Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.6 LAdmitted-Finance 159B M G ROAD HARIDEVPUR KOLKATA WEST BENGAL 700082 UDYAM WB 10 0018308 | KOLKATA | WEST BENGAL | 700082 | -0.40% | ₹1.6 L | L1 | Admitted-Finance |
| 2 | L2₹1.7 L+₹3,103.09 (1.91%)Admitted-Finance 2129 DR SARADA PRASAD GHOSH STREET KOLKATA WB 700127 | 24 PARAGANAS NORTH | WEST BENGAL | 700127 | +1.50% | ₹1.7 L+₹3,103.09 (1.91%) | L2 | Admitted-Finance |
| 3 | L3₹1.7 L+₹4,736.29 (2.91%)Admitted-Finance 61 9 JORABAGAN ROAD KOLKATA 700047 | KOLKATA | WEST BENGAL | 700047 | +2.50% | ₹1.7 L+₹4,736.29 (2.91%) | L3 | Admitted-Finance |
Tender Value
₹1.6 L
EMD Value
₹3,300
Closing Date
15 Jun 2026, 2:00 pmClosed
EXECUTIVE ENGINEER (W/S) , GRWW
OFFICE OF THE EXECUTIVE ENGINEER (WATER SUPPLY) GARDEN REACH WATER WORKS, BIDHANGARH, KOL-66
REPAIRING OF LEAKY SPOTS ON 150 MM DIA AND 100 MM DIA FW PIPELINE ADJACENT TO TARATALA AUTO-STAND ON TARATALA ROAD WITH OTHER ALLIED WORKS.
2026_KMC_1024855_1
EEWS/KMC/GRWW/26-27/16
Open Tender
MECHANICAL
Percentage
10 days
ON TARATALA ROAD
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹3,300
23 Jun 2026
21 May 2026
17 Jun 2026
21 May 2026
15 Jun 2026
21 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and
ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm | - | CUBIC METER PERCENT | 119.27 | - |
| 2 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete (b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring | 0.41 | CUBIC METER PERCENT | 192.38 | ₹78.49 |
| 3 | Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete as
per direction of the Engineer-in charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge).(a) Depth upto 1.5 m. | 43.5 | SQUARE METER | 386 | ₹16,791 |
| 4 | Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete as
per direction of the Engineer-in charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge)(b) For additional depth beyond 1.5 m. and upto 3.00 m | 0.8 | SQUARE METER | 439 | ₹351.2 |
| 5 | Hire and labour charges for 100 mm dia bamboo railing on 150 mm dia Jhau/Eucalyptus or other approved timber posts each 2.0 m in length, tied 2 number post strongly with coir ropes in the fashion of a scissor with a spacing of 1.8 m over pacca road without damaging the surface and tying strongly 3 (three) rows of bamboo railing on each leg and 1 (one) railing connecting all the pivot junctions including cost of loading unloading, stacking & carriage of all materials and labour complete, and maintaining barricading for a period beyond 5 (five) days after the reported & recorded time of completion of the entire work to the satisfaction of Engineer-in- Charge. (Note: This work should not be executed without specific permission of Superintending Engineer). (100 mm. dia bamboo railing & 150mm. dia Jhau/Eucalyptus/other approved timber posts @ 1.80m apart). (ii) Railing 3 row on each leg and 1 at pivot point. | 33 | METER | 178 | ₹5,874 |
| 6 | Supplying, fitting and fixing in position G.I. pipes of TATA make for underground works with all necessary accessories,specials viz.socket, bend, tee, union, cross, elbow, nipple, short piece etc.including cost of all materials,jointing materials ,cutting pipes,making threads,cutting trenches upto 1.5 metre below surface in all sorts of soil and refilling the same as directed with two coats of painting on G.I. pipes and specials with bituminous paint complete in all respect. (Payment will be made on the centre line measurement of the total pipe line including all specials No separate payment will be made for accessories, specials.Payment for painting will be made seperately) (ix) 100 mm dia. medium quality | 3 | METER | 1,006 | ₹3,018 |
| 7 | Labour for jointing and lowering G.I. or E.R.W. M.S. pipes including strainer within the tube well bore vertically with necessary sockets, special fittings and welding as required including cost of all jointing materials, hire charges of tools and plants, cutting pipes to required sizes, making threads, welding pieces
together etc. as necessary as per direction of the Engineer-in-charge. (i)
Upto 100 mm dia. pipe | 3 | METER | 59 | ₹177 |
| 8 | Supplying, fitting and fixing Peet's valve fullway gunmetal standard pattern best quality of approved brand bearing I.S.I. marking with fittings (tested to 21 kg per sq. cm.). (i) 100 mm dia | 1 | EACH | 10,910 | ₹10,910 |
| 9 | Labour for fitting and fixing G.I. pipes for under ground work including cost of
jointing materials, cutting pipes,making threads etc. complete in all respect including cutting trenches upto 1.5 metre below surface in all sorts of soil and refilling the same as directed with two coats of painting to G.I. pipes and specials with bituminous paint. (Payment will be made on the centre line measurement of the total pipeline including specials. Payment of painting to be paid seperately.) (ix) 100 mm dia. | 3 | METER | 113 | ₹339 |
| 10 | E. R. W. MS BLACK PIPE 8.15 Sypply of E.R.W.M.S. (Electrical Resistant Welded M.S.) black pipe of ISI Mark as per relevent IS Specification ( heavy quality ) having wall thickness not less than 5 mm. [N.B.: The rates for supply of TATA Make pipe will be arrived at by adding 20% of the corresponding rates ] Diameter in mm (Internal)150 | - | METER | 1,268 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.31 MB
BOQ_2518528.xls
BOQ • 0.36 MB
OIDDETAILS.pdf
Additional Documents • 0.68 MB
tbid.pdf
Tender Documents • 0.55 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .