Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.4 LAccepted-Finance | ₹29.4 L | L1 | Accepted-Finance ok |
| 2 | L2₹29.7 LAccepted-Finance | ₹29.7 L | L2 | Accepted-Finance ok |
| 3 | L3₹30.6 LAccepted-Finance AT ALIBAG TAL ALIBAG DIST RAIGAD | ALIBAG | RAIGAD | MAHARASHTRA | ₹30.6 L | L3 | Accepted-Finance ok |
Tender Value
₹29.4 L
EMD Value
₹29,402
Closing Date
29 Jun 2026, 5:00 pmClosed
Executive Engineer (RWS), kunthebag, alibag tal-
Executive Engineer (RWS), kunthebag, alibag tal- alibag dist- raigad
Construction of protection wall to Nala at Koproli Yejwal Tal. Alibag. Dist. Raigad
2026_RAIGA_1308649_7
RAIGAD/RWSS/29/2026-27
Open Tender
Civil Works - Water Works
180 days
Alibag. Dist. Raigad
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,180
₹29,402
1 Jul 2026
15 Jun 2026
30 Jun 2026
15 Jun 2026
29 Jun 2026
15 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Item No. 1 - Excavation for foundation/pipe trenches in Soft murum, road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below, stacking and spreading as directed by Engineer-in charge, normaldewatering, preparing the bed for foundation and excluding backfilling, etc.complete | 87 | Cum | 165 | ₹14,355 |
| 2 | Item No. 2 - Excavation for foundation/pipe trenches by all means in hard murum including removing the excavated material upto a distance of 50 M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc, complete. | 87 | Cum | 211 | ₹18,357 |
| 3 | Item No.3 - Providing & laying in situ. C.C of trap granite/quartzite /gneiss/metal for foundation & bedding including dewatering, from work,compacting, curing, finishing etc. complete. M 150 | 34.8 | Cum. | 5,881 | ₹2,04,658.8 |
| 4 | Item No.4:- Providing and casting in situ C.C. of trap/granite/quartzite / gneiss metal of approved quality for RCC works as per detailed drawings and designs or as directed by Engineer-in-charge including normal dewatering, centering, form work, compaction, finishing the formed surfaces with C.M. 1:3 of sufficient minimum thickness to give a smooth and even surface wherevermecessary or roughening if special finish is to be provided and curing, etc. complete. (By weigh batching and mix design for M-250 and M-300 only. Use of L&T, A.C.C., Ambuja, Birla Gold, Manikgad, Rajashree, etc. cement is permitted.) (Excluding M.S.orTorreinforcement) R.C.C. M-150 for protection wall | 258.39 | Cum. | 7,264 | ₹18,76,944.96 |
| 5 | Item no 5 - Providing & fixing in position steel bar reinforcement of various diameters for R.C.C. Pipes caps,footing, foundation, slab,beams,columns, canopies, staircase, newels, chajjas, lintels,pardies, coping, fine arches etc.-as per detailed designs, drawing & schedule s including cutting,bending, hooking the bars, bindingwith wires or tack welding & supporting as required etc. complete (including cost of binding wire). Tor steel | 4.06 | MT | 80,681 | ₹3,27,564.86 |
| 6 | Item no - 6 Providing & fixing 80 mm dia. AC/PVC pipe weep holes at 1.5 m c/c straggererd including cost of all materials and labours involved with all leads and lifts etc. complete. | 135 | RMT | 231 | ₹31,185 |
| 7 | Item No 7 - Dewatering the excavated trenches and pools of water in the building trenches/pipeline. trenches, well works by using pumps and other devices including disposing off water to safe distance as directed by Engineer-in-charge (including cost of machinery, labour, fuel), etc. complete. | 90 | BHP.Hr | 89 | ₹8,010 |
| 8 | Item no - 8 Providing and fixing board displaying information such as'Nameofwork, Tendercost, Nameof Contractor, Workcompletion and liability period etc having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild | 1 | No | 9,963 | ₹9,963 |
| 9 | Item no.9-Compressive Strength OF C.C. Cube | 1 | No | 690 | ₹690 |
| 10 | Add 18% GST | 24,91,728.62 | Total Amount | 0.18 | ₹4,48,511.15 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.39 MB
BOQ_2245427.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid