| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.8 CrAccepted-AOC | L1 | Accepted-AOC Award of Contract to the L1 Bidder | |
| 2 | L2₹40.5 Cr+₹1.7 Cr (4.27%)Rejected-Finance 5 217 D1 TEACHERS COLONY MOHANUR ROAD NAMAKKAL 637001 | NAMAKKAL | TAMIL NADU | 637001 | L2 | Rejected-Finance As per Financial Bid | |
| 3 | L3₹41.7 Cr+₹2.8 Cr (7.32%)Rejected-Finance | L3 | Rejected-Finance As per Financial Bid | |
| 4 | L4₹45.2 Cr+₹6.4 Cr (16.5%)Rejected-Finance NO 1 8 SENTHILAGAM AINDHUPANAI KADACHANALLUR ERODE 638 008 | NAMAKKAL | TAMIL NADU | 638008 | L4 | Rejected-Finance As per Financial Bid | |
| 5 | L5₹45.9 Cr+₹7.1 Cr (18.2%)Rejected-Finance P AND C TOWERS 2ND FLOOR 140 PERUNDURAI ROAD ERODE 638 011 | ERODE | TAMIL NADU | 638011 | L5 | Rejected-Finance As per Financial Bid |
| Sl No | Description | Qty | Unit | SSS HI TECH CONSTRUCTIONS PRIVATE LIMITED L3 | P AND C PROJECTS PRIVATE LIMITED L5 | PSK ENGINEERING CONSTRUCTION AND CO L1 | ABIRAMI ENGINEERING CONSTRUCTION AND CO L2 | PRIYA ENGINEERING PROJECTS PRIVATE LIMITED L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00CIVIL WORKS | ||||||||
| 1.01Earth work Excavation | ||||||||
| 1.02 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.
Excavated should not be used for back filling / Plinth Filling.
Upto 0 to 2.00m Footing Depth. | 2,901.05 | Cum | 360 ₹12,32,366.04 | 268 ₹9,17,428.05 | 194 ₹6,64,108.37 Lowest | 230 ₹7,87,344.97 | 250 ₹8,55,809.75 |
| 1.03 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specifications and as directed by the departmental officers.
Excavated should not be used for back filling / Plinth Filling.
for Footing Depth 2.00m to 3.0m | 489.9 | Cum | 450 ₹2,60,136.9 | 321 ₹1,85,564.32 | 233 ₹1,34,693.11 Lowest | 240 ₹1,38,739.68 | 275 ₹1,58,972.55 |
| 1.04 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specifications and as directed by the departmental officers.
Excavated should not be used for back filling / Plinth Filling.
for Footing Depth 3.00m to 4.00m | 5 | Cum | 540 ₹3,186 | 348 ₹2,053.2 | 291 ₹1,716.9 | 250 ₹1,475 Lowest | 280 ₹1,652 |
| 1.05 | Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.
Upto 2.40m Depth | 1,095 | Cum | 360 ₹4,65,156 | 268 ₹3,46,282.8 | 155 ₹2,00,275.5 Lowest | 180 ₹2,32,578 | 200 ₹2,58,420 |
| 1.06 | Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.
2.40m to 3.40m Depth | 239 | Cum | 450 ₹1,26,909 | 294 ₹82,913.88 | 175 ₹49,353.5 Lowest | 200 ₹56,404 | 220 ₹62,044.4 |
| 1.07 | Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.
3.40m to 4.40m Depth | 168 | Cum | 540 ₹1,07,049.6 | 375 ₹74,340 | 233 ₹46,189.92 | 220 ₹43,612.8 Lowest | 240 ₹47,577.6 |
| 1.08 | Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.
4.40m to 5.40m Depth | 12 | Cum | 630 ₹8,920.8 | 428 ₹6,060.48 | 291 ₹4,120.56 | 250 ₹3,540 Lowest | 270 ₹3,823.2 |
| 1.09 | Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15cm thick well rammed with surface vibrator, watered and consolidated etc., complete complying with standard specification and as directed by the departmental officers. | 4,581.45 | Cum | 180 ₹9,73,099.98 | 161 ₹8,70,383.87 | 132 ₹7,13,606.65 Lowest | 150 ₹8,10,916.65 | 160 ₹8,64,977.76 |
Tender Value
Refer Docs
EMD Value
₹19 L
Closing Date
29 Jan 2026, 3:00 pmClosed
The Managing Director
TIDEL Neo Limited No.4, Rajiv Gandhi Salai, Taramani, Chennai 600113
E Tender for Construction of IT Office Building, Ground floor plus 3 Floors plus Terrace, including Civil Construction, HVAC, Electrical HTLT, Elevator, IBMS, Fire Protection, Plumbing, Structural Facade, Landscaping, STP, WTP at Kanniyakumari
2025_NEO_638115_1
TIDEL Neo/2025-2026/2C
Open Tender
Construction Works
Works
365 days
Kanniyakumari
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹19 L
TIDEL Neo Limited
17 Feb 2026
1 Jan 2026
30 Jan 2026
1 Jan 2026
29 Jan 2026
24 Jan 2026
1 Jan 2026 - 9 Jan 2026
9 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL WORKS | - | - | - | - |
| - | Earth work Excavation | - | - | - | - |
| - | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.
Excavated should not be used for back filling / Plinth Filling.
Upto 0 to 2.00m Footing Depth. | 2,901.05 | Cum | - | - |
| - | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specifications and as directed by the departmental officers.
Excavated should not be used for back filling / Plinth Filling.
for Footing Depth 2.00m to 3.0m | 489.9 | Cum | - | - |
| - | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specifications and as directed by the departmental officers.
Excavated should not be used for back filling / Plinth Filling.
for Footing Depth 3.00m to 4.00m | 5 | Cum | - | - |
| - | Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.
Upto 2.40m Depth | 1,095 | Cum | - | - |
| - | Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.
2.40m to 3.40m Depth | 239 | Cum | - | - |
| - | Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.
3.40m to 4.40m Depth | 168 | Cum | - | - |
| - | Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.
4.40m to 5.40m Depth | 12 | Cum | - | - |
| - | Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15cm thick well rammed with surface vibrator, watered and consolidated etc., complete complying with standard specification and as directed by the departmental officers. | 4,581.45 | Cum | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.31 MB
Volume1PQKumari.pdf
Tender Documents • 1.22 MB
Volume2TenderConditionsKumari.pdf
Tender Documents • 2.81 MB
Volume3TechnicalspecsTechnicalSpecsKumari.pdf
Tender Documents • 6.31 MB
BOQ_763736.xls
BOQ • 1.10 MB
Volume5AArchictecturalDrawingsKumari.pdf
Tender Documents • 13.97 MB
Volume5BStructureDrawingsKumari.pdf
Tender Documents • 38.00 MB
Volume5CMEPdrawingsKumari.pdf
Tender Documents • 35.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .