Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹82.9 LAccepted-AOC WARD NO 04 NEAR LIC PARASIA PARASIA CHHINDWARA MADHYA PRADESH 480441 | CHHINDWARA | MADHYA PRADESH | 480441 | L1 | Accepted-AOC Lowest Rate | |
| 2 | L2₹76.5 L+₹6.3 L (8.93%)Rejected-Finance WARD NO 13 BANDHA MOHALLA PARASIA PARASIA CHHINDWARA MADHYA PRADESH 480441 | CHHINDWARA | MADHYA PRADESH | 480441 | L2 | Rejected-Finance Higher Rate | |
| 3 | Rejected-Technical | - | Rejected-Technical Submission not as per NIT |
Tender Value
₹84.3 L
EMD Value
₹1.1 L
Closing Date
25 Feb 2023, 5:00 pmClosed
Staff Officer (Mining), Pench Area, WCL
Office of the Area General Manager Western Coalfields Limited Pench Area Parasia District Chhindwara
Transportation of support material from surface to Underground / Underground to Underground at Naheriya Underground Mine of Pench Area
2023_WCL_270586_1
pe3350-min-e0060-2022-23
Open Tender
Miscellaneous Works
Item Rate
365 days
Naheriya Underground Mine of Pench Area
Please refer Tender documents.
7 documents required · 7 mandatory
₹1.1 L
29 Mar 2023
9 Feb 2023
27 Feb 2023
10 Feb 2023
25 Feb 2023
10 Feb 2023
10 Feb 2023 - 17 Feb 2023
Amount
Transportation of roof bolt rod 1.50M to 2.40M long 22 mm dia with nut, bearing plate 15cm x 15cm complete assembly from surface to UG or UG to UG as per direction of shift incharge.
Transportation of Cement Capsule Bags / Resin Capsule from surface to UG or UG to UG as per direction of shift incharge. 01 Bag contain 60 Nos. cement capsules (size of capsules 400mm long 22mm)
Transportation of support material i.e. W Strap 1.50M to 4.00M long from surface to UG or UG to UG as per direction of shift incharge.
Transportation of wooden sleeper from surface to UG or UG to UG as per direction of shift incharge.
Transportation of steel chock loading from surface to UG or UG to UG as per direction of shift incharge.
Transportation of steel / wooden props loading from surface to UG or UG to UG as per direction of shift incharge.
Transportation of stitching wire rope from surface to UG or UG to UG as per direction of shift incharge.
Loading into tub at Incline mouth and unloading in underground of Mud Pallets / Sand Capsules
Total impact of GST for the purpose of CTC
DIAMOND CONSTRUCTION
DIAMOND CONSTRUCTION
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .