Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.9 LAdmitted-Fee/PreQual/Technical/Finance AT NARANPARA PO CHANDOL PS KENDRAPARA SADAR DIST KENDRAPARA PIN 754208 | KENDRAPARA | ODISHA | 754208 | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹4.1 L+₹22,993.21 (5.89%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹4.2 L+₹33,077.95 (8.47%)Admitted-Fee/PreQual/Technical/Finance AT PO KANTILO WARD NO 51 NAYABAZAR MADHUPATNA CUTTACK 753004 | CUTTACK | ODISHA | 753004 | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹5.0 L+₹1.1 L (29.1%)Admitted-Fee/PreQual/Technical/Finance AT ROUTRAPUR P O KALAPADA DIST CUTTACK PIN 754112 | CUTTACK | CUTTACK | ODISHA | 754112 | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L4₹5.0 L+₹1.1 L (29.1%)Admitted-Fee/PreQual/Technical/Finance AT GOBINDPUR P O P S SAILO GOVINDPUR DIST CUTTACK PIN 754003 | CUTTACK | CUTTACK | ODISHA | 754003 | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹5.0 L
EMD Value
₹5,042
Closing Date
7 Jul 2026, 5:00 pmClosed
Divisional Officer
At.-REO Colony, P.O.-Nayabazar, Dist.-Cuttack
S/R to Biribati Dighi Road for the year 2026-27
2026_CERWI_133624_1
RWD Ctc-05/2026-27
Open Tender
Civil Works - Roads
Percentage
30 days
Cuttack
Refer tender documens
2 documents required · 2 mandatory
₹4,000
₹5,042
Yes
17 Jul 2026
29 Jun 2026
8 Jul 2026
29 Jun 2026
7 Jul 2026
29 Jun 2026
29 Jun 2026 - 6 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing grass and removal of rubbish on both sides of the road to facilitate widening of berms, disposal of the stuff including all labour. T&P articles required for the work etc. complete as per the specification and direction of the Engineer-in-charge. | 864 | sqm | 8.63 | ₹7,456.32 |
| 2 | Scarping cleaning the road surface applying tack coat using 3.00 kg of bitumen for 10 Sqm and laying 37.5 mm thick built-up spray grouting in one layer using 0.45 cum of 25 mm to 40 mm size hard granite metal and 12.00 kg of 80/100 grade bitumen for 10 Sqm with 0.12 cum of 12mm size h.g.c.b. chips as key stone for 10 sqm spreading over and laying including heating , pouring and spreading over and spreading bitumen, metal , chips and rolling with P.R.R including hire & running charges of P.R.R and all other machinaries with all cost, conveyance, royality, taxes of materials, labour with T&P required for the work etc. complete as per specification and direction of Engineer-in-charge. | 111.51 | sqm | 422.62 | ₹47,126.36 |
| 3 | Providing and applying tack coat using bitumen of 80/100 grade grade @0.2kg per sqm on the prepared granular surface / bitumenous surface cleaning with hydraulic brooms including cost, conveyance, royality, taxes of all materials, labour with articles required for the work T&P etc. complete as per specification and direction of the Engineer-in-Charge. | 968.49 | sqm | 22.68 | ₹21,965.35 |
| 4 | Providing and laying 20mm thick Open Graded Premix Carpet using 13.2mm to 5.6mm size C.B.H.G. stone aggregates using mini Hot mix Plant over prepared surface using a total quantity of 14.6 kgs of 80/100 grade Bitumen per 10.0Sqm and compacting with 8 -10T power road roller including hire & running charges of PRR, T&P, cost conveyance royality & taxes of all materials,labour charges for cleaning the surface spreading laying and cambering premix carpet for finished item of work etc.complete as per the specification and direction of the Engineer-in-Charge. | 1,080 | sqm | 270.41 | ₹2,92,042.8 |
| 5 | Providing & laying 6mm thick pre-coated seal coat type-B using 0.06cum of 6.7mm size C.B.H.G.chips as per sieve analysis & 6.8kg of 80/100 grade bitumen per 10sqm including hire and running charges of PRR, Hot mix plant, tar boiler & all other T&P articles including cost, conveyance, royalty, taxes of all materials etc. complete as per specification and direction of the Engineer-in-Charge. | 1,080 | sqm | 110.21 | ₹1,19,026.8 |
| 6 | Earthwork in embankment in all kind of soils from approved borrow areas with all lead and lifts over intial lead and lift and laying on properly prepared surface including spreading, levelling the earth not exceeding 30 cm in layers, Sectioning, Watering & ordinary compaction by PRR for finished item of work including all cost, royalty, labour, T & P article required for the work etc. Complete as per the specification and direction of the Engineer-in-Charge. | 43.2 | cum | 384.71 | ₹16,619.47 |
stage.html
html • 0.03 MB
finance_598744.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 1.33 MB
Tendernotice_1.pdf
PDF • 0.63 MB
BOQ_598744.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .