| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.5 LAccepted-AOC JHIRKEY KATHARA BOKARO JHARKHAND 829116 | KATHARA | BOKARO | JHARKHAND | 829116 | ₹6.5 L | L1 | Accepted-AOC Awarded as Techno commercially accepted being as L1 bidder |
| 2 | L2₹6.5 L+₹2,307 (0.35%)Rejected-Finance JHIRKEY KATHARA BOKARO JHARKHAND 829116 | KATHARA | BOKARO | JHARKHAND | 829116 | ₹6.5 L+₹2,307 (0.35%) | L2 | Rejected-Finance Techno commercially rejected not being as L1 bidder |
| 3 | L3₹6.6 L+₹8,211 (1.26%)Rejected-Finance JHIRKEY KATHARA BOKARO JHARKHAND 829116 | KATHARA | BOKARO | JHARKHAND | 829116 | ₹6.6 L+₹8,211 (1.26%) | L3 | Rejected-Finance Techno commercially rejected not being as L1 bidder |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technically rejected |
Tender Value
₹7.7 L
EMD Value
₹9,600
Closing Date
20 Jun 2025, 11:00 amClosed
Vikram Kumar
Office of Project Officer, Kathara Washery, Kathara Area
Fabrication and erection of Suction pipe 200 mm (60 m), Nozzle 200 mm (04 nos.), Pipe bends of 200 mm (30 m) along with fitting of drain/plug valve 4 inch (11 nos.), Plug valve 10 inch (4 nos.), gate valve 10 inch (4 nos.) and Flange making and fitti
2025_CCL_337175_1
PO/KTW/EnM/eTen/25-26/05 Dated-07.06.2025
Open Tender
Electrical and Maintenance Works
Item Rate
45 days
Kathara Washery
As per NIT
4 documents required · 4 mandatory
₹9,600
9 Jul 2025
9 Jun 2025
21 Jun 2025
10 Jun 2025
20 Jun 2025
10 Jun 2025
10 Jun 2025 - 16 Jun 2025
Amount
A) Complete dismantling of Suction pipe 200 mm (60 m), Nozzle 200 mm (04 nos.), Pipe bends of 200 mm (30 m) along with drain/plug valve 4 Inch (11 nos.), Plug valve 10 Inch (4 nos.), gate valve 10 inch (4 nos.), Flanges, delivery pipe and bend of vertical pump (4 inch, 24 m) In bottom of Thickener no. 01 and its shifing/transporting to Scrap yard of Kathara Washery Rigger (2 head x 2 shift x 11 days)
Welder (2 head x 2 shift x 11 days)
Fitter (1 head x 2 shift x 11 days)
Helper (3 head x 2 shift x 11 days)
Supervisor (1 head x 2 shift x 11 days)
Oxygen Gas
D.A. Gas
Tools & tackles
Contractor profit
B) Shifting of New Pipes and valves by loading at store and unloading at working site (10 m below surface) of Thickener no. 01 Rigger (3 head x 2 shift x 6 days)
Welder (1 head x 2 shift x 6 days)
Fitter (1 head x 2 shift x 6 days)
Helper (3 head x 2 shift x 6 days)
Supervisor (1 head x 2 shift x 6 days)
Tools & tackles
Contractor profit
C) Fabrication and erection of Suction pipe 200mm (60 m) Pipe bends of 200mm (30m) along with fitting of drain/plug valve 4 inch (11 nos.) and Elange making and fitting with nut and bolts and delivery pipe of vertical pump (4 inch, 24 m) Rigger (2 head x 2 shift x 16 days)
Welder (2 head x 2 shift x 16 days)
Fitter (1 head x 2 shift x 16 days)
Helper (3 head x 2 shift x 16 days)
Supervisor (1 head x 2 shift x 16 days)
Oxygen Gas
D.A. Gas
Electrode
Tools & tackles
Contractor profit
D) Fitting of drain/plug valve 4 inch (11 nos.), Plug valve 10 inch (4 nos.), gate valve 10 inch (4 nos.) and gate valve gasket with nut and bolts Rigger (2 head x 2 shift x 9 days)
Welder (2 head x 2 shift x 9 days)
Fitter (1 head x 2 shift x 9 days)
Helper (3 head x 2 shift x 9 days)
Supervisor (1 head x 2 shift x 9 days)
Oxygen Gas
D.A. Gas
Electrode
Tools & tackles
Contractor profit
Total impact of GST for the purpose of CTC
M/S GENERAL ENGINEERING CONSTRUCTION (BID ID -1161149)
ABU TALIB (BID ID -1161148)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .