Tender Value
₹2.0 L
EMD Value
₹3,930
Closing Date
13 Jul 2026, 5:00 pm5d left
Jagmal
DIV 1 Rohtak
A/mtc. of Sewerage scheme i
2026_HBC_534114_1
2026D93BF94E 7D92 47FE A743 DC1DDF991366267HSV
Open Tender
Civil Works
30 days
Rohtak
As per approved DNIT/NIT/CBD
2 documents required · 2 mandatory
₹250
₹3,930
Yes
7 Jul 2026
7 Jul 2026
14 Jul 2026
7 Jul 2026
13 Jul 2026
7 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [11.52]Cement rendering on plaster 1 mm thick | 134 | Sqm | 28 | ₹3,752 |
| 2 | [11.7.1]20 mm cement plaster of mix : 1. 1:4 (1 cement: 4 fine sand) | 134 | Sqm | 65 | ₹8,710 |
| 3 | [21.93.1]Providing and fixing SFRC MANHOLE COVERS AND FRAMES MARKED WITH IS: 12592 including setting the same to correct lines and levels in 1:3 cement sand mortar over manhole including carriage loading unloading stacking handling re-handling etc. complete in all respects to the satisfaction to the Engineer-in-charge. 1. Type:- Extra Heavy Duty Set (EHD-35) 560MM Clear Opening | 30 | Each | 1,155 | ₹34,650 |
| 4 | [6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 4 | cum | 4,374 | ₹17,496 |
| 5 | [6.33.3]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 3. Cold twisted bars | 400 | Kg. | 68 | ₹27,200 |
| 6 | [7.20.1]Brick work with common burnt clay modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) | 14 | cum | 4,287 | ₹60,018 |
| 7 | NS) Removing of silt from inside of manhole including the cost of loading, unloading, cartage and shifting of malba/sludge from the site, TandP, safety equipment etc. complete in all respect, as desired and directed by the Engineer-in-charge. | 20 | Each | 2,220 | ₹44,400 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
BOQ_613199.xls
BOQ • 0.35 MB
AD0170577.pdf
Additional Documents • 1.48 MB
Download all tender documents and submit your bid