Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13.0 LAdmitted-Finance | -0.25% | ₹13.0 L | L1 | Admitted-Finance |
| 2 | L2₹13.0 LAdmitted-Finance | +0.00% | ₹13.0 L | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | - | Rejected-Technical as recommended by committee member |
Tender Value
₹13.0 L
EMD Value
₹27,000
Closing Date
14 Apr 2026, 12:00 pmClosed
EE REDBASTI
O/O EE REDBASTI
Vikas Khand Kudraha ke P.S. Pasda mein MDM shade ka nirman karya
2026_REDUP_1134783_5
2688/RED/2025-26 Dt. 17.02.2026
Open Tender
Civil Works
90 days
works
as per sbd
2 documents required · 2 mandatory
₹944
₹27,000
Yes
12 May 2026
9 Apr 2026
15 Apr 2026
9 Apr 2026
14 Apr 2026
9 Apr 2026
9 Apr 2026 - 14 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
Excavation in Foundation in ordinary soil (Loamclay or sand) including removal and disposal of surplus earth as directed by the E/I up to a distance of 30m. from the foundation trenches (SI. No.251) | - | Cum | - | - | |
Concrete with 4cm gauge brick ballast, sand of 1.25 F.M. and cement in proportion 1:5:10 in foundations and under floors including supply of all materials labour and tools and plants etc. required for proper complation of the work.si no 274 | - | Cum | - | - | |
RCC raft foundation and footing with 4 cm gauge stone ballast in 1:1.5:3 including labour T&P complete as per SI NO 287(A) | - | Cum | - | - | |
RCC 1:1.5:3 in column with 20 mm stone grit including labour T&P complete as per SI NO 288(A) | - | Cum | - | - | |
Brick work in 1:4 cement and C/ sand of in foundation and plinth including supply of all material, labour tools and plants. etc. required for proper completion of work As per S.I. No. 305 B | - | Cum | - | - | |
Earthwork in Cutting or inembankment in ordinary soil (Loamclay or sand) including the ramming and dressing the surface to required levels slopees as directed by the E/I (SI No. 253A) | - | Cum | - | - | |
Brick work in 1:3 cement and Coarse sand of in superstructure including supply of all material, labour tools and plants. etc. required for proper completion of work As per S.I. No.307. 310a | - | Cum | - | - | |
RCC work in 1:2:4 with cement, coarse sand and 20 mm stone grit of banch including labour T&P complete as per SI NO 283 | - | Cum | - | - | |
Mild steel or iron in plain work such as in reinforced concrete work to required shape as necessary including dending for proper completion of the work and including supply of steel its wastage. Bend books and authorized overlapping shall be measured. SI No. 504 | - | qtl | - | - | |
Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. DSR 10.16.1 | - | kg | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
Tendernotice_2.pdf
PDF • 0.34 MB
BOQ_2118493.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid