Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.8 LAccepted-AOC | ₹6.8 L Quoted ₹8.3 L | L1 | Accepted-AOC Accepted as bidder found L1 |
| 2 | L2₹9.4 LRejected-AOC | ₹9.4 L | L2 | Rejected-AOC Rejected as bidder found L2 |
| Sl No | Description | Qty | Unit | B K Contractor L1 | Krishna Nand Sharma L2 |
|---|---|---|---|---|---|
| 1.00 | Excavation in foundations, trenches etc. in earth work,lift uoto 1.50 metres stacking the excavated soil not more than 3 metres clear from the edge of the excavation and then returning the stacked soil in 15cm. Layers, when required in to plinths sides of foundations etc., consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed with in lead of 20 metres. | 457.17 | Cum | 930 ₹4.3 L | 950 ₹4.3 L |
| 2.00 | Cutting in earth work in all kinds of soil such as pick work, jumper work, blasting work and chiselling work etc. and disposal of excavated earth as directed within all leads and lifts. | 67.5 | Cum | 520 ₹35,100 | 550 ₹37,125 |
| 3.00 | Prov. and laying cement concrete 1:4:8(1cement: 4sand: 8 graded stone agg. 40mm nominal size) and curing complete excluding cost of form work i/c all leads and lifts. a) Foundation and plinth. | 5.88 | Cum | 9,900 ₹58,212 | 10,000 ₹58,800 |
| 4.00 | Steel work welded in built up sections, trusses and framed work including cutting hoisting, fixing in position and applying a priming coat of red lead paintIn beams, joists channels, angles, tee, flats with connecting plates or angle cleats as in main and cross beams, hip and jack rafters, purlins connected to common rafters and the like. Vertical Post | 9.52 | Qtl | 16,600 ₹1.6 L | 18,000 ₹1.7 L |
| 5.00 | 1.80metre high fencing (as per approved design) 2.50metre RCC Posts 3.00 metres centre to centre and RCC struts with 9 horizental lines and 2 diagonals of galvanised steel bar bed wire (IS:278-1962 Type1) weighting 9.38Kg.per 100 metres (minimum) strained and fixed to posts by typing to 6mm galvanised steel bar niles/clips with G.I. binding wire (cost of R.C.C struts and straining bolts shall be paid for seperately). | 116 | Rmt | 1,300 ₹1.5 L | 2,000 ₹2.3 L |
| 6.00 | Painting two coats (excluding priming coat) on new wood and wood based surfaces,with enamel paint to give an even shade including cleaningthe surface of dirt ,dust and other foreign matters sand papering and stopping with enamel paint other than white | 28.19 | Sqmt | 200 ₹5,638 | 250 ₹7,047.50 |
Tender Value
₹7.5 L
EMD Value
₹15,000
Closing Date
30 Dec 2025, 11:00 amClosed
Executive Engineer Jal Shakti Division Matiana
O/o Executive Engineer Jal Shakti Division Matiana
Construction of pond for disposal of sewerage treated water and P F of Barbed wire fencing around the pond near village Sharyana
2025_HPIPH_124072_1
JSV-Matiana-Tender-9296-9346 Dated-20.12.2025-5
Open Tender
Civil Works - Others
270 days
Theog
Please refer Tender documents.
5 documents required · 5 mandatory
₹500
₹15,000
15 Mar 2026
20 Dec 2025
30 Dec 2025
20 Dec 2025
30 Dec 2025
20 Dec 2025
Amount
Excavation in foundations, trenches etc. in earth work,lift uoto 1.50 metres stacking the excavated soil not more than 3 metres clear from the edge of the excavation and then returning the stacked soil in 15cm. Layers, when required in to plinths sides of foundations etc., consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed with in lead of 20 metres.
Cutting in earth work in all kinds of soil such as pick work, jumper work, blasting work and chiselling work etc. and disposal of excavated earth as directed within all leads and lifts.
Prov. and laying cement concrete 1:4:8(1cement: 4sand: 8 graded stone agg. 40mm nominal size) and curing complete excluding cost of form work i/c all leads and lifts. a) Foundation and plinth.
Steel work welded in built up sections, trusses and framed work including cutting hoisting, fixing in position and applying a priming coat of red lead paintIn beams, joists channels, angles, tee, flats with connecting plates or angle cleats as in main and cross beams, hip and jack rafters, purlins connected to common rafters and the like. Vertical Post
1.80metre high fencing (as per approved design) 2.50metre RCC Posts 3.00 metres centre to centre and RCC struts with 9 horizental lines and 2 diagonals of galvanised steel bar bed wire (IS:278-1962 Type1) weighting 9.38Kg.per 100 metres (minimum) strained and fixed to posts by typing to 6mm galvanised steel bar niles/clips with G.I. binding wire (cost of R.C.C struts and straining bolts shall be paid for seperately).
Painting two coats (excluding priming coat) on new wood and wood based surfaces,with enamel paint to give an even shade including cleaningthe surface of dirt ,dust and other foreign matters sand papering and stopping with enamel paint other than white
Krishna Nand Sharma (BID ID -602781)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.73 MB
Form6.pdf
Tender Documents • 0.16 MB
form8.pdf
Tender Documents • 1.41 MB
Termsandconditions.pdf
Tender Documents • 0.38 MB
BOQ_182334.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid