Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Accept |
| 2 | Accepted-Technical | Accepted-Technical Accept |
| 3 | Accepted-Technical | Accepted-Technical Accept |
| 4 | Accepted-Technical | Accepted-Technical Accept |
| 5 | Accepted-Technical | Accepted-Technical Accept |
Tender Value
₹86.2 L
EMD Value
₹1.7 L
Closing Date
8 May 2026, 6:00 pmClosed
SE AND PM JAISALMER
SE AND PM JAISALMER
CONSTRUCTION OF VARIOUS WATERSHED DEVELOPMENT STRUCTURES IN PROJECT AREA OF PMKSY 2.0 BLOCK BHANIYANA
2026_WDSC_553987_1
01/2026-27 BHANIYANA
Open Tender
Civil Works
Percentage
180 days
JAISALMER
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
SE AND PM JAISALMER / MD RISL JAIPUR
₹1.7 L
Yes
SE AND PM JAISALMER
18 May 2026
24 Apr 2026
11 May 2026
24 Apr 2026
8 May 2026
24 Apr 2026
30 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation by machine including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect | 8,983.44 | Cum | - | - |
| 2 | Excavation by machine including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect | 7,808.96 | Cum | 80.33 | ₹6,27,293.76 |
| 3 | Cement concrete mix (1:4:8) well mixed and laid in position complete including all leads of all construction materials including curing and finishing having well graded crusher broken stone aggregate of maximum size upto 40mm | 64.03 | Cum | 3,308.93 | ₹2,11,870.79 |
| 4 | R.R. stone Masonry (using R. R. stones where stones to be not less than 15 cm in size in any direction) for foundation including all leads of all construction materials including curing etc. complete in 1: 6 Cement Mortar | 474.3 | Cum | 3,872.51 | ₹18,36,731.49 |
| 5 | 50mm thick Cement concrete (1:2:4) M-15 well mixed and laid in position complete including all leads of all construction materials including curing and finishing having well graded crusher broken stone aggregate of maximum size upto 20mm, | 758.4 | Sqm | 421.68 | ₹3,19,802.11 |
| 6 | 25 mm thick cement plaster on wall with 1:4 ratio with joint scraping and regular leveling for 14 days(BHANIYANA BSR RD&PR 2023-24) | 817.86 | Sqm | 313.23 | ₹2,56,178.29 |
| 7 | Flush or ruled pointing on stone masonry including racking of joints and curing etc. complete including all leads of all construction materials in mortar ratio. | 395.02 | Sqm | 126.99 | ₹50,163.59 |
| 8 | P/L stone slabs, filling with cement in 1:4 ratio with top and bottom joints with stone chips, 2.4 m. from 3.0m span | 308.03 | Sqm | 2,146.35 | ₹6,61,140.19 |
| 9 | Leveling the excavated soil, in the Catchment area and pouring water and ramming with a rammer. | 484.08 | Cum | 71.61 | ₹34,664.97 |
| 10 | Unpolished rough kota stone/jaisalmeri stone should be leveled directly on top of 20 mm thick cement mortar 1:4 and joints should be filled with cement mortar 1:3 and flush tipped. | 3,065.58 | Sqm | 691.66 | ₹21,20,339.06 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.62 MB
BOQ_986848.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .