| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.2 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹2.3 L+₹2,821.47 (1.26%)Admitted-Finance B 14A H 11 ULTADANGA ROAD KOLKATA 700004 | KOLKATA | WEST BENGAL | 700004 | L2 | Admitted-Finance | ||
| 3 | L3₹2.3 L+₹7,188.04 (3.21%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹2.2 L
EMD Value
₹4,500
Closing Date
6 Oct 2026, 2:00 pmClosed
D.G.(S_D)
5, S.N. BANERJEE ROAD Kolkata-700 013
REPAIRING OF LABOUR QUATER NO. 3/0/6 AT SECTOR 3 WATERPROOFING OF CESC INCOMER ROOM AND OTHER ANCILLARY CIVIL WORKS AT PALMER BAZAR DPS.
2026_KMC_1043015_1
KMC/(S_D)/DPS/26-27/03
Open Tender
CIVIL WORKS
Percentage
30 days
PALMER BAZAR DPS
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹4,500
13 Oct 2026
29 Sept 2026
8 Oct 2026
29 Sept 2026
6 Oct 2026
29 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BUILDING WORKS (K) PAINTING, VERNISHING
ETC?(B)MISCELLANEOUS ITEMS.(3)Removing old paint from
blistered painted surface of steel or other metal by chipping including
scraping and cleaning and exposing the original
surface.N.B.:(Payment against item (1, 2, 3, 4) of subhead B will be
made only when done at specific direction of the Engineer- in-charge.
Cost of taking out shutter etc.for this item and rehanging the same or
changing glass panes cracked or broken in the operation will be
deemed to be covered by the rate of this item and no seperate
payment therefore shall be made.) | 154.1 | SQM | 47 | ₹7,242.7 |
| 2 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES
ETC 10. Stripping off worn out plaster and raking out joints of walls,
celings etc. upto any height and in any floor including removing
rubbish within a lead of 75m as directed. | 12.93 | SQM | 19 | ₹245.67 |
| 3 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING,
POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor,
ceiling etc.) with sand and cement mortar including rounding off or
chamfering corners as directed and raking out joints including
throating, nosing and drip course, scaffolding/staging where
necessary (Ground floor).[Excluding cost of chipping over concrete
surface] i) With 1:6 cement mortar (b) 20 mm thick plaster | 12.93 | SQM | 167 | ₹2,159.31 |
| 4 | SECTION 1. ------------BUILDING WORKS (J)WHITE WASH,
COLOUR WASH, DISTEMPER A. ORIGINAL WORKS 8 Applying
Exterior grade Acrylic primer of approved quality and brand on
plastered or cencrete surface old or new surface to receive decorative
textured (matt finish) or smooth finish acrylic exterior emulsion paint
including scraping and preparing the surface throughly, complete as
per manufacturer's specification and as per direction of the EIC. In
Ground Floor: (b) Two Coats [This item to be done under specific
instruction of the Superintending Engineer]N.B.:-Extra for each
additional floor in external walls refer item 1 of subhead C | 0.89 | PER 100 SQM | 4,510 | ₹4,018.41 |
| 5 | SECTION 1. ------------BUILDING WORKS (J)WHITE WASH,
COLOUR WASH, DISTEMPER A. ORIGINAL WORKS 17 Protective
and Decorative Acrylic exterior emulsion paint of approved quality, as
per manufacturer's specification and as per direction of
Engineer-in-Charge to be applied over acrylic primer as required. The
rate includes cost of material, labour, scaffolding and all incidental
charges but excluding the cost of primer. In Ground floor (Two Coat)
b) Premium 100% Acrylic Emulsion N.B. The items [17 (b) & 17(c)] of
subhead A are to be selected only with written permission of
Superintending Engineer for very resticted and small areas of a
building. | 89.1 | SQM | 84 | ₹7,484.4 |
| 6 | SECTION 1. ------------BUILDING WORKS (J)WHITE WASH,
COLOUR WASH, DISTEMPER A. ORIGINAL WORKS 7 Applying
Interior grade Acrylic Primer of approved quality and brand on
plastered or cencrete surface old or new surface to receive
Distemper/ Acrylic emulsion paint including scraping and preparing
the surface throughly, complete as per manufacturer's specification
and as per direction of the EIC. (In Ground Floor) (b) Two Coats ii)
Solvent based interior grade Acrylic Primer [This item to be done
under specific instruction of the Superintending Engineer] | 0.65 | PER 100 SQM | 4,850 | ₹3,152.5 |
| 7 | SECTION 1. ------------BUILDING WORKS (K) PAINTING,
VERNISHING ETC A. ORIGINAL WORKS 2 (A) Painting with best
quality synthetic enamel paint of approved make and brand including
smoothening surface by sand papering etc. including using of
approved putty etc. on the surface, if necessary :(a) On timber or
plastered surface :With super gloss (hi-gloss) -(iv) Two coats (with
any shade except white) | 65 | SQM | 81 | ₹5,265 |
| 8 | BUILDING WORKS (G) WOOD AND PVC WORKS E. REPAIR
WORKS30.Labour for taking out door and window frame including
shutter for repair or replacement of different parts of the frame &
refixing the same including mending good all damaes complete.
(Concrete and brick work for mending damage will bepaid
separately)(b) Above area 2.5 Sq.m | 10.98 | SQM | 146 | ₹1,603.09 |
| 9 | BUILDING WORKS (G) WOOD AND PVC WORKS A. DOOR
WINDOW FRAME 1. Wood work in door and window frame fitted and
fixed in position complete including a protective coat of painting at the
contact surface of the frame exluding cost of concrete, Iron Butt
Hinges and M.S clamps. (The quantum should be correted upto three
decimals). (b) Ordinary teak. Note: Extra for Lifting Charges for each
additional floor, i) Rs. 200/- per Cu.m (upto 4th floor) ii)
Rs.250/-(above 4th floor) | 0.05 | CUBIC METER | 1,13,653 | ₹6,016.51 |
| 10 | BUILDING WORKS (G) WOOD AND PVC WORKS B. DOOR
WINDOW SHUTTER 1. Panel shutters of door and window, as per
design (each panel consisting of single plank without joint), including
fitting and fixing the same in position but excluding the cost of hinge
and other fittings. In ground floor. (In case of non-supply of single
plank, penal rate of reduction of 20% will be made) (i) 50mm thick
shutters with 25mm thick panel of size 30 to 45 cm (a) 1st class best
Indian teak. Note: i) Lifting Charges for upper floors refer item H (2).
(ii) In case of panel with Rly. Type batton the rates will be reduced by
Rs.20.00 /Sq.m.) | 6.86 | SQM | 7,241 | ₹49,673.26 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
form.pdf
Tender Documents • 0.50 MB
BOQ_2559658.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .