Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9.2 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹9.9 L+₹70,617.42 (7.68%)Admitted-Finance | L2 | Admitted-Finance |
Tender Value
₹12.8 L
EMD Value
₹25,632
Closing Date
5 Oct 2026, 3:00 pmClosed
EE,RPD-2,DDA
EE,RPD-2,DDA
Deploying surveyor along with necessary equipment and helper i/c providing and fixing Boundary Stones on as and when required basis.
2026_DDA_927747_1
46/EE/RPD-2/DDA/2026-27
Open Tender
Civil Works
Works
180 days
ROHINI
Please refer Tender documents.
13 documents required · 13 mandatory
₹0
₹25,632
9 Oct 2026
25 Sept 2026
6 Oct 2026
25 Sept 2026
5 Oct 2026
25 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing surveyor equipped with Digital Total Station Survey instruments with other allied instruments and providing helper
equipped with necessary tools such as axe, phawrah, measuring tape, rope etc. for assisting the surveyor on hire charges basis for
conducting physical survey of land with respect to nearest revenue reference points i/c transportation, maintenance & operation of machine all complete as per direction of Engineer-in-Charge. Shajra superimposition onsurve y plan/demarcation plan showing allprominent and permanent ground features (like building, trees, roads, electric poles, Telephone
HT lines, sewerage, water, manhole etc.) may also be required. The surveyor must be proficient in using/operating different drawing software such as AUTOCAD.
The item is inclusive of providing colour print
of survey plan/demarcation plan bearing all
necessary legends on A-2 size paper duly
signed by the surveyor and a soft copy of the
same in desired format in pen drive/CD along
with the software used for preparation of
survey plan/demarcation plan. The
survey/demarcation plan may be required to be
produced before any court of law.
The surveyor and helper may be required to be
deployed on short notice of 24 hours (1 shift =
8 hours).
NOTE: Rs. 5000/- will be imposed as penalty for each default per day. | 45 | Day | 20,000 | ₹9,00,000 |
| 2 | Providing and fixing 15 cm x 15 cm x 100 cm boundary stones of precast cement concrete M25 including finishing top. (cost of excavation refilling and concreting to be paid separately). | 400 | Each | 322.8 | ₹1,29,120 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering – All work up to plinth level: 1:3:6 (1 cement :3 coarse sand: 6 graded stone aggregate 40 mm nominal size) | 33 | Cum | 7,178.75 | ₹2,36,898.75 |
| 4 | Excavating holes up-to 0.10 cum, including getting out the excavated soil, then returning the soil as required in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming watering etc., disposing of surplus excavated soil as directed with in a lead of 50 m and lift upto 1.5 m. All kind of soil. | 400 | Each | 27.5 | ₹11,000 |
| 5 | Total= 12,77,018.75 | - | - | - | - |
| 6 | Total after GST Correction factor @ 0.973 on items-2, 3 & 4= 12,66,839.24 | 1 | RS | 10,179.51 | ₹10,179.51 |
| 7 | Add Cost index @4.03% on items-2, 3 & 4= 14,783.62 | 1 | RS | 14,783.62 | ₹14,783.62 |
| 8 | Total= 12,81,622.86 | - | - | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.20 MB
BOQ_974946.xls
BOQ • 0.28 MB
NIT46.pdf
Tender Documents • 2.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .