DISTRICT ENGINEER
DB CHATRA
CONSTRUCTION OF P.C.C. ROAD FROM NH-100 TO DEGREE MAHAVIDYALAYA IN VILLAGE -BANASADI G.P-BANASADI, BLOCK-SIMARIA DIST-CHATRA
2026_ZPCHT_115616_1
NIT No. 23/2026-27, Gr No. 03
Open Tender
Civil Works
SIMARIYA
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹1.1 L
27 Jun 2026
27 Jun 2026
8 Jul 2026
29 Jun 2026
6 Jul 2026
29 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing Grass and Removal of Rubbish Road Land. up to a lead of 50 metres outside the periphery of the area. By Manual Means) S.O.R. PART - A Item No. 2.02 | 0.22 | Ha | 19,760.3 | ₹4,347.27 |
| 2 | Compacting Original ground supporting sub-grade Loosening of the ground upto a level of 500 mm below the sub-grade level, watered, graded and compacted in layers to meet requirement of Table 300-2 for sub-grade construction.
SOR Item No. 3.20 Case-1 | 166.39 | M3 | 52.6 | ₹8,752.11 |
| 3 | Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2)
S.O.R. Item No. 3.18 | 53.55 | M3 | 131.3 | ₹7,031.12 |
| 4 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.
(i) grading-I Material
S.O.R. Item No. R.W.D 4.01 B (I) | 154.91 | M3 | 1,437.6 | ₹2,22,698.62 |
| 5 | Construction of un-reinforced, dowel jointed at expansion and construction joint only, Plain Cement Concrete Pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501
S.O.R. Item No. 6.02 | 315.55 | M3 | 5,360.4 | ₹16,91,474.22 |
| 6 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.) (I) Ordinary Soil (Depth up to 3 m)
S.O.R. Item No. 3.13 I B (I) | 170.64 | M3 | 55.8 | ₹9,521.71 |
| 7 | Construction of dry rubble flooring at cross drainage works for relatively less important works.
S.O.R. Item No. 16.09 | 20.49 | M3 | 1,544.4 | ₹31,644.76 |
| 8 | Plain/Reinforced cement concrete in open foundation complete as per drawing and Technical Specifications
(P.C.C. Grade M-15)
S.O.R. Item No. 12.08 (A) Case II | 26.67 | M3 | 3,754.4 | ₹1,00,129.85 |
| 9 | Stone masonry work in cement mortar in Random Rubble Masonry (1:3) foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203)
S.O.R item no- 12.07(B) | 82.95 | M3 | 3,458.6 | ₹2,86,890.87 |
| 10 | Stone masonry in cement mortar for in Random Rubble Masonry (1:3) substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204
S.O.R item no- 13.04(A) | 33.87 | M3 | 3,468.8 | ₹1,17,488.26 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
Tenderdocuments.pdf
Tender Documents • 1.13 MB
BOQ_156372.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid