| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-AOC AT HAZARIMORE P O HAZARI GOMIA DISTT BOKARO JHARKHAND 829128 | GOMIA | BOKARO | JHARKHAND | 829128 | ₹2.9 L | L1 | Accepted-AOC All documents submitted and found O.K. Comparative lower rate. |
| 2 | L2₹2.9 LRejected-Finance | ₹2.9 L | L2 | Rejected-Finance Comparative higher rate |
| 3 | Rejected-Technical | - | - | Rejected-Technical Even after shortfall notice bidder has not submitted relevant work experience certificate similar to the tendered work as per NIT |
| Sl No | Description | Qty | Unit | M/S SHRI SHYAM ENTERPRISES L1 | MAA ENGINEERING AND CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.01 | A. Repairing / reconditioning 110KW, 990RPM, 415Volts, 50Hz. 3Ph sq. cage induction motor's end cover of Sawang Washery x 02 nos. of repairing of both side end cover x 03 set i. CI Electrode 4mm machinable x 03Kg. for each | 18 | Kg. | 5,200 ₹93,600 | 5,220 ₹93,960 |
| 1.02 | ii. End cover welding & machinable x both side end cover x 03 set | 6 | set | 3,000 ₹18,000 | 3,020 ₹18,120 |
| 1.03 | B. Repairing / reconditioning 63KW, 1460RPM, 415Volts, 50Hz. 3Ph sq. cage induction motor's end cover of Sawang Washery x x 02 nos. of repairing of both side end cover x 03 set i. CI Electrode 4mm machinable x 2.5Kg. each | 15 | Kg. | 5,200 ₹78,000 | 5,220 ₹78,300 |
| 1.04 | ii. End cover welding & machinable x both side end cover x 03 set | 6 | set | 3,000 ₹18,000 | 3,020 ₹18,120 |
| 1.05 | C. Repairing / reconditioning 48KW, 1460RPM, 415Volts, 50Hz. 3Ph sq. cage induction motor's end cover of Sawang Washery x x 02 nos. of repairing of both side end cover x 03 set i. CI Electrode 4mm machinable x 2Kg. each | 12 | Kg. | 5,200 ₹62,400 | 5,220 ₹62,640 |
| 1.06 | ii. End cover welding & machinable x both side end cover x 03 set | 6 | set | 2,500 ₹15,000 | 2,520 ₹15,120 |
| 2.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - |
Tender Value
₹3.4 L
EMD Value
₹4,300
Closing Date
14 Feb 2026, 11:00 amClosed
Abhijeet Mahto, Sr. Manager(EnM), SawangWashery
Office of the Project Officer, Sawang Washery
Complete repairing / reconditioning of 03 nos. 110KW, 03 nos. 63KW and 03 nos. 48KW, 415 Volt, 3Ph, 50Hz. Sq. cage induction motors end cover of Sawang Washery.
2026_CCL_352401_1
SGW/KTA/ENM/E-Tender/25-26/75 Date 04.02.2026
Open Tender
Electrical and Maintenance Works
10 days
Office of the Project Officer, Sawang Washery
Please refer Tender documents.
9 documents required · 9 mandatory
₹4,300
11 Mar 2026
4 Feb 2026
16 Feb 2026
5 Feb 2026
14 Feb 2026
5 Feb 2026
5 Feb 2026 - 11 Feb 2026
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB