Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.6 LAccepted-AOC | ₹6.6 L | 1 | Accepted-AOC Accepetd |
| 2 | 2₹6.6 LRejected-Finance | ₹6.6 L | 2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | PRABHU CONTRACTOR L1 | Ashokan M L2 |
|---|---|---|---|---|---|
| 1.001. ECR road to Chithoorvadi road (via) Melachendhanendhal km0/0 - 4/180 | |||||
| 2.00Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | |||||
| 3.00 | Km 0/0-4/18 | 288 | sqm | 6 ₹1,728 | 6 ₹1,728 |
| 4.00Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | |||||
| 5.00 | Km 0/0-4/18 | 72 | cum | 138 ₹9,936 | 140 ₹10,080 |
| 6.00Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat | |||||
| 7.00 | Km 0/0-4/18 | 519 | sqm | 33 ₹17,127 | 35 ₹18,165 |
| 8.00Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com. | |||||
| 9.00 | Km 0/0-1/00 | 182.75 | sqm | 305 ₹55,738.75 | 308 ₹56,287 |
| 10.00 | Km 1/0-2/0 | 146.25 | sqm | 309.85 ₹45,315.56 | 310 ₹45,337.50 |
Updated dates
Tender Value
Refer Docs
EMD Value
₹7,110
Closing Date
31 Oct 2025, 3:00 pmClosed
BDO(B.P)
Block Development Office, R.S.Mangalam
Package01/Maintenance of Rural roads in RSMangalam Block in Ramanathapuram District
2025_RDTN_617491_1
A2/5999/2025,RRMS 2025-26
Open Tender
Civil Works
180 days
R.S.Mangalam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹7,110
Yes
4 Feb 2026
27 Oct 2025
31 Oct 2025
27 Oct 2025
31 Oct 2025
27 Oct 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.77 MB
01Techbid.pdf
Tender Documents • 0.55 MB
01Pricebid.pdf
Tender Documents • 0.35 MB
BOQ_737955.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid