| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹11.9 CrAccepted-AOC | ₹11.9 Cr | L-1 | Accepted-AOC As Recommended by TC and duly approved |
| 2 | L-2₹12.3 CrRejected-Finance | ₹12.3 Cr | L-2 | Rejected-Finance As Recommended by Tender Committee and duly approved |
| 3 | L-3₹13.4 CrRejected-Finance | ₹13.4 Cr | L-3 | Rejected-Finance As Recommended by Tender Committee and duly approved |
| 4 | L-4₹14.0 CrRejected-Finance | ₹14.0 Cr | L-4 | Rejected-Finance As Recommended by Tender Committee and duly approved |
| 5 | Rejected-Technical | - | - | Rejected-Technical Rejected by TC and duly approved |
Tender Value
₹16.7 Cr
EMD Value
₹20.9 L
Closing Date
29 May 2023, 5:00 pmClosed
General Manager (Civil)/HoD, SECL
Office of GM (Civil)/HoD, SECL Bhawan, Seepat Road, Bilaspur, CG, PIN-495006. Contact No. 09422293565/ 09425531210/ 07880128817email - gmcivilhod.secl(at)gmail.com and/or gmcivil.secl(at)coalindia.in
Diversion of coal transportation road along new alignment at Amadand OCP Sub Area including comprehensive maintenance for 5 years at Jamuna Kotma Area
2023_SECL_278784_1
GM(C)/SECL/BSP/e-T/JnK/2023/07 dtd.08.05.2023
Open Tender
Civil Works - Roads
2190 days
Jamuna Kotma Area, SECL
Please refer Tender documents.
5 documents required · 5 mandatory
₹20.9 L
18 Oct 2023
10 May 2023
31 May 2023
10 May 2023
29 May 2023
11 May 2023
10 May 2023 - 22 May 2023
Amount
Road Portion
Construction of embankment with approved material having CBR>7 obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-1, 300-2 and as per relevent clauses of section-300.
Construction of granular sub-base by providing close graded Material, , carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface watering, rolling and compacting with vibratory power roller at OMC to achieve the desired density, complete as per clause 401 : Plant mix method (with Mechanically crushed stone only) for grading- II Material
Construction of granular sub-base by providing close graded Material, , carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface watering, rolling and compacting with vibratory power roller at OMC to achieve the desired density, complete as per clause 401 : Plant mix method (with Mechanically crushed stone only) for grading- III Material
Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub base/base course on well prepared surface and compacting with vibratory roller to achive the desired density in accordance to Table No. 400-12, 400-13 and as per clause of section 406 of specifications.
Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.75 kg/sqm using mechanical means as per clause 502 of specifications
Providing and applying tack coat with catonic bitumen emulsion (RS-1) using emulsion pressure distributor on the prepared bituminous/granular surface cleaned with mechanical broom and as per relevant clauses of section-503 of specifications (ii) @0.30 kg per sqm (dry & hungry bituminous surfaces/granular surfaces treated with primer)
Providing and applying tack coat with catonic bitumen emulsion (RS-1) using emulsion pressure distributor on the prepared bituminous/granular surface cleaned with mechanical broom and as per relevant clauses of section-503 of specifications.@ 0.25 kg per sqm (Non-bituminous surfaces) cement concrete pavement.@ (i) @ 0.25 kg per sqm (normal bituminous surfaces
Providing and laying bituminous macadam using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction and as per clause 504 of specifications:(a) Using Batch Mix Plant of appropriate capacity and Paver finisher Hydraustatic with Sensor: (ii) for GradingII(19 mm nominal size) bitumen content 3.5%
Providing and laying bituminous concrete using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per clause 507 of specification. (a) Using Batch Mix Plant of appropriate capacity and Paver Finisher Hydraustatic with Sensor control, (iv) For Grading-II (30-45 mm thickness) with 60/70 bitumen(VG-30)
Culvert Portion (02 No.s RCC Box Culvert & 10 Nos. RCC Hume Pipe Culverts)
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.: All kinds of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources).
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, ifnishing and reinforcement- All work up to plinth level : 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level : Hot rolled deformed bars
Laying Reinforced Cement Concrete Pipe NP4/prestrssed concrete pipe on first class bedding in single row. Providing and Laying Reinforced cement concrete pipe NP4/prestrssed concrete pipe for culverts on first class bedding of granular material (cost of bedding included) in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets. 1200 mm dia
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources: 6 graded stone aggregate 40 mm nominal size derived from natural sources).
Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform
Total impact of GST for the purpose of CTC
SHREE RAM CONSTRUCTION COMPANY
M/S BAIJNATH AGRAWAL
M/s Ramniwas Poddar
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid