| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 CrAccepted-AOC | ₹2.8 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.8 Cr+₹4.2 L (1.52%)Rejected-AOC UTTAR PRADESH 229001 | RAE BARELI | UTTAR PRADESH | 229001 | ₹2.8 Cr+₹4.2 L (1.52%) | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | Shivank Enterprises L2 | JMD INFRASTRUCTRE L1 |
|---|---|---|---|---|---|
| 1.00Reconstruction of Damaged V.R.B. at km 5.540,km. 13.000 & km. 20.800 of Chhobh nala-2, km. 1. | |||||
| 1.01 | Earth work in Excavation of foundation in ordinary soil / sandy, loam ,clay or sand including lift up to 1.5 mtr and lead up to 30 mtr. Including back filling , watering ,ramming of excavated Earth in to the trenches or up to the space and sides of the foundation. | 2,917.9 | CUM | 120 ₹3,50,148 | 92 ₹2,68,446.8 Lowest |
| 1.02 | C.C work in (1:2:4) mix in kabrai stone grit of size 20 to 40 mm and Banda coarse sand including all cost of material, labour and T&P etc complete .(Lean Concrete). | 220.16 | CUM | 7,776 ₹17,11,964.16 | 7,700 ₹16,95,232 Lowest |
| 1.03 | Centering & Shuttering for RCC Work with all cost of material, labour and T&P etc complete. | 2,557.21 | SQM | 1,023 ₹26,16,025.83 | 950 ₹24,29,349.5 Lowest |
| 1.04 | Cutting, bending, binding and placing in postion of steel Reinforcement including all cost of material, labour and T&P etc complete. | 114.89 | MT | 85,093 ₹97,76,760.23 | 85,000 ₹97,66,075 Lowest |
| 1.05 | Providing and Laying Reinforced Cement concrete in M-20 (1:1.5:3) with kabrai stone grit of size 10 to 20 mm and Banda coarse sand including all cost of material, labour and T&P etc complete. | 1,035.88 | CUM | 9,250 ₹95,81,890 | 9,200 ₹95,30,096 Lowest |
| 1.06 | C.C work in (1:1:2) mix in kabrai stone grit of size 10 to 20 mm and Banda coarse sand including all cost of material, labour and T&P etc complete. | 260.87 | CUM | 10,197 ₹26,60,091.39 | 10,000 ₹26,08,700 Lowest |
| 1.07 | P/L 100 mm dia PVC drainage spout including all cost of material, labour and T&P etc complete. | 24 | CUM | 233 ₹5,592 Lowest | 233 ₹5,592 Lowest |
| 1.08 | Earth work in making Road diversion including all lead,lift , labour and T&P etc complete. | 1,883.76 | CUM | 120 ₹2,26,051.2 | 110 ₹2,07,213.6 Lowest |
| 1.09 | Earth work in Removing of Road diversion including all lead,lift , labour and T&P etc complete. | 1,185.84 | CUM | 120 ₹1,42,300.8 Lowest | 120 ₹1,42,300.8 Lowest |
Tender Value
Refer Docs
EMD Value
₹5.8 L
Closing Date
10 Apr 2025, 5:00 pmClosed
Superintending Engineer
Office of Superintending Engineer Drainage Circle Lucknow
Reconstruction of Damaged V.R.B. at km 5.540,km. 13.000 and km. 20.800 of Chhobh nala-2, km. 1.000 of siddhour drain and km. 13.700 of Chhobh nala-1 in District Raebareli
2025_UPIDC_1024471_1
Letter no.344/DCL/eTender/Dt.06.02.25
Open Tender
Civil Works
Fixed-rate
270 days
Raebareli U.P.
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,409
₹5.8 L
2 Sept 2025
3 Apr 2025
11 Apr 2025
3 Apr 2025
10 Apr 2025
3 Apr 2025
Amount
Reconstruction of Damaged V.R.B. at km 5.540,km. 13.000 & km. 20.800 of Chhobh nala-2, km. 1.
Earth work in Excavation of foundation in ordinary soil / sandy, loam ,clay or sand including lift up to 1.5 mtr and lead up to 30 mtr. Including back filling , watering ,ramming of excavated Earth in to the trenches or up to the space and sides of the foundation.
C.C work in (1:2:4) mix in kabrai stone grit of size 20 to 40 mm and Banda coarse sand including all cost of material, labour and T&P etc complete .(Lean Concrete).
Centering & Shuttering for RCC Work with all cost of material, labour and T&P etc complete.
Cutting, bending, binding and placing in postion of steel Reinforcement including all cost of material, labour and T&P etc complete.
Providing and Laying Reinforced Cement concrete in M-20 (1:1.5:3) with kabrai stone grit of size 10 to 20 mm and Banda coarse sand including all cost of material, labour and T&P etc complete.
C.C work in (1:1:2) mix in kabrai stone grit of size 10 to 20 mm and Banda coarse sand including all cost of material, labour and T&P etc complete.
P/L 100 mm dia PVC drainage spout including all cost of material, labour and T&P etc complete.
Earth work in making Road diversion including all lead,lift , labour and T&P etc complete.
Earth work in Removing of Road diversion including all lead,lift , labour and T&P etc complete.
Earth work in making of Drain diversion including all lead,lift , labour and T&P etc complete.
Brick on edge pitching with M-15 class bricks including preparation of sub grade and filling joints with local sand etc. Complete.
Supplying & fixing of sign board of size 1.20Mx 0.90M, made by Angle Iron 40x40x6mm with M.S. sheet of 18 S.W.G. with bracing of 25x25 mm flat iron including excavation of pit 30x30x30 CM and fixing C. C. 1:2:4 with painting and writing letters as per direction of Engineer - in - charge.
Supplying and fixing of 100 mm dia PVC pipe in weep hole including cost of all mateiral, labour T&P etc required for proper completion of work.
Boring and drilling with 100mm dia PVC pipe for dewatering with all cost of material , labour and t&p complete.
Hiring of 5H.P Diesel Pump Set including operator,POL etc complete.
Dismentalling / removing damaged structure including labour and T&P etc complete.
Supplying and Laying of 300 GSM non woven jio textiles
Supplying and fixing of Joint filler board Per SqM
Shivank Enterprises (BID ID -5110439)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tenderdocument.pdf
Tender Documents • 1.96 MB
BOQ.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .