Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 CrAdmitted-Finance | ₹4.7 Cr | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SHREE ABIRAMI ENGGINEERING WORKS PRIVATE LIMITED L1 |
|---|---|---|---|---|
| 1.00Material Portion | ||||
| 2.00 | Supply of 420kV,800A/1250A HV OIP Bushing | 1 | Nos | 19,80,000 ₹19.8 L |
| 3.00 | Supply of 245kV,800A/1250A LV OIP Bushing | 1 | Nos | 6,30,000 ₹6.3 L |
| 4.00 | Supply of Neutral OIP Bushing | 1 | No | 1,35,000 ₹1.4 L |
| 5.00 | Supply of 52kV/2000A 300BCT Solid stem type OIP Condenser Bushing | 2 | Nos | 1,80,000 ₹3.6 L |
| 6.00 | Supply of insulation | 1 | LS | 45,00,000 ₹45 L |
| 7.00 | Supply of New Transformer oil | 10,000 | Litre | 118.8 ₹11.9 L |
| 8.00 | Gasket and Hardwares | 1 | Unit | 1,98,000 ₹2.0 L |
| 9.00 | Supply and replacement of Marshalling Box | 1 | Unit | 1,98,000 ₹2.0 L |
| 10.00 | Supply and replacement of RTCC Panel | 1 | Unit | 2,25,000 ₹2.3 L |
Updated dates
Tender Value
₹2.4 Cr
EMD Value
₹2.1 L
Closing Date
17 Feb 2026, 2:00 pmClosed
CE/TP-I/Guindy
Thiru-vi-ka industrial estate Guindy
Repairing and reconditioning of 1 No 105 MVA Y phase single unit of 400_230kV ICT of total capacity 315MVA BHEL make SlNo 6006649 YOM 2009 failed at Sunguvarchatram 400 KV SS
2026_EB_645936_1
TP1-141/2025-26
Open Tender
Electrical Works
120 days
chennai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2.1 L
Yes
12 Mar 2026
22 Jan 2026
18 Feb 2026
22 Jan 2026
17 Feb 2026
22 Jan 2026
Supply of 420kV,800A/1250A HV OIP Bushing
Supply of 245kV,800A/1250A LV OIP Bushing
Supply of Neutral OIP Bushing
Supply of 52kV/2000A 300BCT Solid stem type OIP Condenser Bushing
Supply of insulation
Supply of New Transformer oil
Gasket and Hardwares
Supply and replacement of Marshalling Box
Supply and replacement of RTCC Panel
Supply and replacement of DM Box
Supply and replacement of Cooling fan
Supply and replacement of Radiators
Supply and replacement of Breather 5 kg
Supply and replacement of Breather 1kg
Supply and replacement of Oil pump
Supply and replacement of Bucholz relay
Supply and replacement of PRV
Supply and replacement of MOG
Supply and replacement of Oil flow meter
Labour Portion
Dismantling and loading of transformer
Insurance for transit & storage period at firm works(Rs.2 Crore Reimbursement)
Untanking of the core coil assembly and inspection jointly with customer representative Low voltage testing of the core coil assembly.Removal of top yoke core laminations. Dismantling of winding of transformer Assembling of windings with old winding cylinders and new insulation assembly Yoke filling & connections to be carried out.Processing of the core coil assembly. Carrying out all final checks prior to retanking the core coil assembly Placement of core coil assembly back inside the tank. Replacement of all gaskets and O-rings with new ones. Erection of bushings Filling new transformer oil in main tank and oil processing of transformer. Draining of oil and dismantling of transformer. Painting of Transformer (outside) Blanking, gas pressurization and making transformer.Ready for dispatch
VPD Process
Routine Testing at our works as per IS
Transit insurance for transporting of 105MVA ICT from M/s SAEW to allotted site(Rs 2 crore Reimbursement
Unloading of transformer at site
Reinsulation of all coils
Transportation charges
Charges for Transportation of transformer from SV Chatram SS to firm
Charges for Transporting transformer from firm to allotted SS
CGST in % (For Bidders inside TamilNadu)
SGST in % (For Bidders inside TamilNadu)
IGST in % (For Bidders outside TamilNadu)
Please Enable Macros to View BoQ information
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
BOQ_774283.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid