| # | Company | Amount | Status |
|---|---|---|---|
| 1 | M/s. Siemens Ltd. ₹236.1 Cr | - | |
| 2 | Not Qualified | Not Qualified | |
| 3 | Qualified | Qualified | |
| 4 | Qualified | Qualified | |
| 5 | Not Qualified | Not Qualified |
Tender Value
Refer Docs
EMD Value
₹5.3 Cr
Closing Date
25 Aug 2020, 11:00 amClosed
Kaushalendra Singh
Power Grid Corporation of India Limited Saudamini, 3rd Floor, Plot No.-2, Sector-29 Gurgaon (Haryana) - 122001.
STATCOM Package-II for STATCOM at 400kV Bhadla-II PS associated with Transmission System Strengthening Scheme for Evacuation of Power from Solar Energy Zones in Rajasthan (8.1GW) under Phase-II-Part B1
CC-CS/997-NR1/STATCOM-4124/3/G3
Open
Power/Energy Projects/Products
Turn-key
Rajasthan State
₹25,000
₹5.3 Cr
30 Jun 2021
11 May 2020
27 Aug 2020
11 May 2020
25 Aug 2020
11 May 2020
18 May 2020
400kV Fatehgarh-II PS
Part-A
STATCOM( ±300MVAR as per Technical Specification) including Valve, valve base electronics, DC capacitor, series reactor and all accessories
Valve complete with all accessories for STATCOM Unit ( ± 300MVAr)
Series reactor for STATCOM Unit
MV Switchgear for STATCOM Unit
MV Switchgear for STATCOM Unit including bypass switch
Charging Resistor
Instrument Transformers for STATCOM Unit
Bus work for STATCOM Unit
Wall Bushings
Prefabricated container for housing Valve, relay & control panels, valve cooling system etc. (If applicable)
Mechanically switched Reactor bank (3-ph) (-125MVAR as per Technical Specification) including all accessories (MSR Branches) (As per Technical Specification)
Air Core Reactor
MV Switchgear
Instrument Transformers
Bus work for MSR
Mechanically switched Capacitor bank(3-ph) (125MVAR as per Technical Specification) including all accessories (MSC Branches) (As per Technical Specification)
Capacitor Bank
Series Air core reactor
MV Switchgear
Instrument Transformers
Bus work for MSC
STATCOM Valve cooling system
Cooling system pump skid
Water to air Heat Exchanger
Cooling system pipes, valves etc.
SYSTEM STUDIES as per Tech Spec.
Coupling Transformer Bank (1 set corresponds to three single phase units or single three phase unit)
Coupling Transformer
Insulating oil for above
Online Dissolved Gas and Moisture Analyser {As per Technical Specification}
On-line insulating oil drying system {As per Technical Specification}
STATCOM STATION Control, Protection, Monitoring & Automation system (As per Specification)
STATCOM Control Cabinet & Fault Recorder for STATCOM
STATCOM Station control , Protection , Monitoring & Automation System including Fault Recorder for STATCOM
Bus work
MV Bus work Including Neutral Grounding Transformer (if applicable), Surge Capacitor, Swithgear, Post Insulators, Bus Bar Material, Clamps ,Connectors, Earthing Material etc including all accessories.
HV Bus work including conductor, Post Insulator, insulator hardware, hardware string, spacers, clamps, connectors, earthing material etc. including all accessories to connect STATCOM Station coupling Transformer to take off gantry of 400 kV switchyard.
Erection hardware items & other miscellaneous item for STATCOM Station installation (if not covered under any head)
Lattice & pipe structures for STATCOM Station installations including pack plates/ packwashers and gusset plates, fasteners and foundation bolts.
Lattice Strctures
Pipe Structures
Special Tools and Tackles as per Technical Specification (excluding those covered T&P listed in Section-Project of TS)
Custom Tansport Trolley for STATCOM Power Module
Erection Hardware (400 kV Switchyard upto take of gantry)
Insulator strings, Disc Insulators, Hardware, Spacers, conductor(s), bus-bar material, cable trays, Bay MB, clamps, connectors including equipment connectors, junction box, earthwire, earthing material,insulating mat, risers, auxiliary earthmat (excluding main earthmat), pipes for equipment & lighting, all accessories etc. for the following
Layout Type (400kV I-type)
Bus Post Insulator
Illumination system
Illumination for STATCOM Station installation
Illumination for STATCOM Station buildings
Illumination system for 400kV switchyard extension area
Electrical station services & auxiliaries systems
415V Main switchboard
415V AC distribution board
220V DC distribution board
220V Battery system
220V Battery charger
Main Lighting distribution board
Emergency Lighting distribution board
UPS/UMD for STATCOM Station systems
Auxiliary Service transformer xx kV / 415 V; 630 kVA; uk = 5%
XXkV Circuit breaker (3-Phase)
XXkV Isolator with one earth switch (3-phase)
XXkV Current transformer (1-phase)
XXkV Potential transformer (1-phase)
415 V, Voltage Stabilizer as per Technical Specification
Erection hardware items, Bus post insulators, clamps and Connectors, Structures & other miscellaneous item for LT transformer(s) installation
DG Set
LT Cabling along with associated like clamps, glands, lugs and straight joints etc.
40 mm MS rod for Earth mat
Mechanical station services & auxiliaries systems
Fire protection system
Air conditioning & ventilation system
Castle Key Interlock System for STATCOM Station as per Tech Spec.
VMS for STATCOM Station
Civil Works (AS PER CONTRACTOR DRAWING)
The rates shall be inclusive of designs, drawings, engineering, civil works including excavation in all type soils, PCC, RCC, Reinforcement, structural steel, internal and external cable trenches, internal and external finishes, floorings, doors & windows, electrical conduit, etc. complete in all respects as per requirement of technical specification and tender documents. Walkways, rail, foundation bolts, crane, internal and external water supply, drains, sewerage system, soak pit & septic tank etc if any required for completion of work shall also be included in the rates. Nothing extra shall be payable on this account.
STATCOM Buildings
Coupling transformers including rail track, fire barrier wall, jacking pad etc
Mechanically switched Reactor Branches
Mechanically switched Capacitor Branches
STATCOM Station yard equipments
Cable trench for STATCOM station yard including connecting, dismantling and re routing of existing trenches if required.
Drains in the proposed area of STATCOM, using standard sections of POWERGRID including connecting, dismantling and re routing of existing drains if required.
Other STATCOM Station associated auxiliary systems
XX/0.415kV LT transformer and all other XX kV equipment and BPI foundations
DG set foundation
Concrete roads (3.75m wide) including all crossings for STATCOM station yard using POWERGRID standard sections and rerouting of existing roads and culverts if required
Stone filling (40 mm size) for transformer/reactor foundation
Stone spreading for STATCOM station yard including PCC (1:5:10) finished with cement slurry and Anti weed Treatment
New Chain link fencing including gate in the STATCOM area including dismantling, re erection, re routing of the existing fence if required
TYPE TESTING FOR THE FOLLOWING STATCOM Station EQUIPMENTS (As per Specification)
Part-B
Circuit breakers (3 Phase)
Instrument Transformer (1 Phase)
CT 2000/1; 6 cores; 50kA with 120% extended current rating (1-phase)
400kV Potential Transformer (Single Phase)
Isolators with support Insulator
Surge Arrester (Gapless-336kV) (1-phase)
Control & Relay Panels
Circuit Breaker Relay Panel
Substation automation system
Augmentation of existing Substation automation system for the STATCOM Station and associated 3 nos. 400kV bays under present scope , upgradation of hardware and sofware and updation of dabase etc for completion of SAS augmentationas per technical specification
Structure
Lattice structure
Pipe Structure(Standard Structures for 400kV Equipments mentioned below)
Foundation Bolts
Non Standard Structure
Electrical auxiliaries supply systems (from existing ICT Tertiary)
Auxiliary Service transformer 33 kV / 433 V; 630 kVA
66kV Circuit breaker (3-Phase)
66kV Isolator without earth switch (3-phase)
66kV Current transformer (1-phase)
66kV Potential transformer (1-phase)
Support structures for above 66kV Switchgear equipments
72.5kV BPI
Erection hardware (Al tube, clamps, spacers, connectors, earthing material risers, auxiliary earthmat, buried cable trenches/pipes, BPIs all accessories etc for extension of 52kV teritary bus of 765/400/33kV autotransformer)
Sub-station Operation and Maintenance T&P as per Technical Specification Annexure-III
Test Equipment for Semiconductor Power Module
Toolkit to replace the Power Module of Statcom Valve
All substtsion Operation and Maintennce T&P as per Specification
Civil works as per Technical Specification and Employer supplied drawings
xviii)
xxiii)
Mandatory Spares for STATCOM & 400 kV Bay Equipment (as per Annexure-I of Section Project)
STATCOM Valve
Module for Control, Protection, Communication, Annunciation, Alarm, SCADA & Monitoring, Disturbance Recorder including Power Supply Module
STATCOM Protection system Relays.
400 kV bay Protection system Spares.
Valve Hall Equipment
Coupling Transformer
Filter Bank
MSC Bank
MSR Bank
MV AC System
Cooling Water System
Fire Protection System
220 V Batteries
220 V Battery Chargers
DG Set
LT Switchgear
Air Conditioning and Ventilation System
Clamps and connectors
400 kV Circuit breakers
400 kV Isolators
336 kV Surge Arresters
TRAINING
Structure (Supply)
Foundation Bolts
Non Standard Structure
Spec. No.
Bill of Quantity for STATCOM Package-II for STATCOM at 400kV Bhadla-II PS associated with Transmission System Strengthening Scheme for Evacuation of Power from Solar Energy Zones in Rajasthan (8.1GW) under Phase-II-Part B1.
To, Power Grid Corporation of India Ltd.“Saudamini”, Plot No.2, Sector-29, Gurgaon, Haryana - 122 001
Bidder's Name & Address :
Name of Substation
400kV Bhadla-II PS
Part-A
STATCOM( ±300MVAR as per Technical Specification) including Valve, valve base electronics, DC capacitor, series reactor and all accessories
Valve complete with all accessories for STATCOM Unit ( ± 300MVAr)
Series reactor for STATCOM Unit
MV Switchgear for STATCOM Unit
MV Switchgear for STATCOM Unit including bypass switch
Charging Resistor
Instrument Transformers for STATCOM Unit
Bus work for STATCOM Unit
Wall Bushings
Prefabricated container for housing Valve, relay & control panels, valve cooling system etc. (If applicable)
Mechanically switched Reactor bank (3-ph) (-125MVAR as per Technical Specification) including all accessories (MSR Branches) (As per Technical Specification)
Air Core Reactor
MV Switchgear
Instrument Transformers
Bus work for MSR
Mechanically switched Capacitor bank(3-ph) (125MVAR as per Technical Specification) including all accessories (MSC Branches) (As per Technical Specification)
Capacitor Bank
Series Air core reactor
MV Switchgear
Instrument Transformers
Bus work for MSC
STATCOM Valve cooling system
Cooling system pump skid
Water to air Heat Exchanger
Cooling system pipes, valves etc.
SYSTEM STUDIES as per Tech Spec.
Coupling Transformer Bank (1 set corresponds to three single phase units or single three phase unit)
Coupling Transformer
Insulating oil for above
Online Dissolved Gas and Moisture Analyser {As per Technical Specification}
On-line insulating oil drying system {As per Technical Specification}
STATCOM STATION Control, Protection, Monitoring & Automation system (As per Specification)
STATCOM Control Cabinet & Fault Recorder for STATCOM
STATCOM Station control , Protection , Monitoring & Automation System including Fault Recorder for STATCOM
Bus work
MV Bus work Including Neutral Grounding Transformer (if applicable), Surge Capacitor, Swithgear, Post Insulators, Bus Bar Material, Clamps ,Connectors, Earthing Material etc including all accessories.
HV Bus work including conductor, Post Insulator, insulator hardware, hardware string, spacers, clamps, connectors, earthing material etc. including all accessories to connect STATCOM Station coupling Transformer to take off gantry of 400 kV switchyard.
Erection hardware items & other miscellaneous item for STATCOM Station installation (if not covered under any head)
Lattice & pipe structures for STATCOM Station installations including pack plates/ packwashers and gusset plates, fasteners and foundation bolts.
Lattice Strctures
Pipe Structures
Special Tools and Tackles as per Technical Specification (excluding those covered T&P listed in Section-Project of TS)
Custom Tansport Trolley for STATCOM Power Module
Erection Hardware (400 kV Switchyard upto take of gantry)
Insulator strings, Disc Insulators, Hardware, Spacers, conductor(s), bus-bar material, cable trays, Bay MB, clamps, connectors including equipment connectors, junction box, earthwire, earthing material,insulating mat, risers, auxiliary earthmat (excluding main earthmat), pipes for equipment & lighting, all accessories etc. for the following
Layout Type (400kV I-type)
Bus Post Insulator
Illumination system
Illumination for STATCOM Station installation
Illumination for STATCOM Station buildings
Illumination system for 400kV switchyard extension area
Electrical station services & auxiliaries systems
415V Main switchboard
415V AC distribution board
220V DC distribution board
220V Battery system
220V Battery charger
Main Lighting distribution board
Emergency Lighting distribution board
UPS/UMD for STATCOM Station systems
Auxiliary Service transformer xx kV / 415 V; 630 kVA; uk = 5%
XXkV Circuit breaker (3-Phase)
XXkV Isolator with one earth switch (3-phase)
XXkV Current transformer (1-phase)
XXkV Potential transformer (1-phase)
415 V, Voltage Stabilizer as per Technical Specification
Erection hardware items, Bus post insulators, clamps and Connectors, Structures & other miscellaneous item for LT transformer(s) installation
DG Set
LT Cabling along with associated like clamps, glands, lugs and straight joints etc.
40 mm MS rod for Earth mat
Mechanical station services & auxiliaries systems
Fire protection system
Air conditioning & ventilation system
Castle Key Interlock System for STATCOM Station as per Tech Spec.
VMS for STATCOM Station
Civil Works (AS PER CONTRACTOR DRAWING)
The rates shall be inclusive of designs, drawings, engineering, civil works including excavation in all type soils, PCC, RCC, Reinforcement, structural steel, internal and external cable trenches, internal and external finishes, floorings, doors & windows, electrical conduit, etc. complete in all respects as per requirement of technical specification and tender documents. Walkways, rail, foundation bolts, crane, internal and external water supply, drains, sewerage system, soak pit & septic tank etc if any required for completion of work shall also be included in the rates. Nothing extra shall be payable on this account.
STATCOM Buildings
Coupling transformers including rail track, fire barrier wall, jacking pad etc
Mechanically switched Reactor Branches
Mechanically switched Capacitor Branches
STATCOM Station yard equipments
Cable trench for STATCOM station yard including connecting, dismantling and re routing of existing trenches if required.
Drains in the proposed area of STATCOM, using standard sections of POWERGRID including connecting, dismantling and re routing of existing drains if required.
Other STATCOM Station associated auxiliary systems
XX/0.415kV LT transformer and all other XX kV equipment and BPI foundations
DG set foundation
Concrete roads (3.75m wide) including all crossings for STATCOM station yard using POWERGRID standard sections and rerouting of existing roads and culverts if required
Stone filling (40 mm size) for transformer/reactor foundation
Stone spreading for STATCOM station yard including PCC (1:5:10) finished with cement slurry and Anti weed Treatment
New Chain link fencing including gate in the STATCOM area including dismantling, re erection, re routing of the existing fence if required
TYPE TESTING FOR THE FOLLOWING STATCOM Station EQUIPMENTS (As per Specification)
Part-B
Circuit breakers (3 Phase)
Instrument Transformer (1 Phase)
CT 2000/1; 6 cores; 50kA with 120% extended current rating (1-phase)
400kV Potential Transformer (Single Phase)
Isolators with support Insulator
Surge Arrester (Gapless-336kV) (1-phase)
Control & Relay Panels
Circuit Breaker Relay Panel
Substation automation system
Augmentation of existing Substation automation system for the STATCOM Station and associated 3 nos. 400kV bays under present scope , upgradation of hardware and sofware and updation of dabase etc for completion of SAS augmentationas per technical specification
Structure
Lattice structure
Pipe Structure(Standard Structures for 400kV Equipments mentioned below)
Foundation Bolts
Non Standard Structure
Electrical auxiliaries supply systems (from existing ICT Tertiary)
Auxiliary Service transformer 33 kV / 433 V; 630 kVA
66kV Circuit breaker (3-Phase)
66kV Isolator without earth switch (3-phase)
66kV Current transformer (1-phase)
66kV Potential transformer (1-phase)
Support structures for above 66kV Switchgear equipments
72.5kV BPI
Erection hardware (Al tube, clamps, spacers, connectors, earthing material risers, auxiliary earthmat, buried cable trenches/pipes, BPIs all accessories etc for extension of 52kV teritary bus of 765/400/33kV autotransformer)
Sub-station Operation and Maintenance T&P as per Technical Specification Annexure-III
Test Equipment for Semiconductor Power Module
Toolkit to replace the Power Module of Statcom Valve
All substtsion Operation and Maintennce T&P as per Specification
Civil works as per Technical Specification and Employer supplied drawings
xviii)
xxiii)
Mandatory Spares for STATCOM & 400 kV Bay Equipment (as per Annexure-I of Section Project)
STATCOM Valve
Module for Control, Protection, Communication, Annunciation, Alarm, SCADA & Monitoring, Disturbance Recorder including Power Supply Module
STATCOM Protection system Relays.
400 kV bay Protection system Spares.
Valve Hall Equipment
Coupling Transformer
Filter Bank
MSC Bank
MSR Bank
MV AC System
Cooling Water System
Fire Protection System
220 V Batteries
220 V Battery Chargers
DG Set
LT Switchgear
Air Conditioning and Ventilation System
Clamps and connectors
400 kV Circuit breakers
400 kV Isolators
336 kV Surge Arresters
TRAINING
Structure (Supply)
Foundation Bolts
Non Standard Structure
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html
00 - Cover Page.doc
doc • 0.63 MB
1-Volume I _ Section - I IFB.docx
docx • 0.04 MB
2-Volume I _ Section - II ITB Two Stage S&I Rev 2-for e-pro.docx
docx • 0.15 MB
3-Volume I _ Section - III BDS.docx
docx • 0.13 MB
4-Volume I_Annexure-A-BDS.docx
docx • 0.04 MB
4-Volume-I_Annexure-B to BDS.DOCX
docx • 0.02 MB
4-Volume-I_Annexure-C(BDS).docx
docx • 0.02 MB
4-Volume-I_Annexure-D to BDS.DOCX
docx • 0.03 MB
5-Volume-I_Section - IV GCC -S&I Rev 3-GCB.pdf
pdf • 1.95 MB
6-Volume I _ Section - V SCC SSTE Vol-I.doc
doc • 0.15 MB
7-Volume I _Annexure-I to SCC.docx
docx • 0.08 MB
7-Volume I _Appendix -I to SCC.doc
doc • 0.41 MB
8-Volume-I_Section-VI - Sample Forms and Procedure.doc
doc • 0.92 MB
TS Part-I.7z
7z • 12.15 MB
TS Part-II.7z
7z • 7.67 MB
TS Part-III.7z
7z • 5.50 MB
TS Part-IV.7z
7z • 8.09 MB
1 Rail Cum Road.pdf
pdf • 1.30 MB
2 CABLE TRENCH & CROSSING DETAILS.pdf
pdf • 0.63 MB
3 4 RCC Road-TS 10.pdf
pdf • 2.81 MB
5 Raod Culvert (TS-10).pdf
pdf • 1.50 MB
6 7 Drain (TS-10).pdf
pdf • 2.24 MB
8 Switchyard Chain Link Fencing (TS-10).pdf
pdf • 1.44 MB
9 Switchyard Gate (TS-10).pdf
pdf • 1.20 MB
10 474058-220kv 2LM(SH.1 OF 4).pdf
pdf • 5.91 MB
11 474058-220kv 2LM(SH.2 OF 4).pdf
pdf • 5.35 MB
12 474058-220kv 2LM(SH.3 OF 4).pdf
pdf • 4.78 MB
13 474058-220kv 2LM(SH.4 OF 4).pdf
pdf • 4.73 MB
14 474001-400kv 4BPI(SH.1 OF 1).pdf
pdf • 0.56 MB
15 474002-400kv 4WT(SH.1 OF 1).pdf
pdf • 0.58 MB
16 474003-400kv 4CVT(SH.1 OF 1).pdf
pdf • 0.66 MB
17 474004-400kv 4LA(SH.1 OF 1).pdf
pdf • 0.59 MB
18 474005-400kv 4ISO(SH.1 OF 1).pdf
pdf • 0.71 MB
19 474006-400kv 4CT(SH.1 OF 1).pdf
pdf • 0.60 MB
20 Bhadla-II Soil report.pdf
pdf • 7.08 MB
22 foundation bolt 28 mm.pdf
pdf • 0.08 MB
23 foudnation bolt 56 mm.pdf
pdf • 0.10 MB
21.1 Fatehgarh-II Soil Report-1-40.pdf
pdf • 6.47 MB
STATCOM STATION LT SLD.pdf
pdf • 0.21 MB
Tender GA Bhadla-II STATCOM pkg.pdf
pdf • 0.72 MB
Tender GA Fatehgarh-II STATCOM pkg.pdf
pdf • 0.50 MB
Tender SLD Bhadla-II STATCOM Pkg.pdf
pdf • 0.22 MB
Tender SLD Fatehgarh-II STATCOM Pkg.pdf
pdf • 0.45 MB
All India 21-22 SEZ Ph_2_Peak ALT_III_Aligarh.sav
sav • 7.49 MB
All India 21-22 SEZ Ph_2_Off Peak ALT_III_Aligarh.sav
sav • 7.49 MB
Conceptual Connection Arrangement of 765kV System.pdf
pdf • 8.26 MB
Typical module drawings.pdf
pdf • 0.14 MB
400kV Fatehgarh-II SLD R2 Cat-I 11.11.2019.pdf
pdf • 1.30 MB
765,400kV Fatehgarh-2 Plan Layout R3 Cat-II 03.02.2020.pdf
pdf • 3.02 MB
765,400kV Fatehgarh-2 Section Layout R1 Cat-II 03.02.2020.pdf
pdf • 2.46 MB
Bhadla-II Earthmat Layout CAT-I 28.11.2019.pdf
pdf • 3.63 MB
01-Volume-III_First Stage Bid form and Attachments(Package-II).xls
xls • 4.09 MB
02-02_Volume III_Attachment-2_QR First Stage.doc
doc • 0.27 MB
02-07_Volume III_Attachment-5 First Stage-extra sheet.doc
doc • 0.04 MB
02-12_Volume-III_Attachment-12-IP.doc
doc • 0.07 MB
02-13_Volume III_Attachment-13 First Stage.doc
doc • 0.03 MB
02-19_Volume III_Attachment-19 First Stage.doc
doc • 0.05 MB
02-20_Volume-III_Attachment-20-SAFETY PACT.docx
docx • 0.04 MB
02-21_Volume-III_Attachment-21-KMP declaration.doc
doc • 0.03 MB
02-22_Volume-III_Attachment-22.docx
docx • 0.03 MB
03-Volume-III_Schedule-I-Unpriced BOQ 1st_Stage.xls
xls • 0.09 MB
01_Volume III_Bid Form Second Stage.doc
doc • 0.06 MB
01-01_Volume III_Attachment-4 to 11 (Second Stage).doc
doc • 0.12 MB
01-02_Price Schedules_Second Stage.xls
xls • 0.61 MB
01-12_Volume-III_Attachment-12_Authorization certificate issued by Domestic Manufacturer (Second Stage).docx
docx • 0.02 MB
01-13_Volume-III_Attachemnt-13_Affidavit for self-certifictaion (Second Stage).docx
docx • 0.02 MB
01-14_Volume-III_Attachment-14_Affidavit for self-certifictaion (Second Stage).DOCX
docx • 0.02 MB
01-15_Volume-III_Attachment-15_Certificate by Auditor (Second Stage).docx
docx • 0.02 MB
01-16_Volume-III_Attachment-16_Compliance to the process related to the e-RA (Second Stage).docx
docx • 0.02 MB
OBD_EXTN-VIII_LETTER.docx
docx • 0.17 MB
3-Amendment No 6.docx
docx • 0.02 MB
OBD_EXTN-VII_LETTER.docx
docx • 0.17 MB
2e-Volume-I_Annexure-C(BDS)_rev.docx
docx • 0.02 MB
OBD_EXTN-VI_LETTER.docx
docx • 0.17 MB
OBD_EXTN-V_LETTER.pdf
pdf • 1.08 MB
OBD_EXTN-IV_LETTER.docx
docx • 0.17 MB
Clarification No 3 (technical portion).docx
docx • 0.03 MB
OBD_EXTN-III_LETTER.pdf
pdf • 1.12 MB
OBD_EXTN-II_LETTER.pdf
pdf • 1.13 MB
3-Amendment No 4.docx
docx • 0.02 MB
2a-Volume-III_First Stage Bid form and Attachments(Package-II)_rev2.xls
xls • 4.09 MB
OBD_EXTN-I_LETTER.docx
docx • 0.17 MB
2b-Clarification No 1 (technical portion).docx
docx • 0.14 MB
2- Amendment No 1.DOC
doc • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .