Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.4 LAccepted-AOC SENGADU PO EDAPPULI NADU KOLLIHILLS TK PIN 637411 | KOLLIHILLS | NAMAKKAL | TAMIL NADU | 637411 | ₹3.4 L | 1 | Accepted-AOC lowest amount quotted |
| 2 | 2₹3.4 LRejected-AOC KANIYANUR PANCHAYAT | ₹3.4 L | 2 | Rejected-AOC Highest amount quotted |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance 456 1 AROOR KOOT ROAD SORAIYUR POST KALAVAI TALUK RANIPET 632318 | RANIPET | TAMIL NADU | 632318 | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-- |
| Sl No | Description | Qty | Unit | MURUGAN L1 | SPR TRADERS L2 |
|---|---|---|---|---|---|
| 1.00Providing CC Pavement in Palla Street in Perumanthangal Panchayat in Thimiri Union.. | |||||
| 1.01 | Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 A. | 17.84 | Cum | 131 ₹2,337 Lowest | 132 ₹2,355 |
| 1.02 | Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete. | 23.49 | Cum | 5,631.5 ₹1,32,284 | 5,631 ₹1,32,272 Lowest |
| 1.03 | Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete | 55.1 | Sqm | 182 ₹10,028 Lowest | 185 ₹10,194 |
| 1.04 | Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete | 3.48 | Cum | 6,421 ₹22,345 Lowest | 6,421 ₹22,345 Lowest |
| 1.05 | Cement Concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete | 16.31 | Cum | 7,038 ₹1,14,790 Lowest | 7,038 ₹1,14,790 Lowest |
| 1.06 | Provision for Bitumen Pad for Expansion joints | 1 | Nos | 3,000 ₹3,000 Lowest | 3,100 ₹3,100 |
| 1.07 | Provision for Name board | 1 | Nos | 4,500 ₹4,500 Lowest | 4,500 ₹4,500 Lowest |
| 1.08 | Provision for Photo charges | 1 | Nos | 400 ₹400 Lowest | 500 ₹500 |
| 2.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 52,143.12 ₹52,143.12 Lowest | 52,210.08 ₹52,210.08 |
Tender Value
Refer Docs
EMD Value
₹3,450
Closing Date
10 Jun 2026, 3:00 pmClosed
president
Panchayat office Perumanthangal
Providing CC Pavement in Palla Street in Perumanthangal Panchayat in Thimiri Union.
2026_RDTN_678308_1
A1/01/2025
Open Tender
Civil Works
Item Wise
180 days
Panchayat office Perumanthangal
Providing CC Pavement in Palla Street in Perumanthangal Panchayat in Thimiri Union.
1 document required · 1 mandatory
₹0
₹3,450
Panchayat office Perumanthangal
13 Jul 2026
26 May 2026
10 Jun 2026
26 May 2026
10 Jun 2026
26 May 2026
26 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Providing CC Pavement in Palla Street in Perumanthangal Panchayat in Thimiri Union.. | |||||
| 1.01 | Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 A. | 17.84 | Cum | 131.89 | ₹2,352.92 |
| 1.02 | Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete. | 23.49 | Cum | 5,631.66 | ₹1,32,287.69 |
| 1.03 | Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete | 55.1 | Sqm | 182.5 | ₹10,055.75 |
| 1.04 | Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete | 3.48 | Cum | 6,421.26 | ₹22,345.98 |
| 1.05 | Cement Concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete | 16.31 | Cum | 7,038.36 | ₹1,14,795.65 |
| 1.06 | Provision for Bitumen Pad for Expansion joints | 1 | Nos | 3,000 | ₹3,000 |
| 1.07 | Provision for Name board | 1 | Nos | 4,500 | ₹4,500 |
| 1.08 | Provision for Photo charges | 1 | Nos | 400 | ₹400 |
| 2GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_814936.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.23 MB
BOQ_814936.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].