| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 CrAccepted-AOC MAIN BAZAR SURANKOTE DISTT POONCH 185121 J K | SURANKOTE | POONCH | J K | 185121 | ₹2.4 Cr | L1 | Accepted-AOC LOWEST AMOUNT QUOTED |
| 2 | L2₹3.0 Cr+₹58.4 L (24.5%)Accepted-AOC H NO 75 76 SARWAL COLONY JAMMU JAMMU JAMMU KASHMIR 180005 | JAMMU | JAMMU AND KASHMIR | 180005 | ₹3.0 Cr+₹58.4 L (24.5%) | L2 | Accepted-AOC HIGHER AMOUNT QUOTED |
| 3 | L3₹3.0 Cr+₹61.2 L (25.7%)Accepted-AOC | ₹3.0 Cr+₹61.2 L (25.7%) | L3 | Accepted-AOC HIGHER AMOUNT QUOTED |
Tender Value
₹2.5 Cr
EMD Value
₹15.5 L
Closing Date
1 Feb 2020, 6:00 pmClosed
CO, 15 MECH INF
15 MECH INF PIN-911715 c/o 56 APO
Construction of structures for integrated battle training area
2019_ARMY_305786_1
278/MOTIMS/G
Open Tender
Construction Works
Works
365 days
Rakhmuthi Military Station, Akhnoor
As per tender document
4 documents required · 4 mandatory
₹500
CO 15 MECH INF
₹15.5 L
Akhnoor
21 Nov 2020
12 Dec 2019
3 Feb 2020
12 Dec 2019
1 Feb 2020
12 Dec 2019
12 Dec 2019 - 27 Jan 2020
24 Dec 2019
Clearing jungle including uprooting rank vegetation, grass, brushwood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.
Banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with ½ tonne roller, or wooden or steel rammers and dressing up, in embankments etc. lead upto 50 m and lift upto 1.5 m.
Banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with ½ tonne roller, or wooden or steel rammers and rolling every third and top layer with with power roller of minimum 8 tonnes and dressing up, in embankments etc. lead upto 50 m and lift upto 1.5 m.
Supply of good earth
Earth work in excavation by manual means over areas (exceeding 30 cm and upto 1.50 mtr in depth, 1.50 mtr in width as well as 10 sqm on plan) incl. disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed. All kinds of soils.
Filling available excavated earth (excluding rock) in trenches, plinth slides of foundations etc in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering lead up to 50 m and lift up to 1.5 m
Providing and Laying in position cement concrete of specified grade excluding the cost of centring and shuttering-All work up to plinth level 1:3:6(1 cement:3 coarse sand:6 graded stone aggregate 40 mm nominal size) crushed. Foundations;
Providing and Laying in position cement concrete of specified grade excluding the cost of centring and shuttering-All work up to plinth level 1:2:4(1 cement: 2 coarse sand: 4 graded stone aggregate 40 mm nominal size) crushed.
Providing and Laying in position machine batched, machine mixed and machine vibrated design mix cement concrete of specified grade for reinforced cement concrete structural elements, excluding the cost of centring, shuttering, finishing and reinforcement, including admixtures in recommended proportions, (as per IS 9103) to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge, m-30 grade reinforced cement concrete (minimum cement content 340 kg/cum). All work upto plinth level.
Providing and Laying in position machine batched, machine mixed and machine vibrated design mix cement concrete of specified grade for reinforced cement concrete structural elements, excluding the cost of centring, shuttering, finishing and reinforcement, including admixtures in recommended proportions, (as per IS 9103) to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge, m-25 grade reinforced cement concrete (minimum cement content 330 kg/cum). All work upto plinth level.
Brick work with F.P.S bricks of class designation 75 in foundation and plinth in cement mortar 1:6 (1 cement: 6 coarse sand)
Pointing on brickwork in cement mortar 1:3 (1 cement: 3 fine sand)
Centring and shuttering including strutting , propping etc and removal of forms for: Foundations, footings, bases of columns etc. For mass concrete.
Centring and shuttering including strutting , propping etc and removal of forms for: Walls (any thickness) including attached pilasters, buttresses, plinth and string courses, etc.
Centring and shuttering including strutting , propping etc and removal of forms for: Edges of RCC horizontal bands under 200 mm wide
12mm cement plaster of mix 1:4(1 cement:4 fine sand)
Reinforcement for RCC works including straightening, cutting, bending, placing in position and binding all complete. Thermo mechanically treated bars.
Providing and Laying 100 mm thick factory made cement concrete interlocking paver blocks of M-55 grade made by block making machine with strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 30 mm thick compacted bed of course sand, filling the joints with courses and etc., all complete as per direction of the Engineer-in- Charge.
Structural Steel work welded in built up sections, trusses and framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc are required.
Providing and fixing bolts upto 300 mm in length including nuts and washers complete.
M/S JAI SUKRALA TRADING CORP.
Tawi Enterprises
M/S JAI SUKRALA TRADING CORP.
M/S KIRAN CONSTRUCTIONS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .