| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAdmitted-Finance | ₹1.7 Cr | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | alliraj contractor L1 |
|---|---|---|---|---|
| 1.00 | Removing the black topping of any thickness and forming cable trench and cable duct at road crossing 75cm wide and 165cm deep (clear) including cost of providing sign boards, danger lights, indication arrangements, Reflective tapes wherever necessary, lead, lift, labour, tools & plants, etc., compete. | 164 | M3 | 1,741 ₹2,85,524 Lowest |
| 2.00 | Earth work excavation in all soils including slush and silt under water requiring the aid of basket and vessels and forming cable trench and cable duct at road crossing 75cm wide and 165cm deep (clear) including cost of providing sign boards, danger lights, indication arrangements, Reflective tapes wherever necessary and providing shoring and strutting arrangements wherever necessary, all lead, lift, labour, tools & plants, etc., complete. (Including Bailing Out of Water.) | 1,213 | M3 | 646 ₹7,83,598 Lowest |
| 3.00 | Filling with filling Sand in layers well rammed, watered and compacted as per standard specification including cost of all materials, lead, labour, etc., complete. | 261 | M3 | 2,248 ₹5,86,728 Lowest |
| 4.00 | Refilling with excavated earth is suitable in layers well consolidated as per standard spcification in trenchless including in all labour lead & lift etc.,complete as per the direction of Engineer at site. | 157 | M3 | 46 ₹7,222 Lowest |
| 5.00 | Transporting and clearing the excess excavated earth and debris than and there and as soon as immediately to avoid any hinderance to normal flow of traffic and publicf beyond a distance of 5km from the work spot as per the direction of Engineer at site including loading and unloading charges etc., complete. | 1,220 | M3 | 126 ₹1,53,720 Lowest |
| 6.00 | Labour charges for plain cement concrete 1:3:6 using 20mm HBG Stone including cost of all materials lead and lift etc complete. | 81 | M3 | 7,719 ₹6,25,239 Lowest |
| 7.00 | Bailing out of water by pumpset including cost of diesel pumpset 0.5HP cost of all materials labour lead and lift etc complete | 32 | Hrs | 432 ₹13,824 Lowest |
| 8.00 | Providing Steel Reinforcement including cost of steel labour for cutting,bending tying with binding wire and placing reinforcement as directed by the engineer at siteetc complete. | 41.1 | MT | 1,08,970 ₹44,78,667 Lowest |
| 9.00 | Providing and laying of Raft concrete in position machine batched, machine mixed and machine vibrated design mix cement concrete of M30 grade with a minimum cement content of 360 kg per cu.m for reinforced concrete structural elements under controlled water cement ratio, lead lift, labour etc complete but excluding cost of steel reinforcement RCC Raft | 149.5 | M3 | 15,149 ₹22,64,775.5 Lowest |
| 10.00 | Providing and laying of side wall concrete in position machine batched, machine mixed and machine vibrated design mix cement concrete of M30 grade with a minimum cement content of 360 kg per cu.m for reinforced concrete structural elements under controlled water cement ratio, lead lift, labour etc complete but excluding cost of steel reinforcement Side wall | 112 | M3 | 18,975 ₹21,25,200 Lowest |
Tender Value
Refer Docs
EMD Value
₹1.3 L
Closing Date
3 Jun 2025, 2:30 pmClosed
CE/TP-I/CNI
The Chief Engineer Transmission Projects I Chennai 3rd Floor 110 KV GIS Substation building A10 Guindy Industrial Estate Guindy Chennai 32
Providing RCC Cable duct for laying of 230KV 11200 Sq mm and 110KV UG Cable 1630 Sqmm XLPE Al.Ug Cable for making LILO of 230 KV NCTPS Gummidipoondi and Alamathy Periyapalayam OH Line at proposed 230 110KV Panjetty SS Reach 1
2025_EB_559845_1
TP1-14/2025-26 OF CE/TP-I/CNI
Open Tender
Civil Works
Works
120 days
Panjetty
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.3 L
30 Jun 2025
20 May 2025
4 Jun 2025
20 May 2025
3 Jun 2025
20 May 2025
Amount
Removing the black topping of any thickness and forming cable trench and cable duct at road crossing 75cm wide and 165cm deep (clear) including cost of providing sign boards, danger lights, indication arrangements, Reflective tapes wherever necessary, lead, lift, labour, tools & plants, etc., compete.
Earth work excavation in all soils including slush and silt under water requiring the aid of basket and vessels and forming cable trench and cable duct at road crossing 75cm wide and 165cm deep (clear) including cost of providing sign boards, danger lights, indication arrangements, Reflective tapes wherever necessary and providing shoring and strutting arrangements wherever necessary, all lead, lift, labour, tools & plants, etc., complete. (Including Bailing Out of Water.)
Filling with filling Sand in layers well rammed, watered and compacted as per standard specification including cost of all materials, lead, labour, etc., complete.
Refilling with excavated earth is suitable in layers well consolidated as per standard spcification in trenchless including in all labour lead & lift etc.,complete as per the direction of Engineer at site.
Transporting and clearing the excess excavated earth and debris than and there and as soon as immediately to avoid any hinderance to normal flow of traffic and publicf beyond a distance of 5km from the work spot as per the direction of Engineer at site including loading and unloading charges etc., complete.
Labour charges for plain cement concrete 1:3:6 using 20mm HBG Stone including cost of all materials lead and lift etc complete.
Bailing out of water by pumpset including cost of diesel pumpset 0.5HP cost of all materials labour lead and lift etc complete
Providing Steel Reinforcement including cost of steel labour for cutting,bending tying with binding wire and placing reinforcement as directed by the engineer at siteetc complete.
Providing and laying of Raft concrete in position machine batched, machine mixed and machine vibrated design mix cement concrete of M30 grade with a minimum cement content of 360 kg per cu.m for reinforced concrete structural elements under controlled water cement ratio, lead lift, labour etc complete but excluding cost of steel reinforcement RCC Raft
Providing and laying of side wall concrete in position machine batched, machine mixed and machine vibrated design mix cement concrete of M30 grade with a minimum cement content of 360 kg per cu.m for reinforced concrete structural elements under controlled water cement ratio, lead lift, labour etc complete but excluding cost of steel reinforcement Side wall
Providing and laying of Top cover Slab concrete in position machine batched, machine mixed and machine vibrated design mix cement concrete of M30 grade with a minimum cement content of 360 kg per cu.m for reinforced concrete structural elements under controlled water cement ratio, lead lift, labour etc complete but excluding cost of steel reinforcement
Providing Shoring and Strutting using necessary Country Wooden Planks 40mm thick and 8cm to 10cm dia. Casurina,vertical posts at every 300mm C/C of 1.80m height duly anchored 300mm into the ground for firm support including placing and making the two rows of planks of top and bottom and one middle row of casurina with strutt arrangements at top so as to afford easy laying as cables. The rate shall also include necessary storage charges for the casurina and Country Wooden Planks at suitable place so as not to affect the traffic and movement of public transporting them to work spot lead lift besides the cost of materials etc., complete. ( Any other improved method of shoring and strutting is also accelptable to TANTRANSCO. But at no extra cost to TANTRANSCO )
Supply and fixing of MS Channel including cast of all materils, labour charges lead lift etc., 100x50x5mm for Joint bay
Placing of steel barricade of size 2.4Mtr width & 1.2 Mtr height for the entire length of the trench on vehicular movement, etc complete
Supplying and laying the warning grid tape to cover the entire idth of the trench including transporting, cutting and pasting the same with required adhesive etc. Complete
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .