| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.4 LAdmitted-Finance | -13.51% | ₹3.4 L | L1 | Admitted-Finance |
| 2 | L2₹3.5 LAdmitted-Finance SIYAI RAMSAR | -11.99% | ₹3.5 L | L2 | Admitted-Finance |
| 3 | L3₹3.5 LAdmitted-Finance SCO 78 SECTOR 2 MARKET ROHTAK 124001 HARYANA | ROHTAK | ROHTAK | HARYANA | 124001 | -11.11% | ₹3.5 L | L3 | Admitted-Finance |
| 4 | L4₹3.5 LAdmitted-Finance | -9.89% | ₹3.5 L | L4 | Admitted-Finance |
| 5 | L5₹3.7 LAdmitted-Finance | -5.10% | ₹3.7 L | L5 | Admitted-Finance |
Tender Value
₹3.9 L
EMD Value
₹7,840
Closing Date
9 Apr 2026, 6:00 pmClosed
DPC
SAMAGRA SHIKSHA SIKAR
CONSTRUCTION WORK AT GOVT. SENIOR SECONDARY SCHOOL RORU CHHOTI BLOCK- LAXMANGARH DIST-SIKAR
2026_RCSCE_546827_23
NIT-01 (CIVIL) 2025-26 SMSA SIKAR
Open Tender
Civil Works
180 days
RORU CHHOTI BLOCK- LAXMANGARH DIST-SIKAR
REGISTRED FIRM
2 documents required · 2 mandatory
₹1,000
ADPC, MD
₹7,840
23 Apr 2026
1 Apr 2026
10 Apr 2026
1 Apr 2026
9 Apr 2026
1 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
Part-A : Civil Work Based on BSR 2022, PWD Rajasthan | - | - | - | - | |
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer-in-charge. 1: 3: 6 or richer mix. | - | Cum | - | - | |
Grading roof for water proofing treatment with water proffing compound Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | - | Cum | - | - | |
Brick work with F.P.S. bricks of class designation 75 in superstructure above plinth level upto floor V level in all shapes and sizes in : Cement mortar 1 : 6 (1 cement : 6 coarse sand) | - | Cum | - | - | |
Repairs to plaster of thickness 12mm to 20mm in patches of area 2.5 sq. metres and under including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete including disposal of rubbish to the dumping ground within 50 m lead With cement mortar 1 :4 ( 1 cement : 4 coarse sand) | - | Sqm | - | - | |
Providing & laying broken glazed titles on roof ( broken glazed tiles not less than 9 Kg/Sqm) on top of hot bitumen @ 1.7 Kg/Sqm. (1.40 Kg of VG-40 (30/40 )grade and 0.30 Kg/Sqm. Of VG-10 (80/100) grade) and joints filled with cement mortar 1 :2 (1 cement:2 marble dust mixed with water proofing compund all complete as per direction of Engineer-in-charge. | - | Sqm | - | - | |
Providing gola 75x75 mm in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 stone aggregate 10mm and down gauge) including finishing with cement mortar 1:3 (1 cement : 3 fine sand) as per standard design : | - | Mtr | - | - | |
Glazed Window : Providing and fixing steel glazed doors windows and ventilator shutters of standard rolled steel section (IS 1038-1983) joints mitred and welded with steel lugs 13x3mm, 10cm. long embedded in cement concrete block 15x10x10cm. of 1:3:6 (1cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size) or with wooden plugs and screws or rawl plugs and screws with fixing clips or with bolts and nuts as required including providing and fixing of plain glass panes 4mm thick with cooper glazing clips and special metal sash putty of approved make or metal beading with screws complete including priming coat of approval steel primer, excluding the cost of metal beading and other fitting except necessary hinges of pivots steel handles peg stay etc. as required : Partly fixed and partly openable [ fixed area not to exceed 33%] | - | Sqm | - | - | |
INTERNAL FINISHING:-Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade including all scaffolding:New work (two or more coats) over and including scrapping and priming coat with cement primer. | - | Sqm | - | - | |
EXTERIOR FINISHING:-Finishing walls with Acrylic Smooth exterior paint of required shade including all scaffolding.
New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including base coat of water proofing cement paint applied @ 2.20 kg/ 10 sqm ). | - | Sqm | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 9.28 MB
Tendernotice_2.pdf
PDF • 17.88 MB
BOQ_979402.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid