Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.3 LAccepted-Finance 270 17TH WARD KARUMALAIKOODAL METTUR DAM 2 | METTUR DAM | ₹3.3 L | 1 | Accepted-Finance satisfied |
| 2 | 2₹3.5 LAccepted-Finance M 7 HOUSING BOARD UNIT MADHAYANKUTTAI PO METTUR DAM 636 452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | ₹3.5 L | 2 | Accepted-Finance satisfied |
| Sl No | Description | Qty | Unit | Tech and Mech Engineers and Erectors L2 | PRANAV ENGINEERING L1 |
|---|---|---|---|---|---|
| 1.00 | Charges for de-coupling the pump & its motor after disconnecting the Electric supply, de-positioning the Motor, Remove the Rotary assembly from casing and refitting the same after completion of overhauling works. | 12 | Nos. | 6,000 ₹72,000 | 5,500 ₹66,000 |
| 2.00 | Charges for dismantling the pump spares & renewal of worn-out parts by new one or reconditioning the spares if necessary and reassembling the same and other related work if any. | 12 | Nos. | 11,500 ₹1.4 L | 11,000 ₹1.3 L |
| 3.00 | Charges for removing the existing wear rings from impeller and refixing new rings, machining to required dimension, drilling & tapping works for crub screw arrangement. | 12 | Nos. | 2,200 ₹26,400 | 2,000 ₹24,000 |
| 4.00 | Charges for pump and motor alignment work | 12 | Nos. | 7,000 ₹84,000 | 6,900 ₹82,800 |
| 5.00 | Supply of bearings for Hot well makeup pumps & Boiler fill pumps | 12 | Set. | 1,800 ₹21,600 | 1,500 ₹18,000 |
| 6.00 | T&Ps and consumables | 1 | LS | 5,000 ₹5,000 | 4,000 ₹4,000 |
Tender Value
Refer Docs
EMD Value
₹3,100
Closing Date
20 Feb 2026, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I BM DM Plant Unit I to IV AOH COH 2026 Overhauling of Hot well makeup pumps 8 Nos and Boiler fill pump 4 Nos
2026_EB_652416_1
CE / MTPS-I / SE / M-I / BM /OT.505 / 2025-26
Open Tender
Power/Energy Projects/Products
40 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹3,100
Yes
26 Feb 2026
6 Feb 2026
21 Feb 2026
6 Feb 2026
20 Feb 2026
6 Feb 2026
Charges for de-coupling the pump & its motor after disconnecting the Electric supply, de-positioning the Motor, Remove the Rotary assembly from casing and refitting the same after completion of overhauling works.
Charges for dismantling the pump spares & renewal of worn-out parts by new one or reconditioning the spares if necessary and reassembling the same and other related work if any.
Charges for removing the existing wear rings from impeller and refixing new rings, machining to required dimension, drilling & tapping works for crub screw arrangement.
Charges for pump and motor alignment work
Supply of bearings for Hot well makeup pumps & Boiler fill pumps
T&Ps and consumables
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.78 MB
BOQ_782291.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid