Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.4 LAccepted-Finance | L1 | Accepted-Finance admitted | |
| 2 | L2₹22.7 L+₹25,539.81 (1.14%)Accepted-Finance KARUR | L2 | Accepted-Finance admitted |
Tender Value
₹22.7 L
EMD Value
₹23,000
Closing Date
23 Nov 2020, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Development Officer VP
BDO Office Bargur
Krishnagiri DT - Bargur block Basic Amenities For SC Habitations 2020-21 - Strengthening of the road from Orappam - Chentharapalli road to Marudepalli Via Giddappanayanapalli km 1.60-2.50 Road Code R210 H o.Orappam - Package No 3
2020_RDTN_185138_1
roc_no_3266_20_R4_01_10_20
Open Tender
Civil Works - Roads
Item Rate
180 days
Bargur
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹23,000
BDO Office Bargur
27 Nov 2020
13 Nov 2020
23 Nov 2020
13 Nov 2020
23 Nov 2020
13 Nov 2020
18 Nov 2020
90 days
Amount
1.Strengthening of the road from Orappam - Chenthrapalli road to Marudepalli (Via) Giddappanayanapalli km 1/60-2/50(R210) H/o. Orappam
Clearing and grubbing (Scrub Jungle) road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Picking old metalled / BT surface upto 10 cm thick as directed by the departmental officers
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading , watering and compacting by power roller to achieve the required proctor density at 100 % compaction at optimum moisture content
Providing and laying Water Bound Macadam Grading - II ( 75mm to 22.40mm)IRC HBGmetal consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Providing and laying Water Bound Macadam Grading - III(63mm to11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method) Rate for 10sqm
Applying TACK COAT over WBM surface at 4Kg / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete
Providing Hard Bed @ KM 2/150
Earth Work Excavation for Foundation in all soils and sub soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and requiring the sides of foundation
Cement concrete 1:4:8 mix using 40mm HGB Metal for foundation including watering wherever necessary and laid in layers of not more then 15 cm thick ., compacting etc., complete complying with standard specification and as directed .
Supplying and wrecting centering shuttering including necessary supports for planee surface in basement and in all floor for RCC column footing column plinth beam , beams ,fof slabs , staircase steps , bed blocks , critical
Cement concrete1:3:6 mix using 40mm HGB Metal for foundation including watering wherever necessary and laid in layers of not more then 15 cm thick ., compacting etc., complete complying with standard specification and as directed .
Providing and laying Water Bound Macadam Grading - III(63mm to11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method) Rate for 10sqm
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30
Provision for KM stone
Provision for HM stone
Provision for Sign borad
Provision for Name borad
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SPE Construction
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .