Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.9 CrAdmitted-Finance | -32.50% | ₹3.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.1 Cr+₹25.7 L (6.67%)Admitted-Finance | -28.00% | ₹4.1 Cr+₹25.7 L (6.67%) | L2 | Admitted-Finance |
| 3 | L3₹4.5 Cr+₹67.9 L (17.6%)Admitted-Finance | -20.60% | ₹4.5 Cr+₹67.9 L (17.6%) | L3 | Admitted-Finance |
| 4 | L4₹4.7 Cr+₹88.5 L (23.0%)Admitted-Finance | -17.00% | ₹4.7 Cr+₹88.5 L (23.0%) | L4 | Admitted-Finance |
| 5 | L5₹4.8 Cr+₹94.4 L (24.5%)Admitted-Finance CHALIHA NAGAR DIST TINSUKIA ASSAM | TINSUKIA | ASSAM | -15.97% | ₹4.8 Cr+₹94.4 L (24.5%) | L5 | Admitted-Finance |
Tender Value
₹5.7 Cr
EMD Value
₹11.4 L
Closing Date
21 May 2026, 4:00 pmClosed
Dy. Commandant Engineer, SHQ DBRG ITBP
SHQ Dibrugarh, ITBP, Mohanbari Assam
Construction of Coy office,Mi room ,WT Office, Store, Quarter guard , boundry wall At Forward area of 9th Bn ITBP Arunachal Pradesh
2026_ITBP_907147_1
ITBP/SHQDBRG/ENGR/9BN/CLG/2026
Open Tender
Construction Works
Percentage
730 days
Chaglohagom forward area of Anjaw district Ar. P
As per tender documents
2 documents required · 2 mandatory
₹0
₹11.4 L
21 Aug 2026
1 May 2026
22 May 2026
1 May 2026
21 May 2026
1 May 2026
1 May 2026 - 21 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation over areas (exceeding 30 cm in depth 1.5 m in width as well as 10 Sqm in plan) including disposal of excavated earth, lead up to 50 m, disposed earth to be levelled and neatly dressed: All kinds of soil | 217.18 | Cum | 305 | ₹66,239.9 |
| 2 | Earth work in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. Orinary rock | 534.1 | Cum | 623 | ₹3,32,744.3 |
| 3 | Filling available excavated earth ( excluding rocks) in plinth side of foundation, under floors in layers not exceeding 20 cm in depth including, watering, ramming consolidating and dressing completelead up to 50 m and lift up to 1.5 m, | 131.56 | Cum | 147 | ₹19,339.32 |
| 4 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 375 | Sqm | 13 | ₹4,875 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:5:10 (1 Cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 104.24 | Cum | 16,743 | ₹17,45,290.32 |
| 6 | Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20 mm nominal size) over 75 mm bed by dry brick ballast 40 mm nominal size well rammed and consolidated and grouted with fine sand including finishing the top smooth | 104.23 | Sqm | 1,426 | ₹1,48,631.98 |
| 7 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 209.02 | Cum | 22,471 | ₹46,96,888.42 |
| 8 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand(zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 62.36 | Cum | 24,043 | ₹14,99,321.48 |
| 9 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-Ill) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 95.18 | Cum | 24,505.65 | ₹23,32,447.77 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings and bases for columns. | 429.31 | Sqm | 316 | ₹1,35,661.96 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.83 MB
BOQ_953483.xls
BOQ • 0.34 MB
TenderDocChhaglagam.pdf
Tender Documents • 0.79 MB
Corrigendum.pdf
PDF • 0.75 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .