 complete.a.350 mm dia
b. 300 mm dia
c.250 mm dia
d.200 mm dia
e.150 mm dia
Cost iron double flanged manually operated sluice valves generally conforming to IS 14846 : 2000, having four faces and spindle nut of gunmetal. inside screw non- rising type quality gunmetal /AISI 410 spindle: seat tested to 10kg/CM² and body tested to 15kg/CM², flanges flat faced and drilled to 1.S.: 1538 : 1993. Painted black all over with asphalt base paint. Valves tested by closed end method.a)80 mm dia
b)100 mm dia
c)150 mm dia
d)200 mm dia
e)250 mm dia
f)300 mm dia
Cost iron double flanged manually operated sluice valves generally conforming to IS 14846 : 2000, having four faces and spindle nut inside screw non- rising spindle type gunmetal/AISI 410 suitable for PN 1.0 rating complete with ball thrust bearing and enclosed gearbox (EN-8 with hardened by nitriding pinions of EN-19), flanges flat faced and drilled to IS.: 1538 : 1993. Valves tested by closed end method.a)350 mm dia
c)450 mm dia
d)500 mm dia
e)700 mm dia
Supplying, fitting and fixing of C.I. Mechanical Compression flexible Collar Couplings suitable for C.I. Spun Pipes (as per IS: 1536) and D. I. Pipes (as per IS: 8329) complete with Sealing Rubber Gasket of EPDM quality (IS:5382/1985 Type - 4), Cast Iron Follower Glands and Mild Steel Nut Bolts (Zinc Coated). The whole assembly should be mechanically and hydraulically tested to the provisions as laid down in IS: 1538. Fitting and fixing should be in proper position with proper care of main pipe line for leak proof condition.A)700 mm dia
Operation of pumping machineries for supply of water by engaging skilled, semi-skilled and unskilled personnel including guarding the installation round the clock as per direction of EIC. (PUMP HOUSE LOCATION (IMPLEMENTED BY M.E.D)-JHARIA,
Routine and periodic maintenance of pump motor, valve actuator tighting of nut bolt of sluice valve, air valve dismantling joint etc including replacement of indicating lamp with holder, replacement of gland packing for pump and sluice valve with proper lubrication of motor bearing etc as per direction of EIC (PUMP HOUSE LOCATION (IMPLEMENTED BY M.E.D)-JHARIA)
Cleaning of pump house ,Sub Station ,Bathroom and its surroundingby engaging sweeper in regular manner as per direction of EIC (PUMP HOUSE LOCATION (IMPLEMENTED BY M.E.D)-JHARIA)
Supervision charges for electrical installation by licensed electricians (As per IE rules 1965 read with latest amendments over head expenditure) including incidental charged as per specification and direction of E.I.C. (PUMP HOUSE LOCATION (IMPLEMENTED BY M.E.D)-JHARIA)
Operation of pumping machineries for supply of water by engaging skilled, semi-skilled and unskilled personnel including guarding the installation round the clock as per direction of EIC. (PUMP HOUSE LOCATION (IMPLEMENTED BY M.E.D)-KESHPAL
Routine and periodic maintenance of pump motor, valve actuator tighting of nut bolt of sluice valve, air valve dismantling joint etc including replacement of indicating lamp with holder, replacement of gland packing for pump and sluice valve with proper lubrication of motor bearing etc as per direction of EIC (PUMP HOUSE LOCATION (IMPLEMENTED BY M.E.D)-KESHPAL
Cleaning of pump house ,Sub Station ,Bathroom and its surroundingby engaging sweeper in regular manner as per direction of EIC (PUMP HOUSE LOCATION (IMPLEMENTED BY M.E.D)-KESHPAL
Supervision charges for electrical installation by licensed electricians (As per IE rules 1965 read with latest amendments over head expenditure) including incidental charged as per specification and direction of E.I.C. (PUMP HOUSE LOCATION (IMPLEMENTED BY M.E.D)-KESHPAL
Operation of pumping machineries for supply of water by engaging skilled, semi-skilled and unskilled personnel including guarding the installation round the clock as per direction of EIC. (PUMP HOUSE LOCATION (IMPLEMENTED BY M.E.D)-S.D.HOSPITAL)
Routine and periodic maintenance ofpanel board,cables,capicitors,transformers, battery with battery charger,CT & PT's earthing system all breakers,tightening nuts & bolts of bus bar,replacement of control fues,indicating lamp with holder etc as per diection of EIC (PUMP HOUSE LOCATION (IMPLEMENTED BY M.E.D)-S.D.HOSPITAL)
Cleaning of pump house ,Sub Station ,Bathroom and its surroundingby engaging sweeper in regular manner as per direction of EIC (PUMP HOUSE LOCATION (IMPLEMENTED BY M.E.D)-S.D.HOSPITAL)
Supervision charges for electrical installation by licensed electricians (As per IE rules 1965 read with latest amendments over head expenditure) including incidental charged as per specification and direction of E.I.C. (PUMP HOUSE LOCATION (IMPLEMENTED BY M.E.D)-S.D.HOSPITAL)
Operation of pumping machineries for supply of water by engaging skilled, semi-skilled and unskilled personnel including guarding the installation round the clock as per direction of EIC. (PUMP HOUSE LOCATION (IMPLEMENTED BY M.E.D)-MALANCHA)
Routine and periodic maintenance of pump motor, valve actuator tighting of nut bolt of sluice valve, air valve dismantling joint etc including replacement of indicating lamp with holder, replacement of gland packing for pump and sluice valve with proper lubrication of motor bearing etc as per direction of EIC (PUMP HOUSE LOCATION (IMPLEMENTED BY M.E.D)-MALANCHA)
Cleaning of pump house ,Sub Station ,Bathroom and its surroundingby engaging sweeper in regular manner as per direction of EIC (PUMP HOUSE LOCATION (IMPLEMENTED BY M.E.D)-MALANCHA)
Supervision charges for electrical installation by licensed electricians (As per IE rules 1965 read with latest amendments over head expenditure) including incidental charged as per specification and direction of E.I.C. (PUMP HOUSE LOCATION (IMPLEMENTED BY M.E.D)-MALANCHA)
Operation of pumping machineries for supply of water by engaging skilled, semi-skilled and unskilled personnel including guarding the installation round the clock as per direction of EIC. (PUMP HOUSE LOCATION (IMPLEMENTED BY M.E.D)-TALBAGICHA
Routine and periodic maintenance of pump motor, valve actuator tighting of nut bolt of sluice valve, air valve dismantling joint etc including replacement of indicating lamp with holder, replacement of gland packing for pump and sluice valve with proper lubrication of motor bearing etc as per direction of EIC (PUMP HOUSE LOCATION (IMPLEMENTED BY M.E.D)-TALBAGICHA
Cleaning of pump house ,Sub Station ,Bathroom and its surroundingby engaging sweeper in regular manner as per direction of EIC (PUMP HOUSE LOCATION (IMPLEMENTED BY M.E.D)-TALBAGICHA
Supervision charges for electrical installation by licensed electricians (As per IE rules 1965 read with latest amendments over head expenditure) including incidental charged as per specification and direction of E.I.C. (PUMP HOUSE LOCATION (IMPLEMENTED BY M.E.D)-TALBAGICHA
Operation of pumping machineries for supply of water by engaging skilled, semi-skilled and unskilled personnel including guarding the installation round the clock as per direction of EIC. (PUMP HOUSE LOCATION (IMPLEMENTED BY P.H.E)-JHARIA,
Routine and periodic maintenance of pump motor, valve actuator tighting of nut bolt of sluice valve, air valve dismantling joint etc including replacement of indicating lamp with holder, replacement of gland packing for pump and sluice valve with proper lubrication of motor bearing etc as per direction of EIC (PUMP HOUSE LOCATION (IMPLEMENTED BY P.H.E)-JHARIA)
Cleaning of pump house ,Sub Station ,Bathroom and its surroundingby engaging sweeper in regular manner as per direction of EIC (PUMP HOUSE LOCATION (IMPLEMENTED BY P.H.E)-JHARIA)
Supervision charges for electrical installation by licensed electricians (As per IE rules 1965 read with latest amendments over head expenditure) including incidental charged as per specification and direction of E.I.C. (PUMP HOUSE LOCATION (IMPLEMENTED BY P.H.E)-JHARIA)
Operation of pumping machineries for supply of water by engaging skilled, semi-skilled and unskilled personnel including guarding the installation round the clock as per direction of EIC. (PUMP HOUSE LOCATION (IMPLEMENTED BY P.H.E)-KESHPAL
Routine and periodic maintenance of pump motor, valve actuator tighting of nut bolt of sluice valve, air valve dismantling joint etc including replacement of indicating lamp with holder, replacement of gland packing for pump and sluice valve with proper lubrication of motor bearing etc as per direction of EIC (PUMP HOUSE LOCATION (IMPLEMENTED BY P.H.E)-KESHPAL
Cleaning of pump house ,Sub Station ,Bathroom and its surroundingby engaging sweeper in regular manner as per direction of EIC (PUMP HOUSE LOCATION (IMPLEMENTED BY P.H.E)-KESHPAL
Supervision charges for electrical installation by licensed electricians (As per IE rules 1965 read with latest amendments over head expenditure) including incidental charged as per specification and direction of E.I.C. (PUMP HOUSE LOCATION (IMPLEMENTED BYP.H.E)-KESHPAL
Operation of pumping machineries for supply of water by engaging skilled, semi-skilled and unskilled personnel including guarding the installation round the clock as per direction of EIC. (PUMP HOUSE LOCATION (IMPLEMENTED BY P.H.E)-S.D.HOSPITAL)
Routine and periodic maintenance ofpanel board,cables,capicitors,transformers, battery with battery charger,CT & PT's earthing system all breakers,tightening nuts & bolts of bus bar,replacement of control fues,indicating lamp with holder etc as per diection of EIC (PUMP HOUSE LOCATION (IMPLEMENTED BY P.H.E)-S.D.HOSPITAL)
Cleaning of pump house ,Sub Station ,Bathroom and its surroundingby engaging sweeper in regular manner as per direction of EIC (PUMP HOUSE LOCATION (IMPLEMENTED BY P.H.E)-S.D.HOSPITAL)
Supervision charges for electrical installation by licensed electricians (As per IE rules 1965 read with latest amendments over head expenditure) including incidental charged as per specification and direction of E.I.C. (PUMP HOUSE LOCATION (IMPLEMENTED BY P.H.E)-S.D.HOSPITAL)
Operation of pumping machineries for supply of water by engaging skilled, semi-skilled and unskilled personnel including guarding the installation round the clock as per direction of EIC. (PUMP HOUSE LOCATION (IMPLEMENTED BY P.H.E)-MALANCHA)
Routine and periodic maintenance of pump motor, valve actuator tighting of nut bolt of sluice valve, air valve dismantling joint etc including replacement of indicating lamp with holder, replacement of gland packing for pump and sluice valve with proper lubrication of motor bearing etc as per direction of EIC (PUMP HOUSE LOCATION (IMPLEMENTED BY P.H.E)-MALANCHA)
Cleaning of pump house ,Sub Station ,Bathroom and its surroundingby engaging sweeper in regular manner as per direction of EIC (PUMP HOUSE LOCATION (IMPLEMENTED BY P.H.E)-MALANCHA)
Supervision charges for electrical installation by licensed electricians (As per IE rules 1965 read with latest amendments over head expenditure) including incidental charged as per specification and direction of E.I.C. (PUMP HOUSE LOCATION (IMPLEMENTED BY P.H.E)-MALANCHA)
ARUP KUMAR DEY
CONCORD ENGINEERING
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .