7th Floor, East wing, Swarnajayanthi Commercial Complex, Ameerpet, Hyderabad-500038
Providing chain link fencing for the Government land in MLA colony, Banjara hills situated in Sy.No.102/1(P), Hakimpet (V), Shaikpet (M), Hyderabad
678221
HMDA/DEV/CE/47/02/2025-26, Date: 27.01.2026
OPEN
Civil Engineering Works
HYDERABAD, TELANGANA
1 document required · 1 mandatory
₹2,778
₹78,500
2 Feb 2026
2 Feb 2026
2 Feb 2026
Engaging a Hydraulic excavator of 0.9 cum bucket capacity along the boundary of the land for removal of boulders and levelling by mechanical means, including cost and conveyance of all materials to the site, all operational, Incidental and Labour Charges, TP, Overheads and Contractor's Profit, etc., but exculding seignorage charges Complete for finished item of work and as directed by Engineer-In- Charge.
Engaging JCB along the boundary of the land for clearance of boulders and levelling, etc., complete including cost and conveyance of all materials to the site, all operational, Incidental and Labour Charges, TP, Overheads and Contractor's Profit, etc., but exculding seignorage charges Complete for finished item of work and as directed by Engineer-In- Charge.
Engaging Tipper 5.0 Cum for Carting of Debries/ excavated earth, Unserviceable material with a lead of 5 KM including loading, unloading, conveyance and overhead charges, including cost and conveyance of all materials to the site, all operational, Incidental and Labour Charges, TP, Overheads and Contractor's Profit, etc., but exculding seignorage charges Complete for finished item of work and as directed by Engineer-In- Charge.
Engaging Dozer 50 hp for levelling and jungle clearance all along the boundary of the land, complete, including cost and conveyance of all materials to the site, all operational, Incidental and Labour Charges, TP, Overheads and Contractor's Profit, etc., but exculding seignorage charges Complete for finished item of work and as directed by Engineer-In- Charge.
Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m, complete for finished item of work in Ordinary soils-Mechanical Means-Upto 3 m depth including cost and conveyance of all materials to the site, all operational, Incidental and Labour Charges, TP, Overheads and Contractor's Profit, etc., but exculding seignorage charges Complete for finished item of work and as directed by Engineer-In- Charge.
Plain Cement Concrete (1:5:10) proportion by machine mix (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Granite macine crushed metal from approved quarry including cost and conveyance of all materials to the site, all operational, Incidental and Labour Charges, TP, Overheads and Contractor's Profit, etc., but exculding seignorage charges Complete for finished item of work and as directed by Engineer-In- Charge.
Plain Cement Concrete (1:3:6) proportion by machine mix (cement: fine aggregate: Coarse aggregate) using 20mm and down size Hard Granite macine crushed metal from approved quarry including cost and conveyance of all materials to the site, all operational, Incidental and Labour Charges, TP, Overheads and Contractor's Profit, etc., but exculding seignorage charges Complete for finished item of work and as directed by Engineer-In- Charge.
Manufacturing, Supply, Welding, Fabrication, Erection and Fixing of MS Angles and Patties, including wastages, cost and conveyance of all materials to the site, all operational, Incidental and Labour Charges for fabrication and fixing, TP, Overheads and Contractor's Profit, etc., but exculding seignorage charges Complete for finished item of work and as directed by Engineer-In- Charge.
Manufacturing, Supply, Fabrication, Erection and Fixing of Hot dipped Galvanized Iron Chain link mesh 8 gauge - (4.0 mm) as per IS: 2721-1979: 4"x4" (102 mm x 102 mm) - 8 Gauge including cost and conveyance of all materials to the site, all operational, Incidental and Labour Charges for fabrication and fixing, TP, Overheads and Contractor's Profit, etc., but exculding seignorage charges Complete for finished item of work and as directed by Engineer-In- Charge..
Painting to New iron work with two coats of ready mixed synthetic enamel paint of first quality in all shades to give an even shade over base coat, Primer of red oxide after thoroughly brushing the surface to remove all remains, including cost and conveyance of all materials to the site, all operational, Incidental and Labour Charges, TP, Overheads and Contractor's Profit, etc., but exculding seignorage charges Complete for finished item of work and as directed by Engineer-In- Charge.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender document.docx
TENDER_DOCUMENT • 0.19 MB
BOQ.xlsx
TENDER_DOCUMENT • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .