Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.4 LAccepted-Finance 0 VILLAGE CHAMPANER NAGLA BALLAM POST SANTOSHPUR GHAT ETAWAH UTTAR PRADESH 206253 | ETAWAH | UTTAR PRADESH | 206253 | L-1 | Accepted-Finance ACCEPT | |
| 2 | L-2₹1.4 L+₹3,860 (2.83%)Accepted-Finance | L-2 | Accepted-Finance ACCEPT | |
| 3 | L-3₹1.5 L+₹12,806 (9.39%)Accepted-Finance | L-3 | Accepted-Finance ACCEPT |
Tender Value
Refer Docs
EMD Value
₹1,370
Closing Date
26 Feb 2025, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EDC ETAWAH
STATION ROAD ETAWAH
79/EDCE/2024-25
2025_DVVNL_1003679_2
79/EDCE/2024-25
Open Tender
Repair and Maintenance Works
Item Wise
180 days
EDD II ETAWAH
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
DVVNL.ORG
₹1,370
7 Sept 2025
20 Feb 2025
27 Feb 2025
20 Feb 2025
26 Feb 2025
20 Feb 2025
Carriage of Following Materials from Store Center Kunera Etawah to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.
11/13 Mtrs. long ST pole / 9/8.5 Mtrs. long PCC pole
Line material i.e. conductor, G.I. wire TPMO stay rod, disc insulator, cross arm, Angle channel, Different type of Clamps and other required material
ACSR Weasel Conductor
PVC Cable Alluminium 3x70 Sqmm
25 KVA Distribution Transformer
63 KVA Distribution Transformer
Erection and grouting of Single pole structure. It also includes its grouting with cement, sand and brick for support, along with all relevant accessories, clamps and complete fixing of HT/LT fittings as per RESPO norms.
Erection and grouting of Double pole structure. It also includes its grouting with cement, sand and brick for support, along with all relevant accessories, clamps and complete fixing of HT/LT fittings as per RESPO norms.
Laying, sagging, stringing, binding & jumpering of ACSR Weasel Conductor on the newly erected pole as per RESPO.
Laying spreading, lifting and final sagging of Alluminium Cable Sutaible Size. including fixing of all accessories as per RESSPO.
Installation of stay set with grouting and Nuzzling etc. as per Resspo drawing /norms along with all routine material to be used for such works.
Earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour T&P and required material for such work.
Mounting of 25 KVA Transformer on the Single Pole/Double pole/Plinth structures and connections thereof.
Mounting of 63 KVA Transformer on the Single Pole/Double pole/Plinth structures and connections thereof.
Safe carriage of LT 3P4W Prodigy Meter 40-200 A (DLMS) and its proper installation at pit site as per RESSPO Manuals
Safe carriage of Energy Meter 10-60A 3 Phase 4 Wire and its proper installation at pit site as per RESSPO Manuals
Installation & Fixing of following accessories. including the cost of labour, T&P and carrier etc. required for proper completion of work.
Dropper Channel
MS Top Channel
MS T-Off Channel
11 Kv DP Clamp
11 Kv Cross Arm Holding Clamp
11 Kv Composite Polymer Pin Insulator
11 Kv Polymer Disc Insulator
11 Kv Cross Arm V type
11 Kv TPMO
11 Kv DO Fuse Set
TF Base Angle
Nut Bolt with Washer
KHALSA CEMENT AGENCY (BID ID -5000099)
SANDHYA TRADERS (BID ID -5000107)
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .