Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹13.8 Cr
EMD Value
₹13.8 L
Closing Date
17 Nov 2026, 5:30 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Directorate of Municipal Administration
Chief Engineer
Package No-32 Design, Build, Operate and Transfer (DBOT) of Interception and Diversion works in Bogadi, Rammanahalli, Periyapatna, Krishnarajanagara & Heggadadevankote ULBs of Mysuru District, Madikeri & Virajpet ULBs of Kodagu District with 5 years operation and maintenance(including 2 year Defect liability period) under Swachh Bharat Mission (Urban)2.0 fund
DMA/2026-27/WS/WORK_INDENT62762
DMA/2026-27/WS/WORK_INDENT62762
Open
Water supply/sewage lines
Two Tender Document System(Two Cover)
DMA Directorate Office Bengaluru
1 document required · 1 mandatory
To qualify for award of this contract, The intending bidder can submit bids as an Individual / joint venture bidder should have in the last five years i.e., 2021-22 to 2025-26, Satisfactorily completed (at least 90% of the contract value), as prime contractor, at least one similar work such as UGD project /I&D project/ water supply project/Lift - Irrigation Projects /Storm Water Drains/combined water supply & sewerage project/ combined water supply or Sewerage project with Road/ combined water supply or Sewerage project with Layout works/ combined water supply or Sewerage project with Building works of value not less than Rs. 689.4 Lakhs during the last 5 financial years (2021-22 to 2025-26),The certificate should be issued by an officer not below the rank of the Executive Engineer or Equivalent or Employer in case of Govt / Semi Govt. Authorities and General Manager in case of public sector Undertaking.( If the bid is submitted as joint venture, then any one partner/jointly should meet the requirement)
The tenderer or his identified electrical-contractor should possess required valid Class-II and above electrical license and should have executed similar electrical works totalling to Rs. 52.33 Lakhs in any one year of the last five years (2021-22 to 2025-26),If the bid is submitted as joint venture, then any one partner/jointly should meet the requirement.
The intending bidder(Including JV partner) should furnish the Class-I Registration Certificate of any State/Central-Government/Public-Sector Organization issued by competent authorities.
To qualify for award of this contract, The intending bidder can submit bids as an Individual / joint venture bidder should have in the last five years i.e., 2021-22 to 2025-26, Executed in any one year (continuous in 12 months) of the last five years (2021-22 to 2025-26),1) Earthwork excavation/embankment - 13027 cum, 2) Cement concrete (PCC&RCC) - 2254 cum, 3) TMT Steel/ structural steel - 144 MT, 4) All types of pipes(RCC NP3/ DI/ u-PVC/ Stone ware/MS pipes/DWC/GSW/HDPE pipes) - 5.37 km, 5) Granular Sub Base & Wet Mix Macadam - 1824.77 cum, 6) Bituminous Macadam & Semi Dense Bituminous Concrete- 294.31 cum,(The certificate should be issued by an officer not below the rank of the Executive Engineer or Equivalent or Employer in case of Govt / Semi Govt. Authorities and General Manager in case of public sector Undertaking) If the bid is submitted as joint venture, then any one partner/jointly should meet the requirement.
The intending bidder can submit bids as an Individual/joint venture bidder should further demonstrate:(a)The critical equipment specified as below shall be made available for all the works on owning, lease/hire basis subject to the submission of valid commitment agreements or relevant documentation verifying its availability. 1) Excavators - 2 Nos (1No own, 1No Lease/hire) ,2) Tippers - 2 Nos (1No own, 1No Lease/hire) 3) Concrete Batching plant/Self-loading Concrete mixer-1/2 Nos, If the bid is submitted as joint venture, then any one partner/jointly should meet the requirement, Note: The bidder shall provide invoice / RC book copies for owned vehicles and for lease/hire vehicles, lease agreement along with RC book copy/invoice for vehicles.
Tenderers who meet the other specified minimum qualifying criteria, will only be qualified, if their available tender capacity is more than the total tender value. The available tender capacity will be calculated as under Assessed available tender capacity is (AxNx1.50 - B) where A, N & B as per tender document
To qualify for award of this contract, the intending bidder can submit bids as an Individual / joint venture bidder should have in the last five years i.e., 2021-22 to 2025-26, achieved in at least two financial years a minimum financial turnover (in all classes of civil engineering construction works only) of Rs. 2757.76 Lakhs. If the bid is submitted as JV, then the requirement of minimum financial turnover shall be considered on the basis of combined resources. The lead partner should have an annual financial turnover of not less than 51% of total turnover & JV member not less than 25% of total turnover indicated above in any two financial years and Combining should meet 100% during last 5 financial years (2021-22 to 2025-26). All document/ certificates issued by a Charted Accountant should have a UDIN (unique document Identification Number) generated through the ICAI (The Institute of chartered Accountants of India) Portal. Certificate without UDIN the documents uploaded will be considered and treated as invalid document. Attached are copies of financial statements (Auditors Report, Profit and Loss Statements, Balance Sheets, Form 240 of Sales Tax Returns / GST Annual Returns in the state of Karnataka & Relevant documents whichever is applicable in respective states, including all related notes and income statements) for the last FIVE Years.
The intending bidder can submit bids as an Individual/joint venture bidder should further demonstrate: Liquid assets and/or availability of credit facilities of not less than Rs. 413.7Lakhs credit lines/letter of credit/Certificates from banks) for meeting the fund requirement etc., (equivalent of the estimated cash flow for 3 months in the peak construction period) in the form of unconditional credit lines/ letter of credit/ certificate from any Nationalized Banks/ Scheduled Banks as per the format below. If the bid is submitted as joint venture, then any one partner/jointly should meet the requirement, Note: Liquid asset in the form of credit line/ letter of credit/ certificates from banks for meeting the fund requirement etc., shall be in the format appended with the bid document. Any conditional Banker Certificate will not be accepted and will lead to disqualification.
₹7,500
₹13.8 L
17 Oct 2026
17 Oct 2026
19 Nov 2026
2 Nov 2026
2 Nov 2026
Package No-32 Design, Build, Operate and Transfer (DBOT) of Interception and Diversion works in Periyapatna ULB of Mysuru District with 5 years operation and maintenance(including 2 year Defect liability period) under Swachh Bharat Mission (Urban)2.0 fund
PART- A(i): Design, supply, construction, installation, testing & commissioning of Interception and Diversion-01 (I&D)Unit including components but not limited to SS screens, Interception weir/barrier...
PART- A(ii): Design, supply, construction, installation, testing & commissioning of Interception and Diversion-02 (I&D)Unit including components but not limited to SS screens, Interception weir/barrie...
PART- A(iii): Design, supply, construction, installation, testing & commissioning of Interception and Diversion-03 (I&D)Unit including components but not limited to SS screens, Interception weir/barri...
Part-B: Operation & Maintenance of the facility for 5 years:Operation & Maintenance of Interception and Diversion Structure and Wetwell Structures and all other supporting facilities/ Infrastructure w...
Operation & Maintenance of Interception and Diversion Structure and Wetwell Structures and all other supporting facilities/ Infrastructure works built up under the package contract excluding power cha...
Operation & Maintenance of Interception and Diversion Structure and Wetwell Structures and all other supporting facilities/ Infrastructure works built up under the package contract excluding power cha...
Operation & Maintenance of Interception and Diversion Structure and Wetwell Structures and all other supporting facilities/ Infrastructure works built up under the package contract excluding power cha...
Operation & Maintenance of Interception and Diversion Structure and Wetwell Structures and all other supporting facilities/ Infrastructure works built up under the package contract excluding power cha...
Package No-32 Design, Build, Operate and Transfer (DBOT) of Interception and Diversion works in Krishnarajanagara ULB of Mysuru District with 5 years operation and maintenance(including 2 year Defect liability period) under Swachh Bharat Mission (Urban)2.0 fund
PART- A(i): Design, supply, construction, installation, testing & commissioning of Interception and Diversion-01 (I&D)Unit including components but not limited to SS screens, Interception weir/barrier...
PART- A(ii):Design, supply, construction, installation, testing & commissioning of Wet Well -01 with Electromechanical components such as Non-clog Sewage Pump sets and EOT crane, electrification, test...
PART- A(iii):Design, supply, construction, installation, testing & commissioning of rising main for a length as per site condition requirements, of Ductile Iron (K9 class) pipeline from Proposed Wet W...
PART- A(iv): Design, supply, construction, installation, testing & commissioning of Interception and Diversion-02 (I&D)Unit including components but not limited to SS screens, Interception weir/barrie...
PART- A(v):Design, supply, construction, installation, testing & commissioning of Wet Well -02 with Electromechanical components such as Non-clog Sewage Pump sets and EOT crane, electrification, testi...
PART- A(vi): Design, supply, construction, installation, testing & commissioning of Interception and Diversion-03 (I&D)Unit including components but not limited to SS screens, Interception weir/barrie...
PART- A(vii):Design, supply, construction, installation, testing & commissioning of rising main for a length as per site condition requirements, of Ductile Iron (K9 class) pipeline from Proposed Wet W...
PART- A(viii): Design, supply, construction, installation, testing & commissioning of Interception and Diversion-04 (I&D)Unit including components but not limited to SS screens, Interception weir/barr...
PART- A(ix): Design, supply, construction, installation, testing & commissioning of Interception and Diversion-05 (I&D)Unit including components but not limited to SS screens, Interception weir/barrie...
Part-B: Operation & Maintenance of the facility for 5 years:Operation & Maintenance of Interception and Diversion Structure and Wetwell Structures and all other supporting facilities/ Infrastructure w...
Operation & Maintenance of Interception and Diversion Structure and Wetwell Structures and all other supporting facilities/ Infrastructure works built up under the package contract excluding power cha...
Operation & Maintenance of Interception and Diversion Structure and Wetwell Structures and all other supporting facilities/ Infrastructure works built up under the package contract excluding power cha...
Operation & Maintenance of Interception and Diversion Structure and Wetwell Structures and all other supporting facilities/ Infrastructure works built up under the package contract excluding power cha...
Operation & Maintenance of Interception and Diversion Structure and Wetwell Structures and all other supporting facilities/ Infrastructure works built up under the package contract excluding power cha...
Package No-32 Design, Build, Operate and Transfer (DBOT) of Interception and Diversion works in Heggadadevankote ULB of Mysuru District with 5 years operation and maintenance(including 2 year Defect liability period) under Swachh Bharat Mission (Urban)2.0 fund
PART- A(i): Design, supply, construction, installation, testing & commissioning of Interception and Diversion-01 (I&D)Unit including components but not limited to SS screens, Interception weir/barrier...
PART- A(ii): Design, supply, construction, installation, testing & commissioning of Interception and Diversion-02 (I&D)Unit including components but not limited to SS screens, Interception weir/barrie...
PART- A(iii): Design, supply, construction, installation, testing & commissioning of Interception and Diversion-03 (I&D)Unit including components but not limited to SS screens, Interception weir/barri...
PART- A(iv): Design, supply, construction, installation, testing & commissioning of Interception and Diversion-04 (I&D)Unit including components but not limited to SS screens, Interception weir/barrie...
PART- A(v): Design, supply, construction, installation, testing & commissioning of Interception and Diversion-05 (I&D)Unit including components but not limited to SS screens, Interception weir/barrier...
PART- A(vi): Design, supply, construction, installation, testing & commissioning of Interception and Diversion-06 (I&D)Unit including components but not limited to SS screens, Interception weir/barrie...
PART- A(vii):Design, supply, construction, installation, testing & commissioning of gravity main for a length as per site condition requirements, of RCC NP3 pipeline from Proposed I&D to Wet Well i...
PART- A(viii):Design, supply, construction, installation, testing & commissioning of Wet Well -01 with Electromechanical components such as Non-clog Sewage Pump sets and EOT crane, electrification, te...
PART- A(ix):Design, supply, construction, installation, testing & commissioning of rising main for a length as per site condition requirements, of Ductile Iron (K9 class) pipeline from Proposed Wet We...
Part-B: Operation & Maintenance of the facility for 5 years:Operation & Maintenance of Interception and Diversion Structure and Wetwell Structures and all other supporting facilities/ Infrastructure w...
Operation & Maintenance of Interception and Diversion Structure and Wetwell Structures and all other supporting facilities/ Infrastructure works built up under the package contract excluding power cha...
Operation & Maintenance of Interception and Diversion Structure and Wetwell Structures and all other supporting facilities/ Infrastructure works built up under the package contract excluding power cha...
Operation & Maintenance of Interception and Diversion Structure and Wetwell Structures and all other supporting facilities/ Infrastructure works built up under the package contract excluding power cha...
Operation & Maintenance of Interception and Diversion Structure and Wetwell Structures and all other supporting facilities/ Infrastructure works built up under the package contract excluding power cha...
Package No-32 Design, Build, Operate and Transfer (DBOT) of Interception and Diversion works in Madikeri ULB of Kodagu District with 5 years operation and maintenance(including 2 year Defect liability period) under Swachh Bharat Mission (Urban)2.0 fund
PART- A(i): Design, supply, construction, installation, testing & commissioning of Interception and Diversion-01 (I&D)Unit including components but not limited to SS screens, Interception weir/barrier...
PART- A(ii):Design, supply, construction, installation, testing & commissioning of Wet Well -01 with Electromechanical components such as Non-clog Sewage Pump sets and EOT crane, electrification, test...
PART- A(iii):Design, supply, construction, installation, testing & commissioning of rising main for a length as per site condition requirements, of Ductile Iron (K9 class) pipeline from Proposed Wet W...
Part-B: Operation & Maintenance of the facility for 5 years:Operation & Maintenance of Interception and Diversion Structure and Wetwell Structures and all other supporting facilities/ Infrastructure w...
Operation & Maintenance of Interception and Diversion Structure and Wetwell Structures and all other supporting facilities/ Infrastructure works built up under the package contract excluding power cha...
Operation & Maintenance of Interception and Diversion Structure and Wetwell Structures and all other supporting facilities/ Infrastructure works built up under the package contract excluding power cha...
Operation & Maintenance of Interception and Diversion Structure and Wetwell Structures and all other supporting facilities/ Infrastructure works built up under the package contract excluding power cha...
Operation & Maintenance of Interception and Diversion Structure and Wetwell Structures and all other supporting facilities/ Infrastructure works built up under the package contract excluding power cha...
Package No-32 Design, Build, Operate and Transfer (DBOT) of Interception and Diversion works in Virajpet ULB of Kodagu District with 5 years operation and maintenance(including 2 year Defect liability period) under Swachh Bharat Mission (Urban)2.0 fund
PART- A(i): Design, supply, construction, installation, testing & commissioning of Interception and Diversion-01 (I&D)Unit including components but not limited to SS screens, Interception weir/barrier...
PART- A(ii):Design, supply, construction, installation, testing & commissioning of Wet Well -01 with Electromechanical components such as Non-clog Sewage Pump sets and EOT crane, electrification, test...
PART- A(iii):Design, supply, construction, installation, testing & commissioning of rising main for a length as per site condition requirements, of Ductile Iron (K9 class) pipeline from Proposed Wet W...
Part-B: Operation & Maintenance of the facility for 5 years:Operation & Maintenance of Interception and Diversion Structure and Wetwell Structures and all other supporting facilities/ Infrastructure w...
Operation & Maintenance of Interception and Diversion Structure and Wetwell Structures and all other supporting facilities/ Infrastructure works built up under the package contract excluding power cha...
Operation & Maintenance of Interception and Diversion Structure and Wetwell Structures and all other supporting facilities/ Infrastructure works built up under the package contract excluding power cha...
Operation & Maintenance of Interception and Diversion Structure and Wetwell Structures and all other supporting facilities/ Infrastructure works built up under the package contract excluding power cha...
Operation & Maintenance of Interception and Diversion Structure and Wetwell Structures and all other supporting facilities/ Infrastructure works built up under the package contract excluding power cha...
Package No-32 Design, Build, Operate and Transfer (DBOT) of Interception and Diversion works in Bogadi ULB of Mysuru District with 5 years operation and maintenance(including 2 year Defect liability period) under Swachh Bharat Mission (Urban)2.0 fund
PART- A(i): Design, supply, construction, installation, testing & commissioning of Interception and Diversion-01 (I&D)Unit including components but not limited to SS screens, Interception weir/barrier...
PART- A(ii): Design, supply, construction, installation, testing & commissioning of Interception and Diversion-02 (I&D)Unit including components but not limited to SS screens, Interception weir/barrie...
PART- A(iii):Design, supply, construction, installation, testing & commissioning of Wet Well -01 with Electromechanical components such as Non-clog Sewage Pump sets and EOT crane, electrification, tes...
PART- A(iv):Design, supply, construction, installation, testing & commissioning of rising main for a length as per site condition requirements, of Ductile Iron (K9 class) pipeline from Proposed Wet We...
Part-B: Operation & Maintenance of the facility for 5 years:Operation & Maintenance of Interception and Diversion Structure and Wetwell Structures and all other supporting facilities/ Infrastructure w...
Operation & Maintenance of Interception and Diversion Structure and Wetwell Structures and all other supporting facilities/ Infrastructure works built up under the package contract excluding power cha...
Operation & Maintenance of Interception and Diversion Structure and Wetwell Structures and all other supporting facilities/ Infrastructure works built up under the package contract excluding power cha...
Operation & Maintenance of Interception and Diversion Structure and Wetwell Structures and all other supporting facilities/ Infrastructure works built up under the package contract excluding power cha...
Operation & Maintenance of Interception and Diversion Structure and Wetwell Structures and all other supporting facilities/ Infrastructure works built up under the package contract excluding power cha...
Package No-32 Design, Build, Operate and Transfer (DBOT) of Interception and Diversion works in Rammanahalli ULB of Mysuru District with 5 years operation and maintenance(including 2 year Defect liability period) under Swachh Bharat Mission (Urban)2.0 fund
PART- A(i): Design, supply, construction, installation, testing & commissioning of Interception and Diversion-01 (I&D)Unit including components but not limited to SS screens, Interception weir/barrier...
PART- A(ii):Design, supply, construction, installation, testing & commissioning of Wet Well -01 with Electromechanical components such as Non-clog Sewage Pump sets and EOT crane, electrification, test...
PART- A(iii):Design, supply, construction, installation, testing & commissioning of rising main for a length as per site condition requirements, of Ductile Iron (K9 class) pipeline from Proposed Wet W...
PART- A(iv): Design, supply, construction, installation, testing & commissioning of Interception and Diversion-02 (I&D)Unit including components but not limited to SS screens, Interception weir/barrie...
PART- A(v):Design, supply, construction, installation, testing & commissioning of Wet Well -02 with Electromechanical components such as Non-clog Sewage Pump sets and EOT crane, electrification, testi...
PART- A(vi):Design, supply, construction, installation, testing & commissioning of rising main for a length as per site condition requirements, of Ductile Iron (K9 class) pipeline from Proposed Wet We...
PART- A(vii):Design, supply, construction, installation, testing & commissioning of rising main for a length as per site condition requirements, of Ductile Iron (K9 class) pipeline from Proposed I&D-3...
Part-B: Operation & Maintenance of the facility for 5 years:Operation & Maintenance of Interception and Diversion Structure and Wetwell Structures and all other supporting facilities/ Infrastructure w...
Operation & Maintenance of Interception and Diversion Structure and Wetwell Structures and all other supporting facilities/ Infrastructure works built up under the package contract excluding power cha...
Operation & Maintenance of Interception and Diversion Structure and Wetwell Structures and all other supporting facilities/ Infrastructure works built up under the package contract excluding power cha...
Operation & Maintenance of Interception and Diversion Structure and Wetwell Structures and all other supporting facilities/ Infrastructure works built up under the package contract excluding power cha...
Operation & Maintenance of Interception and Diversion Structure and Wetwell Structures and all other supporting facilities/ Infrastructure works built up under the package contract excluding power cha...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
package 32 drawings_package 32 drawings_Bogadi_doc02570320261005175518.pdf
Others - Drawings • 0.50 MB
package 32 drawings_package 32 drawings_Bogadi_doc02570420261005175539.pdf
Others - Drawings • 0.56 MB
package 32 drawings_package 32 drawings_Bogadi_doc02570520261005175604.pdf
Others - Drawings • 0.51 MB
package 32 drawings_package 32 drawings_Bogadi_doc02570620261005175626.pdf
Others - Drawings • 0.45 MB
package 32 drawings_package 32 drawings_Bogadi_doc02570820261005175656.pdf
Others - Drawings • 0.56 MB
package 32 drawings_package 32 drawings_Bogadi_doc02570920261005175723.pdf
Others - Drawings • 0.68 MB
package 32 drawings_package 32 drawings_Bogadi_doc02571020261005175757.pdf
Others - Drawings • 0.59 MB
package 32 drawings_package 32 drawings_Bogadi_doc02571120261005175825.pdf
Others - Drawings • 0.87 MB
package 32 drawings_package 32 drawings_Bogadi_doc02571220261005175859.pdf
Others - Drawings • 0.72 MB
package 32 drawings_package 32 drawings_H.D.Kote_doc02563620261005130614.pdf
Others - Drawings • 0.56 MB
package 32 drawings_package 32 drawings_H.D.Kote_doc02563720261005130636.pdf
Others - Drawings • 0.54 MB
package 32 drawings_package 32 drawings_H.D.Kote_doc02563820261005130657.pdf
Others - Drawings • 0.53 MB
package 32 drawings_package 32 drawings_H.D.Kote_doc02563920261005130759.pdf
Others - Drawings • 0.46 MB
package 32 drawings_package 32 drawings_H.D.Kote_doc02564020261005130829.pdf
Others - Drawings • 0.39 MB
package 32 drawings_package 32 drawings_H.D.Kote_doc02564120261005130854.pdf
Others - Drawings • 0.49 MB
package 32 drawings_package 32 drawings_H.D.Kote_doc02564220261005130918.pdf
Others - Drawings • 0.52 MB
package 32 drawings_package 32 drawings_H.D.Kote_doc02564320261005130956.pdf
Others - Drawings • 0.43 MB
package 32 drawings_package 32 drawings_H.D.Kote_doc02564420261005131018.pdf
Others - Drawings • 0.35 MB
package 32 drawings_package 32 drawings_H.D.Kote_doc02564520261005131050.pdf
Others - Drawings • 0.51 MB
package 32 drawings_package 32 drawings_H.D.Kote_doc02564620261005131121.pdf
Others - Drawings • 0.58 MB
package 32 drawings_package 32 drawings_H.D.Kote_doc02564720261005131144.pdf
Others - Drawings • 0.79 MB
package 32 drawings_package 32 drawings_H.D.Kote_doc02564820261005131205.pdf
Others - Drawings • 0.50 MB
package 32 drawings_package 32 drawings_H.D.Kote_doc02564920261005131230.pdf
Others - Drawings • 0.83 MB
package 32 drawings_package 32 drawings_k.r.nagra_doc02567120261005141820.pdf
Others - Drawings • 0.52 MB
package 32 drawings_package 32 drawings_k.r.nagra_doc02567220261005141842.pdf
Others - Drawings • 0.55 MB
package 32 drawings_package 32 drawings_k.r.nagra_doc02567320261005141906.pdf
Others - Drawings • 0.56 MB
package 32 drawings_package 32 drawings_k.r.nagra_doc02567420261005141927.pdf
Others - Drawings • 0.59 MB
package 32 drawings_package 32 drawings_k.r.nagra_doc02567520261005141948.pdf
Others - Drawings • 0.62 MB
package 32 drawings_package 32 drawings_k.r.nagra_doc02567620261005142011.pdf
Others - Drawings • 0.61 MB
package 32 drawings_package 32 drawings_k.r.nagra_doc02567720261005142034.pdf
Others - Drawings • 0.94 MB
package 32 drawings_package 32 drawings_k.r.nagra_doc02567820261005142056.pdf
Others - Drawings • 0.66 MB
package 32 drawings_package 32 drawings_k.r.nagra_doc02567920261005142117.pdf
Others - Drawings • 0.84 MB
package 32 drawings_package 32 drawings_MADIKERI_alignment +cs madikeri.pdf
Others - Drawings • 0.58 MB
package 32 drawings_package 32 drawings_MADIKERI_I&d.pdf
Others - Drawings • 0.74 MB
package 32 drawings_package 32 drawings_MADIKERI_WET WELL.pdf
Others - Drawings • 0.73 MB
package 32 drawings_package 32 drawings_MADIKERI_WW.pdf
Others - Drawings • 0.55 MB
package 32 drawings_package 32 drawings_Periyapatna_doc02566720261005141219.pdf
Others - Drawings • 0.58 MB
package 32 drawings_package 32 drawings_Periyapatna_doc02566820261005141242.pdf
Others - Drawings • 0.56 MB
package 32 drawings_package 32 drawings_Periyapatna_doc02567020261005141725.pdf
Others - Drawings • 0.56 MB
package 32 drawings_package 32 drawings_Rammanahalli_doc02571320261005180221.pdf
Others - Drawings • 0.45 MB
package 32 drawings_package 32 drawings_Rammanahalli_doc02571420261005180244.pdf
Others - Drawings • 0.42 MB
package 32 drawings_package 32 drawings_Rammanahalli_doc02571520261005180309.pdf
Others - Drawings • 0.49 MB
package 32 drawings_package 32 drawings_Rammanahalli_doc02571620261005180328.pdf
Others - Drawings • 0.46 MB
package 32 drawings_package 32 drawings_Rammanahalli_doc02571720261005180403.pdf
Others - Drawings • 0.53 MB
package 32 drawings_package 32 drawings_Rammanahalli_doc02571820261005180420.pdf
Others - Drawings • 0.49 MB
package 32 drawings_package 32 drawings_Rammanahalli_doc02571920261005180443.pdf
Others - Drawings • 0.56 MB
package 32 drawings_package 32 drawings_Rammanahalli_doc02572020261005180504.pdf
Others - Drawings • 0.58 MB
package 32 drawings_package 32 drawings_Rammanahalli_doc02572120261005180532.pdf
Others - Drawings • 0.49 MB
package 32 drawings_package 32 drawings_Rammanahalli_doc02572320261005180606.pdf
Others - Drawings • 0.60 MB
package 32 drawings_package 32 drawings_Rammanahalli_doc02572420261005180633.pdf
Others - Drawings • 0.86 MB
package 32 drawings_package 32 drawings_Rammanahalli_doc02572520261005180659.pdf
Others - Drawings • 0.71 MB
package 32 drawings_package 32 drawings_Virajpet_ALIGNMENT +CS VIRAJPET.pdf
Others - Drawings • 0.59 MB
package 32 drawings_package 32 drawings_Virajpet_doc02445720260921114948.pdf
Others - Drawings • 0.75 MB
package 32 drawings_package 32 drawings_Virajpet_ww.pdf
Others - Drawings • 0.54 MB
BD for PKG 32.docx
Tender Document • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .