Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹49.6 LAccepted-AOC | ₹49.6 L | L-1 | Accepted-AOC Accepted as L-1 |
| 2 | L-2₹75.5 L+₹25.9 L (52.2%)Rejected-Finance WARD NO 06 RANJCET DAFAI AMLAI COLLIERY DISTT ANUPPUR M P | ANUPPUR | ANUPPUR | MADHYA PRADESH | ₹75.5 L+₹25.9 L (52.2%) | L-2 | Rejected-Finance Rejected as L-2 |
| 3 | L-3₹75.6 L+₹26.0 L (52.3%)Rejected-Finance | ₹75.6 L+₹26.0 L (52.3%) | L-3 | Rejected-Finance Rejected as L-3 |
| Sl No | Description | Qty | Unit | VIKASH KUMAR VISHWAKARMA L1 | UDAY RAJ SINGH L2 | SURENDRA KUMAR SINGH L3 |
|---|---|---|---|---|---|---|
| 1.00PARTICULAR | ||||||
| 1.01 | Cleaning/ removal of debris/stone from galleries and stacking within 50m distance | 118.18 | cubic mtr | 34,272.2 ₹40,441.2 Lowest | 70,198.92 ₹82,834.73 | 70,435.28 ₹83,113.63 |
| 1.02 | Cutting in soft stone by Chisel & Hammer | 7.9 | cubic mtr | 30,810 ₹36,355.8 Lowest | 47,447.4 ₹55,987.93 | 47,479 ₹56,025.22 |
| 1.03 | Cutting of coal by using chisel/pick-axe | 46.75 | cubic mtr | 56,100 ₹66,198 Lowest | 77,044 ₹90,911.92 | 77,137.5 ₹91,022.25 |
| 1.04 | RCC (1:2:4) in wall/roof ceiling of air crossing/ stopping (any thickness) in u/g (Excluding centring, shuttering, reinforcement cutting, bending, placing in position and binding etc all complete as well as cost of RCC materials) | 235.28 | cubic mtr | 7,99,952 ₹9,43,943.36 Lowest | 12,46,984 ₹14,71,441.12 | 12,46,984 ₹14,71,441.12 |
| 1.05 | Centring, shuttering, finishing and reinforcement including cutting, bending, placing in position and binding and strutting, propping etc complete. | 2,555.92 | sq. mtr | 15,33,552 ₹18,09,591.36 Lowest | 26,45,377.2 ₹31,21,545.1 | 26,45,377.2 ₹31,21,545.1 |
| 1.06 | 06 mm Thick cement plaster/cement punning (1:4) to RCC/PCC work in u/g including curing etc complete(exclusive cost of materials) | 1,277.96 | sq. mtr | 3,83,388 ₹4,52,397.84 Lowest | 4,80,512.96 ₹5,67,005.29 | 4,85,624.8 ₹5,73,037.26 |
| 1.07 | Loading of all kinds of building materials into Tub at Incline/pit mouth on surface with lead of 50m
CEMENT | 1,576 | Bag | 14,184 ₹16,737.12 Lowest | 16,548 ₹19,526.64 | 16,548 ₹19,526.64 |
| 1.08 | SAND | 114.55 | cubic mtr | 28,637.5 ₹33,792.25 Lowest | 36,312.35 ₹42,848.57 | 36,312.35 ₹42,848.57 |
| 1.09 | STONE AGGREGATE (20mm) | 209.4 | cubic mtr | 52,350 ₹61,773 Lowest | 66,379.8 ₹78,328.16 | 66,379.8 ₹78,328.16 |
Tender Value
₹69.3 L
EMD Value
₹86,600
Closing Date
30 May 2026, 5:00 pmClosed
STAFF OFFICER MINING
OFFICE OF THE STAFF OFFICER MINING
Construction of 55 Nos. RCC Ventilation Stoppings in VI Top (Combined) seam for proposed depillaring Panel C3 and C4 at Bangwar UG Mine
2026_SECL_359588_1
SECL/SGP/SO(M)/2025-26/NIT-730 dated 14-05-2026
Open Tender
Civil Works - Others
Item Rate
365 days
BANGWAR UG MINE
as per NIT
8 documents required · 8 mandatory
₹86,600
8 Sept 2026
14 May 2026
1 Jun 2026
14 May 2026
30 May 2026
15 May 2026
14 May 2026 - 23 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1PARTICULAR | |||||
| 1.01 | Cleaning/ removal of debris/stone from galleries and stacking within 50m distance | - | cubic mtr | 545.17 | - |
| 1.02 | Cutting in soft stone by Chisel & Hammer | - | cubic mtr | 5,510.07 | - |
| 1.03 | Cutting of coal by using chisel/pick-axe | - | cubic mtr | 1,512.57 | - |
| 1.04 | RCC (1:2:4) in wall/roof ceiling of air crossing/ stopping (any thickness) in u/g (Excluding centring, shuttering, reinforcement cutting, bending, placing in position and binding etc all complete as well as cost of RCC materials) | - | cubic mtr | 4,925.15 | - |
| 1.05 | Centring, shuttering, finishing and reinforcement including cutting, bending, placing in position and binding and strutting, propping etc complete. | - | sq. mtr | 945.21 | - |
| 1.06 | 06 mm Thick cement plaster/cement punning (1:4) to RCC/PCC work in u/g including curing etc complete(exclusive cost of materials) | - | sq. mtr | 343.79 | - |
| 1.07 | Loading of all kinds of building materials into Tub at Incline/pit mouth on surface with lead of 50m
CEMENT | - | Bag | 9.69 | - |
| 1.08 | SAND | 1 | cubic mtr | 290.84 | ₹290.55 |
| 1.09 | STONE AGGREGATE (20mm) | - | cubic mtr | 290.84 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.76 MB
Tendernotice_2.pdf
PDF • 1.48 MB
BOQ_372447.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .